Plans for Approval

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                              SURVEY                                                                                                                           EROSION & SEDIMENT CONTROL                                                                                               8.    THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO BACKFILLING OF
                                                                                                                                                                                                                                                              1.     THIS DESIGN IS BASED ON SURVEY PROVIDED BY LAND SURVEYING DYNAMICS (LSD).                                                 OBJECTIVES:                                                                                                                    TRENCHES AND STRUCTURES.

                                                                                                                                                                                                                                                              2.     ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).                                                                          1.    THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE                       9.    THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER DRAINAGE ASSETS
                                                                                                                                                                                                                                                                                                                                                                                                     REQUIRED TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.                                                      FOR APPROVAL BY THE ENGINEER AND / OR LOCAL AUTHORITY.
                                                                                                                                                                                                                                                              3.     THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                                                                                               2.    THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND                       10.   IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEMONSTRATE HE HAS CAUSED NO DAMAGE TO EXISTING
                                                                                                                                                                                                                                                              4.     ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR




                                                                                                                                                                                                STREET
                                                                                                                                                                                                                                                                                                                                                                                                     MAINTENANCE PERIOD.                                                                                                      STORMWATER INFRASTRUCTURE DURING THE CONSTRUCTION OF THESE WORKS.
                                                                                                                                                                                                                                                                     AND ANY DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.
                                                                                                                                                                        SITE OF                                                                                                                                                                                                                3.    EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.                              11.   ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE
                                                                                                                                                                        WORKS                                                                                                                                                                                                                                                                                                                                                 CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, UNLESS IT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND THE RESPONSIBILITY OF OTHER
                                                                                                                                                                                                                                                                                                                                                                                               MANAGEMENT PRINCIPLES:                                                                                                         PARTIES.
                                                                                                                                                                                                                                                              EXISTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                                               4.    THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE IN ACCORDANCE WITH THE 'BEST PRACTICE                     12.   UPON COMPLETION ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND OTHER
                                                                                                                                                                                                                                                              1.     THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL
                                                                                                                                                                                                                                                                                                                                                                                                     EROSION AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL ASSOCIATION                         BLOCKAGES.
                                                                                                                                                                          POMONA                                                     YUROL                           BEFORE YOU DIG ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.




                                                                                                                                                                                     PAVILION
                                                                                                                                                                       SHOWGROUNDS                                               NATURE REFUGE                                                                                                                                                       (IECA). THE BASIC PRINCIPLES ARE TO:
                                                                                                                                                                                                                                                              2.     THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR                                    ● MINIMISE THE AREA OF DISTURBANCE;
                                                                                                                                                                                                                                                                     THE ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED.                                                                           ● CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                            SUBSOIL DRAINAGE
                                                                                                                                                                                                                                                              3.     NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.                                               ● MINIMISE EROSION;                                                                                            13.   SUBSOIL DRAINS SHALL BE SUPPLIED AND CONSTRUCTED IN ACCORDANCE WITH MRTS03.
                                                                                                                                                                                                                                                                                                                                                                                                         ● MINIMISE SEDIMENTATION;
                                                                                                                                                                                                                                                              4.     THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING                                                                                                                                                  14.   SUBSOIL DRAINS ARE TO BE GRADED AT 1% MINIMUM (DESIRABLE) AND 0.5% (MINIMUM).
                                                                                                                                                               NORTH



                                                                                                                                                                                                                                                                                                                                                                                                         ● PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.
                                                                                                                                                                                                                                                                     WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        15.   SUBSOIL FLUSHING POINTS ARE TO BE PLACED AT A MAXIMUM DISTANCE OF 50m.
                                                                                                                                                                                                                                                              5.     NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE
                                                                                                                                                                                                                                                                                                                                                                                               CONSTRUCTION PRE-START MEETING:                                                                                          16.   THE MAXIMUM LENGTH OF ANY SUBSOIL DRAINAGE LINE SHALL BE 100m.
                                                                                                                                                                                                                                                                     APPROPRIATE AUTHORITIES.
                                                                                                                                                                              COOROORA                                                                                                                                                                                                         5.    THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH              17.   THE CONTRACTOR SHALL ENSURE THAT ANY EXISTING SUBSOIL DRAINS HAVE AN APPROPRIATE OUTLET.
                                                                                                                                                                                                                                                              6.     EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE
                                                                                                                                      POMONA                                  CREEK PARK                                                                                                                                                                                                             AS:
                                                                                                                                                              COA




                                                                                                                                                                                                                                                                     NECESSARY TO SUIT FINAL FINISHED SURFACE LEVELS.
                                                                                                                                    TOWN CENTRE                                                                                                                                                                                                                                                          ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                                                                                                                                ST




                                                                                                                                                                                                                                                                                                                                                                                                         ● REQUIRED WATER QUALITY OBJECTIVES;
                                                                                                                                                                                                                                                                                                                                                                                                         ● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;                                                            CONCRETE
                                                                                                                                                                                                                                                              CLEARING, GRUBBING AND DISPOSAL                                                                                                            ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;                                                             1.    CONCRETE WORKS SHALL BE IN ACCORDANCE WITH AS3600 CONCRETE STRUCTURES.
                                                                                                                                                                         RA
                                                                                                                                                                            IL                                                                                                                                                                                                                           ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
                                                                                                                                                                                                                                                              1.     CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND                                                                                                                                                         2.    CONCRETE SHALL BE BATCHED USING BLENDED CEMENT: 25% FLYASH & 75% PORTLAND CEMENT. ANY ALTERNATIVE
                                                                                                                                                                                            LINE                                                                                                                                                                                                         ● REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
                                                                                                                                                                                                                                                                     SEDIMENT CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION                                                                                                                                                           PROPORTIONS SHALL BE SUBMITTED FOR APPROVAL.
                                                                                                                                                                                                                          LOCALITY PLAN                              OF THESE CONTROL MEASURES.                                                                                                                                                                                                                         3.    CONCRETE TEMPERATURE AT PLACEMENT;
                                                                                                                                                                                                                                                              2.     CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                           SITE INSPECTION AND MONITORING:                                                                                                  ● NO CONCRETE SHALL BE PLACED IF THE TEMP OF THE CONCRETE IS LESS THAN 10°C OR EXCEEDS 35°C.
                                                                                                                                                                                                                                                              3.     ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED.                                                              6.    CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF                             ● CONCRETE SHALL BE PLACED AND COMPACTED WITHIN 1 HOUR OF CHARGING THE MIXER FOR CONCRETE
                                                                                                                                                                                                                                                                                                                                                                                                     CONTROL MEASURES (E.G. SITE FOREMAN).                                                                                         TEMPERATURES UP TO 32°C & WITHIN 45 MINUTES OF CHARGING THE MIXER FOR CONCRETE TEMPERATURES
                                                                                                                                                                                                                                                              4.     WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION.                                                                                                                                                                                      UP TO 35°C.
                                                                                                                                                                                                                                                                                                                                                                                               7.    ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
                                                                                                                                                                                                                                                              5.     CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.
                                                                                                                                            F                                                                                                                                                                                                                                                                                                                                                                           4.    ALL CONCRETE SHALL BE VIBRATED UNO.
                                                                                                                                                    PROJECT DRAWINGS SCHEDULE                                                                                 6.     A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING OPERATIONS.
                                                                                                                                                                                                                                                                                                                                                                                                        ● AT LEAST DAILY WHEN RAIN IS OCCURRING;
                                                                                                                                                                                                                                                                                                                                                                                                        ● AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);                                                      5.    PROVIDE 20mm FILLETS OR CHAMFERS FOR EXPOSED CONCRETE EDGES HAVING CONTAINED ANGLE OF LESS THAN
                                                                                                                           DRG NO                 REVISION                                               DRAWING TITLE                                        7.     CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE                                   ● WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;                                                                         120° UNO
                                                                                                                                                                                                                                                                     REMOVAL OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.                                   ● WITHIN 18 HOURS OF A RAINFALL EVENT.
                                                                                                                          21556-C001                   F               LOCALITY PLAN, PROJECT NOTES & DRAWINGS SCHEDULE                                                                                                                                                                                                                                                                                                 6.    SUPPORT REINFORCEMENT ON PLASTIC CHAIRS AND SPACERS TO GIVE CORRECT CONCRETE COVER.
                                                                                                                                                                                                                                                              8.     DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE                        8.    CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW                         WHERE PLASTIC CHAIRS ARE TO BE TEMPORARILY SUPPORTED BY SOIL:
                                                                                                                         21556-C002                    B               PLAN OF DEVELOPMENT                                                                           LOCAL AUTHORITY.                                                                                                                CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.                                                  ● FOR MESH REINFORCEMENT, PROVIDE 'PIE PLATE' SUPPORT UNDER EACH CHAIR OR POUR 50mm MINIMUM
                                                                                                                         21556-C100                    D               EARTHWORKS PLAN AND EROSION & SEDIMENT CONTROL                                         9.     CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN                                9.    CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.                                                BLINDING CONCRETE
                                                                                                                                                                                                                                                                     INTERIM STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES.                                 10.   WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE               7.    POUR JOINTS
                                                                                                                         21556-C200                    D               ROADWORKS AND DRAINAGE PLAN SHEET 1 OF 2                                                                                                                                                                                                                                                                                                                 ● SCABBLE THE FACE OF POUR JOINTS AND CLEAN OFF DUST AND CONTAMINANTS BEFORE NEW POUR
                                                                                                                                                                                                                                                                                                                                                                                                     MUST BE INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.
                                                                                                                          21556-C201                   C               ROADWORKS AND DRAINAGE PLAN SHEET 2 OF 2                                                                                                                                                                                                                                                                                                                 ● COAT FACE WITH BONDING AGENT
                                                                                                                                                                                                                                                                                                                                                                                               11.   THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY
                                                                                                                                                                                                                                                                                                                                                                                                     CORRECTIVE ACTIONS TAKEN.                                                                                          8.    CONCRETE SHALL BE CURED IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS AND WITH AS3600 CONCRETE
                                                                                                                         21556-C202                    B               ROAD LONGITUDINAL SECTION, TYPICAL SECTIONS AND DETAILS                                EARTHWORKS / EXCAVATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              STRUCTURES;
                                                                                                                                                                                                                                                              GENERAL:                                                                                                                                                                                                                                                        PERFORMANCE CRITERIA:
                                                                                                                         21556-C203                    B               ROAD CROSS SECTIONS SHEET 1 OF 2
                                                                                                                                                                                                                                                              1.     ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF EXCAVATION.                                                                                                                                                             ● CRACKS IN CONCRETE (90 DAYS AFTER PLACEMENT) SHOULD NOT EXCEED 0.3mm AT THE SURFACE.
                                                                                                                         21556-C204                    B               ROAD CROSS SECTIONS SHEET 2 OF 2                                                                                                                                                                                        ROAD PAVEMENT                                                                                                                         CONCRETE WITH CRACKS EXCEEDING LIMIT SHALL BE REPAIRED.
                                                                                                                                                                                                                                                              2.     ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     OBTAIN SUPERINTENDENT APPROVAL FOR REPAIR METHODS PREFERRED CURING METHOD.
                                                                                                                         21556-C300                    B               STORMWATER DRAINAGE DETENTION/BIORETENTION BASIN DETAILS                                      UNDERTAKEN IN ACCORDANCE WITH MRTS04, THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN                           GENERAL:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 ● WHILST PLACING, SPRAY CONCRETE WITH ALIPHATIC ALCOHOL AFTER FIRST SCREED & AGAIN DURING
                                                                                                                                                                                                                                                                     STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE                            1.    ASPHALT PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS30.
                                                                                                                          21556-C301                   C               STORMWATER DRAINAGE LONGITUDINAL SECTION                                                                                                                                                                                                                                                                                                               FINISHING WORKS:
                                                                                                                                                                                                                                                                     ENGINEER.
                                                                                                                                                                                                                                                                                                                                                                                               2.    WHERE APPLICABLE, THE ASPHALT OVERLAY IS TO BE TIED-IN NEATLY TO THE KERB AND CHANNEL FOLLOWING EDGE                        ● COMMENCE CURING TOP SURFACE OF SLABS ONCE FINISHING OPERATIONS COMPLETE.
                                                                                                                         21556-C400                    F               SEWERAGE RETICULATION LAYOUT PLAN                                                      3.     STOCKPILES SHALL BE COVERED WITH TARPS.                                                                                         PLANING.                                                                                                                        COMMENCE CURING ALL OTHER SURFACES WITHIN 1 HR OF STRIPPING FORMWORK.
                                                                                                                                                                                                                                                              4.     EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.                                                                                                                                                               ● CURE FOR 7 DAYS MINIMUM.
                                                                                                                          21556-C401                   E               SEWERAGE RETICULATION LONGITUDINAL SECTIONS                                                                                                                                                                             3.    UNBOUND PAVEMENTS SHALL BE SUPPLIED AND PLACED IN ACCORDANCE WITH MRTS05.
                                                                                                                                                                                                                                                              5.     ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF                          4.    BASE COURSE AND SUB BASE TO BE STEPPED, AT JOINT BETWEEN EXISTING AND PROPOSED PAVEMENT, IN
                                                                                                                         21556-C500                    D               WATER SUPPLY PLAN                                                                             EARTHWORKS.                                                                                                                     ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-170.
                                                                                                                         21556-SWCLC                   A               STORMWATER DRAINAGE CATCHMENT PLAN & CALCULATIONS                                      6.     EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.                                                                                                                                                                  REINFORCEMENT
                                                                                                                                                                                                                                                                                                                                                                                               5.    ALL PAVING OPERATIONS INCLUDING MATERIAL SUPPLY, CONSTRUCTION PROCEDURES AND TESTING
                                                                                                                                                                                                                                                                                                                                                                                                     REQUIREMENTS SHALL BE IN ACCORDANCE WITH TMR STANDARDS AND SPECIFICATIONS.                                         1.    REINFORCEMENT SHALL CONFORM WITH TMR MRTS71 'REINFORCEMENT STEEL' .
                                                                                                                                NOOSA SHIRE COUNCIL'S CURRENT STANDARD DRAWINGS & ADDENDUMS ARE AVAILABLE ONLINE AT                                           TOPSOIL:
                                                                                                                                      www.noosa.qld.gov.au/planning-development/development-tools-guidelines/standard-drawings                                                                                                                                                                                                                                                                                          2.    ALL REINFORCEMENT SHALL BE ACRS (AUSTRALIAN CERTIFICATION AUTHORITY FOR REINFORCING STEEL) CERTIFIED.
                                                                                                                                                                                                                                                              7.     PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY                       EXISTING PAVEMENT:                                                                                                       3.    REINFORCEMENT SHALL BE 'N' GRADE D500N HOT ROLLED HIGH YIELD BARS TO AS 4671. U.N.O.
                                                                                                                                                                                                                                                                     ROOT AFFECTED AREAS MUST BE REMOVED.                                                                                                                                                                                                                     WHERE 'R' BARS ARE SPECIFIED, THESE SHALL BE ROUND BARS GRADE R250N.
                                                                                                                                                                                                                                                                                                                                                                                               6.    WHERE PAVEMENT WIDENING IS PROPOSED, THE EXISTING PAVEMENT IS TO BE SAW CUT TO FORM THE JOINT, AS
                                                                                                                                                                                                                                                              8.     ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR                              PER STANDARD DRAWING IPWEAQ RS-170. THE DEPTH OF THE EXISTING PAVEMENT IS TO BE CONFIRMED AS PART OF               4.    BAR SHAPES SHALL BE PER TMR STANDARD DRAWING 1043, U.N.O. HOOKS AND COGS SHALL BE DETAILED PER TMR
                                                                                                                                                                                                                                                                     DISPOSED OF. TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.                                                                  THIS PROCEDURE.                                                                                                          STANDARD DRAWING 1044.
                                                                                                                                                                                                                                                                                                                                                                                               7.    ALL EXISTING PAVEMENT SURFACES ARE TO BE SWEPT CLEAN OF ALL LOOSE DEBRIS/FOREIGN MATTER PRIOR TO                   5.    DO NOT CUT REINFORCEMENT TO CLEAR PENETRATIONS, SLEEVES OR H.D BOLTS. DISPLACE REINFORCEMENT
                                                                                                                                                                                                                                                              SUBSOILS:                                                                                                                              APPLICATION OF SEAL.                                                                                                     SLIGHTLY AS NECESSARY AND PROVIDE CORRECT COVER TO THE PENETRATIONS, SLEEVES OR H.D BOLTS.
                                                                                                                                                                                                                                                              9.     ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE                        8.    AREAS OF EXISTING PAVEMENT CONTAINING POTHOLES, TO BE SAW CUT AND REPLACED WITH DEEP LIFT ASPHALT                  6.    REINFORCEMENT LAP SPLICE LENGTHS (mm) UNO ON DRAWINGS.
                                                                                                                   GENERAL NOTES
                                                                                                                                                                                                                                                                     THE RISK OF SOIL EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.                                                               WITH A MINIMUM THICKNESS OF 100mm.
                                                                                                                   1. DO NOT SCALE DRAWINGS.                                                                                                                                                                                                                                                                                                                                                                                                                                               D500N BAR DIAMETER (mm)
                                                                                                                                                                                                                                                                                                                                                                                               9.    IF UNDERLYING GRAVEL IS EXPOSED DURING MILLING OPERATIONS A PRIMER SEAL SHALL BE PLACED OVER THE                            BAR LOCATION                   12              16                20          24         28            32
                                                                                                                   2.     ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.
                                                                                                                                                                                                                                                              SUBGRADES:                                                                                                                             AFFECTED AREA.                                                                                                                                                                              LAP LENGTH (mm)
                                                                                                                   3.     THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE
                                                                                                                                                                                                                                                              10.    SUBGRADES IN PAVEMENT AREAS SHALL BE PROOF ROLLED USING A MINIMUM 10T FLAT DRUM ROLLER AND ANY                                                                                                                                                              ALL OTHER BARS                 450             600              850        1200        1400       1750
                                                                                                                          CLARIFICATION OF THE DISCREPANCY.
                                                                                                                                                                                                                                                                     SOFT SPOTS OR UNSUITABLE MATERIALS SHALL BE EXCAVATED AND REPLACED WITH SELECT FILL.                                                                                                                                                                        WELDED MESH                                                        225mm LAP
                                                                                                                   4.     THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE
                                                                                                                                                                                                                                                              11.    SUBGRADE TESTS SHALL BE UNDERTAKEN AND RESULTS SUPPLIED TO THE ENGINEER, TO DETERMINE THE                                 TRAFFIC MANAGEMENT
                                                                                                                          SUPERINTENDENT FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS.
                                                                                                                                                                                                                                                                     ADEQUACY OF THE PAVEMENT DEPTH DETAILED ON THE DRAWINGS.
                                                                                                                   5.     ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT                                                                                                                                                                    1.    NO WORK IS TO BE UNDERTAKEN UNDER OR ADJACENT TO LIVE TRAFFIC WITHOUT A PRE-APPROVED TRAFFIC
                                                                                                                                                                                                                                                              12.    THE SUBGRADE IS TO BE INSPECTED BY THE SUPERINTENDENT BY MEANS OF A PROOF ROLL, BY A LOADED WATER                               CONTROL PLAN.
                                                                                                                          AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY
                                                                                                                                                                                                                                                                     CART, PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. THE SUBGRADE SHALL EXHIBIT NO VISIBLE SIGNS OF
                                                                                                                          AND THE SUPERINTENDENT.                                                                                                                                                                                                                                              2.    THE CONTRACTOR IS TO ENSURE THAT ALL NECESSARY PERMITS ARE GRANTED AND MEASURES ARE ONLY IN PLACE
                                                                                                                                                                                                                                                                     DEFORMATION UNDER PROOF-ROLLING.
                                                                                                                   6.     NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN                                                                                                                                                                       WITHIN THE APPROVED HOURS STIPULATED.
                                                                                                                                                                                                                                                              13.    THE SUPERINTENDENT MAY REQUEST ADDITIONAL SUBGRADE TESTING OR SUBGRADE REPLACEMENT FOLLOWING
                                                                                                                          OFFICIAL PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE                                                                                                                                                                     3.    THE CONTRACTOR SHALL ENSURE THAT ALL MEASURES ARE INSTALLED IN ACCORDANCE WITH THIS APPROVED
                                                                                                                                                                                                                                                                     THIS INSPECTION.
                                                                                                                          CONTRACTOR IS TO OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE                                                                                                                                                                           TRAFFIC CONTROL PLAN INCLUDING TEMPORARY SIGNS, BARRIERS, LIGHTS ETC.
                                                                                                                          REQUIREMENTS THEREOF.
                                                                                                                                                                                                                                                                                                                                                                                               4.    THE CONTRACTOR SHALL NOMINATE A REPRESENTATIVE TO IMPLEMENT, MONITOR AND ADDRESS ALL TRAFFIC
                                                                                                                   7.     ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.                                           STOCKPILE MANAGEMENT:                                                                                                                  MANAGEMENT ISSUES.
                                                                                                                   8.     A MINIMUM OF 24 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS.                                                           14.    CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A
                                                                                                                                                                                                                                                                                                                                                                                               5.    ALL TRAFFIC CONTROL MEASURES SHOULD CAUSE THE MINIMUM DISRUPTION POSSIBLE TO ALL OTHER USERS,
                                                                                                                                                                                                                                                                     GUTTER, DRAIN OR WATER BODY, SUCH AS:                                                                                           INCLUDING MOTORISTS AND PEDESTRIANS.
                                                                                                                   9.     THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF
                                                                                                                                                                                                                                                                       ● ON A ROAD PAVEMENT;
                                                                                                                          THE NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.
                                                                                                                                                                                                                                                                       ● WITHIN AN OVERLAND FLOW PATH;
                                                                                                                   10.    WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE                                                ● ADJACENT TO STREAM BANKS.
                                                                                                                          AND SITE SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.                                                                                                                                                                                                STORMWATER DRAINAGE
                                                                                                                                                                                                                                                              15.    CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP OR OTHER IMPERVIOUS COVER. LONG TERM
\\tod-fs02\dropbox\2021\21556SD2_25 Pavilion St, Pomona - Subdivision\4.CADD\#ACAD\2.OPW\#21556_CI_OPW.dwg




                                                                                                                   11.    THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;                                                                                     STOCKPILES CAN BE COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).                                                     1.    EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH
                                                                                                                            ● CONSTRUCTION PRE-START MEETING                                                                                                                                                                                                                                         STANDARD DRAWING IPWEAQ DS-0030 (TYPE 2).
                                                                                                                                                                                                                                                              16.    ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT
                                                                                                                            ● SET OUT
                                                                                                                                                                                                                                                                     CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.                                                                   2.    ALL MANHOLES TO BE 1050mm DIAMETER IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ DS-010.
                                                                                                                            ● DEMOLITION
                                                                                                                            ● SUBGRADE PROOF-ROLLS                                                                                                                                                                                                                                             3.    ALL MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS D IN ACCORDANCE WITH
                                                                                                                            ● PRE-SEAL PROOF-ROLLS                                                                                                            SITE REHABILITATION:                                                                                                                   STANDARD DRAWING IPWEAQ DS-019.
                                                                                                                            ● CONCRETE PRE-POURS                                                                                                              17.    ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE                          4.    ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS B IN ACCORDANCE
                                                                                                                            ● FINAL INSPECTION                                                                                                                       COMPACTION, AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.                                                               WITH STANDARD DRAWING IPWEAQ DS-020.
                                                                                                                   12.    THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,                                               18.    SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100mm AND HEAVILY COMPACTED SUBSOILS TO A                           5.    THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES AND
                                                                                                                          ENVIRONMENTAL MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF                                             MINIMUM DEPTH OF 300mm.                                                                                                         STRUCTURES.
                                                                                                                          PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                                              19.    TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.                                                                   6.    ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES AND / OR PITS.
                                                                                                                   13.    FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE
                                                                                                                                                                                                                                                              20.    ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.                                        7.    THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION IS IN
                                                                                                                          SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.
                                                                                                                                                                                                                                                                                                                                                                                                     ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY LEGISLATION.



                                                                                                             COPYRIGHT ©                                                                                                          Associated Consultants                Client                                                                                                            Drawn                      Verified                  Project                                                                   Drawing Title                                                                               Scale                  Sheet Size
                                                                                                                                                                                                                                                                                                                                                                                          JF                         DR
                                                                                                             This drawing is subject to
                                                                                                             copyright in accordance with          F       17.10.22    MINOR CHANGE APP : DRG SCHEDULE REVS               JF
                                                                                                                                                                                                                                  SURVEYORS & PLANNERS                  JNE DEVELOPMENTS P/L                                                                                                                                                   25 PAVILION ST, POMONA                                                    LOCALITY PLAN, PROJECT NOTES &                                                                                       A1
                                                                                                             the agreement between TOD                                                                                            LAND SURVEYING DYNAMICS (LSD)                                                                                                                           Designed                   Verified
                                                                                                             Consulting Pty Ltd (tc) and tc's      E       16.06.22    UW : PROJECT DRGS SCHEDULE REVISIONS               JF
                                                                                                                                                                                                                                  p 0412 666 516                                                                                                                                          JF                         DR                        RESIDENTIAL SUBDIVISION                                                   DRAWINGS SCHEDULE                                                                           Drawing Number
                                                                                                             client. This drawing shall only       D       25.05.22    IR : PROJECT DRGS SCHEDULE REVISIONS               JF
                                                                                                             be used for this specific project.
                                                                                                                                                   C       03.05.22    PROJECT DRG SCHEDULE REVS UPDATED                  JF
                                                                                                                                                                                                                                  e [email protected]                                                                                                                        Approved                   RPEQ No                   RP DESCRIPTION      21SP316902                                                                                                                                                  21556-C001
                                                                                                             This drawing shall not be used                                                                                       w www.landsurveyingdynamics.com                                                                Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   D. REYNOLDS                9072                      LOCAL AUTHORITY     NOOSA SHIRE COUNCIL
                                                                                                                                                   B       22.04.22    PROJECT DRG SCHEDULE REVS UPDATED                  JF                                                                                                                                                                                                                   MCU APPROVAL        -                   HORIZ DATUM MGA 2020                                  0      10     20         30   40         50    60                       Sheet                   Revision
                                                                                                             for construction until marked as                                                                                                                                                                                               PO Box 61, Noosaville, QLD 4566               Signed
                                                                                                                                                   A       11.04.22    OPW SUBMISSION                                      JF                                                                                                    [email protected]     www.todconsulting.com                                                         ROL APPROVAL        RAL21/0017          VERT DATUM AHD
                                                                                                             'Issued For Construction' in the
                                                                                                             revision description.                Rev       Date       Revision Description                              Drawn                                                                                                                   ABN 39 128 805 336                                                                 17.10.22   OPW APPROVAL        -                   RL DATUM    (PSM112428) 98.616                             MEASUREMENT BAR - INCREMENTS IN mm                                         1 of 14           F
Log in to download the original file

Plans for Approval.pdf · 4.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.