NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria                       Acceptable Solution                       Comments

Design, construction and safety – pontoons

                                                the sizing and grading of filter
                                                layers and armour materials;
                                           d) if a relevant planning scheme
                                                standard is more stringent than
                                                the standard in paragraph (a), (b)
                                                or (c) – the relevant planning
                                                scheme standard, to the extent it
                                                is more stringent than the
                                                standard in paragraph (a), (b) or
                                                (c).
 19.4 Prescribed tidal works that are      The design and construction of the        Not applicable.
 a revetment or seawall are not            revetment or seawall is consistent
 adversely affected by hydrostatic         with the following standards:-
 pressure.
                                           a)   subject to paragraph (b), AS 4678    The proposal is not a revetment or
                                                                                     seawall.
                                                to the extend requirements
                                                stated in the Standard apply to
                                                hydrostatic pressure for earth-
                                                retaining structures;
                                           b)   if a relevant planning scheme
                                                standard is more stringent than
                                                the standard in paragraph (a) –
                                                the relevant planning scheme
                                                standard, to the extent it is more
                                                stringent than the standard in
                                                paragraph (a).

Performance Criteria                       Acceptable Solution                       Comments

Design, construction and safety – wharves

20.1 Prescribed tidal works that are a     The design and construction of the        Not applicable.
wharf are designed and constructed         wharf is consistent with the following
in a way to ensure it is able to support   standards:-
its intended loads, having regard to
its relevant loading matters.              a)   subject to paragraph (b):-           The proposal is not a wharf.
                                                i) for a wharf constructed
                                                    within a marina – AS 3962 to
                                                    the extent requirements
                                                    stated in the Standard apply
                                                    to relevant loading matters
                                                    for     the     design     or
                                                    construction of the wharf; or
                                                ii) for a wharf not constructed
                                                    within a marina – each of the
                                                    following          Australian
                                                    Standards to the extent
                                                    requirements stated in the
                                                    Standard apply to relevant
                                                    loading matters for the
Log in to download the original file

13. OBoat Hire - Prescribed Tidal Works Code.pdf · 289 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.