13. OBoat Hire - Prescribed Tidal Works Code
Attached to the e-mail OBoat Hire - Proposed landing redevelopment - 222 Gympie Terrace Noosaville - Email 2 of 2.
NOOSA RIVER ENTERPRISES PTY LTD AS TRUSTEE UNDER INSTRUMENT 708121382 – PRESCRIBED
TIDAL WORKS – OBOATS REDEVELOPMENT
Performance Criteria Acceptable Solution Comments
Lighting
hooded and directed access will be downward directed and
downwards; hooded.
b) subject to paragraph (c), each
lighting standard, to the extent
relevant;
c) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) or (b) – the relevant
planning scheme standard, to the
extent the standard is more
stringent than the standard
mentioned in paragraph (a) or
(b);
d) any other relevant planning
scheme standard that is not
inconsistent with the standards
mentioned paragraphs (a) to (c).
Performance Criteria Acceptable Solution Comments
Signage
6.1 A sign erected or otherwise placed A sign erected or otherwise placed in Compliant.
in position for prescribed tidal work, position for prescribed tidal work,
other than a sign erected or placed for other than a sign erected or placed for
safety reasons or under an Act:- safety reasons, is consistent with the
following:- No signage is proposed as part of this
a) is compatible with the character application other than identifying the
a) subject to paragraph (c), a sign property to which the structure
and amenity of the work’s
belongs. This signage or “marking” is
immediate surroundings and the erected or placed in position for
located on the pontoon.
locality within which the work is identifying prescribed tidal work,
located; and or the owner of the work, is the
b) is not a dominant feature of the only sign erected or placed in
work, unless the dominance is for position for identifying the work
safety reasons. or owner;
b) subject to paragraph (c), a sign
erected or otherwise placed in
position for prescribed tidal work
is integrated into the design and
construction of the work;
c) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) – the relevant
planning scheme standard, to the
extent it is more stringent than
the standard mentioned
paragraph (a);
d) any other relevant planning
scheme standard that is not