Appendix I - Amendments to Proposed Plans and Conditions · MCU25/0053.01

of 4

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Appendix I – Proposed Amendments to
Approved Drawings and Documents




Other Change Application - 7 Noosa Parade   51
Full text of the other 3 pages

Page 2

Proposed Amendments to the Approve Drawings and
Documents
The below table outlines the amendments required to the list of approved drawings and documents to reflect
the proposed changes and ensure any approval issued acknowledges the correct plans. Proposed insertions
are detailed in blue and underlined, with proposed deletions detailed in red and struck through.


Material Change of Use
Drawing or Document                                               Reference Number           Plan Date

Site Plan – Existing, Grid Setout and Proposed (prepared by       24048 AR 10.01 Rev 4       22/09/2025
Bureau Proberts)

Site Plan – Existing, Grid Setout and Proposed (prepared by
                                                                  TP-1001 Rev A              28/05/26
Carr Architecture)

Area Plans                                                        TP-1002 Rev A              28/05/26

G.A. Basement Plan (prepared by Bureau Proberts)                  24048 AR 21.01 Rev 10      22/09/2025

G.A. Basement Plan (prepared by Carr Architecture)                TP-1003 Rev A              28/05/26

G.A. Ground Floor Plan (prepared by Bureau Proberts)              24048 AR 21.02 Rev 9       22/09/2025

G.A. Ground Floor Plan (prepared by Carr Architecture)            TP-1004 Rev A              28/05/26




G.A. First Floor Plan (prepared by Bureau Proberts)               24048 AR 21.03 Rev 8       22/09/2025

G.A. First Floor Plan (prepared by Carr Architecture)             TP-1005 Rev A              28/05/26

G.A. Roof Plan (prepared by Bureau Proberts)                      24048 AR 21.04 Rev 7       22/09/2025

G.A. Roof Plan (prepared by Carr Architecture)                    TP-1006 Rev A              28/05/26

North and South Elevations (prepared by Bureau Proberts)          24048 AR 30.01 Rev 7       22/09/2025

North and South Elevations (prepared by Carr Architecture)        TP-1007 Rev A              28/05/26

East and West Elevations (prepared by Bureau Proberts)            24048 AR 30.03 Rev 7       22/09/2025

East and West Elevations (prepared by Carr Architecture)          TP-1008 Rev A              28/05/26

Sections 1 and 2 (prepared by Bureau Proberts)                    24048 AR 40.01 Rev 9       22/09/2025




                                                                                                             1

Page 3

Sections 1 and 2 (prepared by Carr Architecture)   TP-1009 Rev A          28/05/26

Sections 3 and 4 (prepared by Bureau Proberts)     24048 AR 40.02 Rev 7   22/09/2025

Sections 3 and 4 (prepared by Carr Architecture)   TP-1010 Rev A          28/05/26

Sections 5 and 6 (prepared by Bureau Proberts)     24048 AR 40.03 Rev 7   22/09/2025

Sections 5 and 6 (prepared by Carr Architecture)   TP-1011 Rev A          28/05/26




Operational Works
Drawing or Document                                Reference Number       Plan Date

Silt Sediment and Erosion Plan                     0423-OW2.1             -

Bulk Earthworks Plan prepared by SCG               0423 – OW3.1 Rev B     01/05/2025

Bulk Earthworks Plan prepared by SCG               0423-OW3.1 Rev C       March 2026

Earthworks Sections prepared by SCG Consulting     0423 – OW3.2 Rev B     01/05/2025

Earthworks Sections prepared by SCG Consulting     0423-OW3.2 Rev C       March 2026

Earthworks Sections prepared by SCG Consulting     0423-OW3.3 Rev B       March 2026

Driveway and Access Plan                           0423-OW4.1 Rev C       March 2026

Driveway Details                                   0423-OW4.2 Rev B       March 2026

Vehicle Turning Plans                              0423-OW5.1 Rev B       March 2026

Bulk Earthworks Plan                               0423-OW3.1 Rev B       March 2026

Earthworks Sections prepared by SCG Consulting     0423-OW3.2 Rev C       March 2026

Earthworks Sections prepared by SCG Consulting     0423 – OW3.3 Rev A     01/05/2025

Earthworks Sections prepared by SCG Consulting     0423-OW3.3 Rev B       March 2026

Basement Level Stormwater Management Plan          0423-SW1.1 Rev C       March 2026

Ground Level Stormwater Management Plan            0423-SW1.2 Rev C       March 2026


                                                                                       2

Page 4

Proposed Amendments to the Approval Conditions
The proposed changes do not necessitate amendments to the conditions outlined in the below table.

In addition to the requested Council impose standard conditions with respect to the Operational Works
component.




                                                                                                        3

Used in these records

About this file

File size
82 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix I - Amendments to Proposed Plans and Conditions.pdf · 82 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.