Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

MCU14/0056 Stormwater Quantity Management Plan Att D Information response

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                   125 MYALL STEET,
                        COOROY


                   SITE-BASED
                  STORMWATER
                    QUANTITY
                MANAGEMENT PLAN


                        14 January 2015




                                         ACN 105 078 377
                          5/541 Old Cleveland Rd, CAMP HILL QLD 4152
                              Ph (07) 3398 4992    Fax (07) 3398 4993
                                        www.stormw.com.au




                  Pty
Water Consulting Ltd
Log in to download the original file

MCU14_0056 Stormwater Quantity Management Plan Att D Information response.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 52 pages

Page 2

Job No: J4279

Job Name: 125 Myall Street, Cooroy

                          Report Name                                 Date         Report No.
 Site-Based Stormwater Quantity Management Plan                  14 January 2015    4279-1.0


Project Engineer:     Cody Grohn
                      BE Civil
                      E [email protected]

Project Manager:      Steve Hughes
                      BE Civil, MIEAust
                      E    [email protected]

Reviewed By:          Darren Rogers
                      BE Civil (Hons), MIE Aust, RPEQ
                      Director
                      E [email protected]
                      M 0410 314 115

Downloadable Files: Report File                    J4279 Report 1.0.pdf
                    HECRAS File                    J4279 HECRAS 1.0.zip
                    URBS File                      J4279 URBS 1.0.zip

Download Location: www.stormw.com.au/jobs/4279/1.0
                   Username:       4279
                   Password:       myal9841




                                          J4279 Report 1.0.doc
                                            14 January 2015                             Page ii

Page 3

                                                           Table of Contents

1.0 Introduction ...............................................................................................................................2
2.0 Response to Information Requests ............................................................................................3
  2.1 Department of Main Roads Information Request..................................................................3
  2.1 Noosa Shire Council’s Information Request .........................................................................6
3.0 Site conditions ...........................................................................................................................7
  3.1 Existing Site...........................................................................................................................7
  3.2 Developed Site .......................................................................................................................7
4.0 URBS Modelling .......................................................................................................................8
  4.1 Existing Model ......................................................................................................................8
  4.2 Developed Model ..................................................................................................................9
5.0 Hydraulic Calculations ............................................................................................................10
  5.1 Existing Scenario Model Setup ...........................................................................................10
  5.2 Developed Scenario Model Setup .......................................................................................11
6.0 Conclusions .............................................................................................................................14
List of Appendicies ............................................................................................................................14




                                                         J4279 Report 1.0.doc
                                                           14 January 2015                                                             Page iii

Page 4

1.0    INTRODUCTION
      Storm Water Consulting Pty Ltd was commissioned by Verve Building Design and
      Concepts to prepare a Site-Based Stormwater Quantity Management Plan for the proposed
      development located at 125 Myall Street, Cooroy.

      This report has been prepared to address the stormwater and flooding issues raised in the
      Main Roads and Noosa Shire Council’s Information Request Letters. A direct response to
      each item in these information request letters is presented in Section 2.0.




                                     J4279 Report 1.0.doc
                                       14 January 2015                                     Page 2

Page 5

2.0      RESPONSE TO INFORMATION REQUESTS
 2.1     Department of Main Roads Information Request
       A response to each item from the Department of Main Road’s Information Request dated 13
       August 2014 is presented below.

       RFI Item
       The stormwater management plan must be certified by a Registered Professional Engineer
       of Queensland.

       SWC Response
       This stormwater management plan has been certified by a Registered Professional Engineer
       of Queensland – Darren Rogers (RPEQ 5016).


       RFI Item
       The stormwater management plan must be prepared in accordance with the Department of
       Transport and Main Roads ‘Drainage Manual and with consideration given to the
       Queensland urban Drainage manual 2013 and the Environmental Protection Act 1994 and
       Environmental Protection (Water)Policy 2009.

       SWC Response
       This stormwater management plan has been prepared in accordance with the stated manuals.


       RFI Item
       Demonstrate that the management of stormwater (quantity and quality) post development
       can achieve a no worsening impact (on the predevelopment condition) in accordance with
       the design criteria in the Department of Transport and Main Roads’ Road Drainage
       Manual. Stormwater management for the proposed development must ensure no worsening
       or actionable nuisance to the state controlled road network caused by peak discharges,
       flood levels, frequency/duration of flooding, flow velocities, water quality, sedimentation,
       and scour effects.

       SWC Response
       This stormwater management plan demonstrates that the development will not result in
       adverse impact on properties and roads that are upstream, downstream and adjacent to the
       subject site. The development does not worsen or cause an actionable nuisance to the state
       controlled road networks.

       RFI Item
       Incorporate appropriate hydraulic and hydrological analysis demonstrating:
        • design flood peak discharges for the site and surrounding area which exist prior to the
           development for all flood and stormwater events up to a 1% Annual Exeedance
           Probability (AEP) (equivalent to 1/100 year Average Recurrence Interval (ARI)). This
           should include at least the following flood and stormwater events: 50%, 20%, 10%, 5%,
           2% and 1% AEP (equivalent to 2, 5, 10, 20, 50 and 100 year ARI events); and


                                       J4279 Report 1.0.doc
                                         14 January 2015                                     Page 3

Page 6

•   design flood peak discharges for the site and surrounding area after the development
    has occurred for all flood and stormwater events up to a 1% Annual Exeedance
    Probability (AEP) (equivalent to 1/100 year Average Recurrence Interval (ARI)). This
    should include at least the following flood and stormwater events: 50, 20, 10%, 5%, 2%
    and 1% AEP (equivalent to 2, 5, 10, 20, 50 and 100 year ARI events).

SWC Response
Design flood peak discharges for the 50%, 20%, 10%, 5%, 2% and 1% AEP storm events
have been calculated for the existing and developed site. Detailed URBS calculations and
results have been provided in this report.


RFI Item
All relevant legal points of discharge for the development site are identified. No new
discharge points for stormwater will be permitted on state controlled roads;

SWC Response
The legal point of discharge is to the existing waterway which extends through the site. No
new discharge points are required.


RFI Item
The impact of existing or proposed noise barriers on overland flow paths is taken into
account

SWC Response
Noise Barriers will not be located through the 100y ARI flood extent.


RFI Item
Overland flow paths are identified and hydraulic conveyance is maintained on the site as
part of the proposed development

SWC Response
The hydraulic conveyance of the waterway is maintained. Hydraulic modelling in Section
5.0 of this report shows no impact due to the development.


RFI Item
Flood storage capacity is maintained on the site as part of the proposed development

SWC Response
Flood Storage is reduced by approximately 140m3 due to the development. This equates to
1.5% of the total volume of flood storage on the site. This does not result in an increase in
flood levels or peak discharges and is therefore considered to be negligible.




                                J4279 Report 1.0.doc
                                  14 January 2015                                        Page 4

Page 7

RFI Item
The adverse impacts from sheet flow on the state controlled road network are prevented

SWC Response
The development does not result in adverse impacts from sheet flow on the state controlled
road network. All runoff will be directed into the waterway on the eastern side of the site.


RFI Item
Existing stormwater drainage infrastructure on state controlled roads is not interfered with
or damaged such as through concentrated flows, surcharging, scour, or deposition; and the
quality of stormwater discharging onto the state controlled road is not reduced through
erosion and sedimentation.

SWC Response
The development marginally increases the velocity at a single cross-section in the hydraulic
model. The velocity at XS20 is increase by .03m/s. This increase is considered to have a
negligible impact on any potential erosion and scouring and no impact on state controlled
roads is expected.




                                J4279 Report 1.0.doc
                                  14 January 2015                                      Page 5

Page 8

2.1     Noosa Shire Council’s Information Request
      A response to each item from Noosa Shire Council’s Information Request dated 19 August
      2014 is presented below.

      RFI Item
      The assessment and report must include plan/s and data showing the extent of flooding
      (floodline) for 1% AEP storm event on the development site and the relevant downstream
      properties and roads (eg the Golf Course and Myall Street) for pre-development conditions.

      SWC Response
      Detailed results of the hydraulic modelling are provided in Appendix D of this report. Figure
      7 and 8 in Appendix A illustrate the 1% AEP flood extent for the existing and developed site
      and downstream of the site.


      RFI Item
      The general internal drainage layout and any proposed or anticipated required stormwater
      drainage works and mitigation works external or internal to the site.

      SWC Response
      This report does not address the internal drainage layout. Section 4.0 of this report identifies
      that a detention basin is not required on site. The nominal storage in the bio retention basins
      will attenuate the frequent low flows. Therefore it is considered that a detention basin is not
      required. The internal drainage design will be documented in the detailed design stage of the
      project.


      RFI Item
      Plan/s and data showing the extent of flooding for post development conditions on the fully
      developed site and the relevant downstream properties and roads for 1%, 5% and 10% AEP
      storm events.

      SWC Response
      Detailed results from the hydraulic modelling are provided in Appendix D of this report.
      Figures 7 and 8 in Appendix A illustrate the 1% AEP flood extent for the existing and
      developed site and downstream of the site.


      RFI Item
      Identification of potential adverse impact on other properties and recommended mitigation
      measures.

      SWC Response
      It has been demonstrated in Section 5.0 of this report that the development would not cause
      an adverse impact; therefore no mitigation measures are proposed.




                                       J4279 Report 1.0.doc
                                         14 January 2015                                       Page 6

Page 9

3.0      SITE CONDITIONS
      3.1 Existing Site

       The site is undeveloped as shown in Photograph 1, Appendix B. The site consists of dense
       grass on the western half of the site and a heavily vegetated waterway on the eastern half of
       the site. A 228ha catchment contributes to flows through the site. A catchment plan is
       presented in Figure 1, Appendix A. Two natural channels flow in a northerly direction and
       enter culverts/pipes under the Bruce Highway south of the site. These pipes/culverts daylight
       upstream of the subject site. The two natural channels continue through the subject site. The
       two channels merge into one before flowing through two 3.2x2.45m box culverts under
       Myall Street (see Photograph 3, Appendix B). Photograph 2 in Appendix B shows the
       waterway which runs through the site. A survey plan of the site is presented in Figure 4,
       Appendix A.

      3.2 Developed Site

       The proposed development involves the construction of a multi-use facility. A development
       plan for the site is presented in Figure 5, Appendix A. The proposed development includes a
       service station with a fast food drive thru outlet, a car wash facility, a self-storage unit
       facility and a caravan tourist park which includes 10 cabins and a pool. A portion of the site
       has been nominated for future development. The waterway and the highly vegetated area on
       the eastern side of the site are proposed to remain as per existing conditions.




                                       J4279 Report 1.0.doc
                                         14 January 2015                                      Page 7

Page 10

4.0     URBS MODELLING
      A hydrologic model was created using the URBS software to determine the peak flow at
      Point 1 (see Figure 1, Appendix A). The model represents the sub-areas that contribute to
      flows through the subject site. The sub-areas and layout for the existing URBS model are
      illustrated in Figure 2, Appendix A. The subject site contains a significant amount of storage
      which contains flows which back up from the downstream culverts (under Myall St). This
      storage has been included in the URBS model. The URBS model files are presented in
      Appendix C.

      4.1    Existing Model
      An URBS model of the existing site and catchment conditions was created. The URBS
      model parameters and results are presented in Tables 4.1 & 4.2 below.

      Table 4.1 – Existing URBS Model Parameters
                            Storage           Non-Linearity    Initial Rainfall     Continuing
            ARI
                           Coefficient           Index               Loss          Rainfall Loss
            years
                               α                   m                 mm              mm/hr
             1                 1.20               0.80                15                2.50
             2                 1.20               0.80                20                2.50
             5                 1.20               0.80                25                2.50
             10                1.20               0.80                30                2.50
             20                1.20               0.80                32                2.50
             50                1.20               0.80                15                2.50
            100                1.20               0.80                 0                2.50

      Table 4.2 – Existing Site URBS Model Results
              ARI               Existing URBS
              years                  m3/s
                  1                   8.55
                  2                   11.92
                  5                   17.08
                 10                   19.78
                 20                   24.75
                 50                   35.12
              100                     44.04


      The URBS model results show that a peak discharge of 44 m3/s flows through the waterway
      at the site during a Q100 event.

                                      J4279 Report 1.0.doc
                                        14 January 2015                                        Page 8

Page 11

4.2    Developed Model
The existing URBS model was modified to represent development of the site. Flow
directions, sub-catchment use and fraction imperviousness were updated using the
development plan which is presented in Figure 5, Appendix A. A comparison between the
existing and developed URBS model results is presented in Table 4.3 below.

Table 4.3 –URBS Model Results
       ARI                Existing URBS         Developed URBS           Difference
       years                   m3/s                   m3/s                  m3/s
         1                     8.55                    8.57                  0.02
         2                     11.92                  11.90                 -0.02
         5                     17.08                  17.10                  0.01
         10                    19.78                  19.81                  0.03
         20                    24.75                  24.68                 -0.08
         50                    35.12                  35.10                 -0.02
        100                    44.04                  43.98                 -0.06

The URBS model results show a minor increase in peak discharges during a Q1, Q5 and Q10
storm event; however reductions are seen during a Q20, Q50 and Q100 storm event. The URBS
results show a net marginal benefit. The nominal storage in the bio retention will attenuate
the frequent low flows. Therefore it is considered that a detention basin is not required.
Detailed URBS input data for the Developed Scenario is presented in Appendix C.




                               J4279 Report 1.0.doc
                                 14 January 2015                                      Page 9

Page 12

5.0      HYDRAULIC CALCULATIONS
 5.1     Existing Scenario Model Setup
       To assess the existing inundation levels through the site, a HECRAS hydraulic model was
       set up using ALS survey data obtained from the Department of Natural Resources and
       Mines (DNRM). This ALS data matched the survey data presented in Figure 4, Appendix A.
       The model consists of a single branch through the waterway on the eastern side of the site.
       The locations of the cross sections used in the HECRAS model for the existing and
       developed scenarios are presented in Figure 4, Appendix A. Two 3.2x2.45m box culverts
       which convey flows under Myall Street were included in the model. The flow through the
       waterway is sub-critical and is therefore governed by the downstream boundary condition. A
       ground slope of 1 in 5000 was used to represent the downstream boundary condition.

       The inflow for the model was determined using the URBS model. Section 4.0 demonstrates
       that a peak discharge of 44.04 m3/s flows through the waterway at the site during a Q100
       event. This peak discharge was input at XS 70 in the HECRAS model.

       As a conservative modelling approach, flow from the external catchment was only permitted
       to flow in the western channel of the waterway through the site.

       The following table presents the model parameters used in the existing HECRAS model:

       Table 5.1 – HECRAS Manning’s Roughness Coefficients
                    Land use                             Mannings’s n value
                   Dense grass                                   0.04
                      Roads                                      0.02
         Waterway and highly vegetated
                                                                 0.08
                    areas

       An inundation plan for the existing site conditions is presented in Figure 7, Appendix A.




                                       J4279 Report 1.0.doc
                                         14 January 2015                                    Page 10

Page 13

5.2    Developed Scenario Model Setup
      The existing model was modified to include the development. Buildings were input as a
      blocked obstruction. A retaining wall was assumed along the RP boundary on the eastern
      side of the development site. The future development area was assumed to be constructed at
      an elevation of 108.0m AHD.

      A comparison between the existing and developed HECRAS scenario results is presented in
      Tables 5.2, 5.3, 5.4, 5.5, 5.6 and 5.7 below.

      Table 5.2 – Q100 HECRAS Results Comparison
                                                  Proposed Developed
              Existing Inundation Level                                        Increase
       XS                                          Inundation Level
                       m AHD                                                      m
                                                       m AHD

       70               107.941                         107.937                 -0.004
       60               107.940                         107.935                 -0.005
       50               107.846                         107.841                 -0.005
       40               107.687                         107.681                 -0.006
       30               107.492                         107.483                 -0.009
       20               107.443                         107.439                 -0.004
        5               106.807                         106.806                 -0.001
        1               106.705                         106.704                 -0.001
       -5               106.413                         106.411                 -0.002
      -10               106.397                         106.395                 -0.002
      -15               106.383                         106.381                 -0.002

      Table 5.3 – Q50 HECRAS Results Comparison
                                                  Proposed Developed
              Existing Inundation Level                                        Increase
       XS                                          Inundation Level
                       m AHD                                                      m
                                                       m AHD

       70               107.654                         107.652                 -0.002
       60               107.657                         107.655                 -0.002
       50               107.561                         107.558                 -0.003
       40               107.396                         107.393                 -0.003
       30               107.123                         107.115                 -0.008
       20               107.043                         107.042                 -0.001
        5               106.606                         106.605                 -0.001
        1               106.496                         106.495                 -0.001
       -5               106.122                         106.121                 -0.001
      -10               106.102                         106.101                 -0.001

                                     J4279 Report 1.0.doc
                                       14 January 2015                                    Page 11

Page 14

 

Water Consulting i

 

 

 

 

 

 

 

 

 

 

 

 

-15 106.088 106.087 -0.001
Table 5.4 — Qx9 HECRAS Results Comparison
XS Existing Inundation Level Proposed Developed Increase
m AHD m AHD m
70 107.301 107.298 -0.003
60 107.323 107.320 -0.003
50 107.227 107.225 -0.002
40 107.076 107.073 -0.003
30 106.721 106.719 -0.002
20 106.592 106.588 -0.004
5 106.312 106.311 -0.001
1 106.199 106.198 -0.001
-5 105.744 105.741 -0.003
-10 105.716 105.713 -0.003
-15 105.7 105.697 -0.003
Table 5.5 — Qi9 HECRAS Results Comparison
XS Existing Inundation Level Proposed Developed Increase
m AHD m AHD m
70 107.122 107.123 0.001
60 107.142 107.143 0.001
50 107.047 107.049 0.002
40 106.908 106.909 0.001
30 106.541 106.543 0.002
20 106.371 106.373 0.002
5 106.17 106.171 0.001
1 106.061 106.062 0.001
-5 105.542 105.543 0.001
-10 105.506 105.507 0.001
-15 105.489 105.491 0.002

 

 

 

J4279 Report 1.0.doc
14 January 2015

Page 12

Page 15

Table 5.6 – Q5 HECRAS Results Comparison
                                            Proposed Developed
        Existing Inundation Level                                         Increase
 XS                                          Inundation Level
                 m AHD                                                       m
                                                 m AHD

 70                107.01                          107.011                 0.001
 60               107.025                          107.026                 0.001
 50               106.927                          106.928                 0.001
 40               106.791                          106.793                 0.002
 30               106.438                          106.441                 0.003
 20               106.249                          106.249                 0.000
  5               106.089                          106.089                 0.000
  1               105.985                          105.986                 0.001
 -5               105.422                          105.422                 0.000
-10               105.378                          105.379                 0.001
-15               105.361                          105.361                 0.000

Table 5.7 – Q2 HECRAS Results Comparison
                                            Proposed Developed
        Existing Inundation Level                                         Increase
 XS                                          Inundation Level
                 m AHD                                                       m
                                                 m AHD

 70               106.774                          106.772                 -0.002
 60               106.767                          106.766                 -0.001
 50               106.664                          106.663                 -0.001
 40               106.537                          106.537                  0.000
 30               106.157                          106.159                  0.002
 20               105.911                          105.910                 -0.001
  5               105.819                          105.818                 -0.001
  1               105.695                          105.694                 -0.001
 -5               105.010                          105.009                 -0.001
-10               104.928                          104.927                 -0.001
-15               104.906                          104.905                 -0.001

The results presented above show marginal increases in in flood levels (1-3mm) during a Q1,
Q5 and Q10 storm event however decreases are seen during a Q20, Q50 and Q100 storm event.
These increases are not considered to cause an actionable nuisance. The development would
not adversely impact neighbouring properties and roads. Detailed HECRAS results are
presented in Appendix D.

An inundation plan for the developed site is presented in Figure 8, Appendix A.


                               J4279 Report 1.0.doc
                                 14 January 2015                                     Page 13

Page 16

6.0     CONCLUSIONS
      This report has been prepared to address the stormwater and flooding issues raised in the
      Main Roads and Noosa Shire Council’s Information Request Letters. A direct response to
      each item in these information request letters is presented in Section 2.0.

      The existing site is undeveloped and contains a waterway which traverses along the eastern
      side of the site. The proposed development involves the construction of a multi-use facility.
      This development includes a service station with a fast food drive thru outlet, a car wash
      facility, a self-storage unit facility and a caravan tourist park which includes 10 cabins and a
      pool.

      An URBS hydrologic analysis was undertaken to determine effects of the development
      through the subject site. The URBS model results show a minor increase in peak flows
      downstream of the site during a Q1, Q5 and Q10 storm event; however reductions are seen
      during a Q20, Q50 and Q100 storm event. The URBS results show a net marginal benefit. The
      nominal storage in the bio retention will attenuate the frequent low flows. Therefore it is
      considered that a detention basin is not required.

      A 1D HECRAS hydraulic model was setup to determine the inundation extent through the
      site. Figures 7 and 8 in Appendix A illustrate the 1% AEP flood extent for the existing and
      developed site. The results indicate that the proposed development will not result in an
      adverse impact on neighbouring properties and roads.




      Darren Rogers
      BE Civil (Hons), MIE Aust, RPEQ
      Director




                                        J4279 Report 1.0.doc
                                          14 January 2015                                     Page 14

Page 17

LIST OF APPENDICIES

APPENDIX A – Figures

APPENDIX B – Photographs

APPENDIX C – URBS Data

APPENDIX D – HECRAS Data

Page 18

 

 

 

 

APPENDIX A

Figures

 

 

 

 

Page 19

Catchment
228 ha

Laake fe) We) AOR Oa Sear tt cereal

an ogtie
BAS Cos

Image 2014 DigitalGlobe

Sleopen 282: sete [125 Mall Street, Corey Figure
lone ate 08/01/15
atchment Plan

Fax (07) 3398 4993
Water Consutting en 112,500

 

Page 20

Laake fe) We) AOR Oa Sear tt cereal

Image © 2014 DigitalGlobe

SIGE SiS4 Olé Cleveland Rs te 125 Myall Street, Cooroy Figure 3

Water Consutting Fax” (07) 2986 999 Developed URBS Model Setup

 

Page 21

Laake fe) We) AOR Oa Sear tt cereal

Image © 2014 DigitalGlobe

SIGE SiS4 Olé Cleveland Rs te 125 Myall Street, Cooroy Figure 2

arcu fe” Css isitng URBS Model Setup

 

Page 22

 

   

2x box culverts
| 3.2mx2.45m

 

 

 

 

 

 

 

Drawn] 0G .
SIGE Campriil cL 4152" Checked | DR 125 Myall Street, Cooroy Figure 4
ng Fax” (or}sen ego Oe _frsrare | oy Survey Plan

 

 

 

 

 

 

 

Page 23

 

     

2x box culverts
3.2mx2.45m

 

Drawn | CG ;
BS ( aces [=== —] 125 Myall Street, Cooroy Figure 5
Phone (07) 3398 4992

Water Consulting = Fax._—(07) 3398 4993 = ane Job No. | J4279 Development Plan
le

 

 

 

 

 

 

 

 

 

 

+>
-

 

Page 24

Lt
er ee
a. ae ee |

es - an
“a oe

SIoRM SiS4 Olé Cleveland Rs te 125 Myall Street, Cooroy Figure 6

Phone (07) 3398 4992
Water Consulting Fax on 3398 4993, HECRAS model setup

 

Page 25

nace
“aaces
“atetececey

Oe
stator
0

“

i”
%
RS

<e

Modelled 1% AEP flood extent in western channel

ween Approximate flood extent of eastern channel

KS
&

SIGE SiS Ol Cleveland Rs ea tos | 125 Myall Street, Cooroy Figure 7

Water Conteulting Fax” (07) 3098 4903 HECRAS Existing inundation extent

 

Page 26

Modelled 1% AEP flood extent in western channel

ween Approximate flood extent of eastern channel

SIGE SiS Ol Cleveland Rs ea tos | 125 Myall Street, Cooroy Figure 8

Water Consulting Fax (07) 3598 4985 HECRAS Developed inundation extent

 

Page 27

 

 

 

 

APPENDIX B

Photographs

 

 

 

 

Page 28

             Photo 1- Looking south-east at the subject site




Photo 2- Looking south-east at the waterway which runs through the site




                        J4279 Report 1.0.doc
                          14 January 2015                                 Page 1

Page 29

Photo 3 – Looking at the 3.2m x 2.45m box culverts under Myall St




                    J4279 Report 1.0.doc
                      14 January 2015                               Page 2

Page 30

 

 

 

 

APPENDIX C

URBS Data

 

 

 

 

Page 31

 

Water Consulting i

 

4279 Ex.dat

"Index","Area","UR","UH","1"

#1,0.25889, 1.00,0.00,0.00

#2,0.15725,1.00,0.00,0.00

#3,0.14568,1.00,0.00,0.00

#4,0.09076, 1.00,0.00,0.00

#5,0.11709,1.00,0.00,0.00

#6,0.04526, 1.00,0.00,0.00

#7,0.07566, 1.00,0.00,0.00

#8,0.10202,1.00,0.00,0.00

#9,0.04220,1.00,0.00,0.00

#10,0.05642,1.00,0.00,0.00
#11,0.08109,1.00,0.00,0.00
#12,0.05189,1.00,0.00,0.00
#13,0.04929,1.00,0.00,0.00
#14,0.04631,1.00,0.00,0.00
#15,0.03866, 1.00,0.00,0.00
#16,0.05288,1.00,0.00,0.00
#17,0.09712,1.00,0.00,0.00
#18,0.10414,1.00,0.00,0.00
#19,0.09192,1.00,0.00,0.00
#20,0.07942,1.00,0.00,0.00
#21,0.10815,1.00,0.00,0.00
#22,0.23591,1.00,0.00,0.00
#23,0.04811,1.00,0.00,0.00
#24,0.01083,1.00,0.00,0.00
#25,0.01228,1.00,0.00,0.00
#26,0.00716,1.00,0.00,0.00
#27,0.01231,1.00,0.00,0.00
#28,0.01482,1.00,0.00,0.00
#29,0.01045,1.00,0.00,0.00
#30,0.00628,1.00,0.00,0.00
#3 1,0.03057,1.00,0.00,0.00

 

J4279 Report 1.0.doc
14 January 2015

Page 1

Page 32

4279_Ex.U

125 Myall St, Cooroy - Existing
MODEL: Basic
USES: L, U
Default Parameters: alpha=1.20 m=0.8
Catchment File=4279_Ex.dat

Rain #1      L=0.293
Route thru   #2    L=0.200
Add Rain     #2    L=0.170
Route thru   #4    L=0.112
Route thru   #7    L=0.136
Store.
Rain #3      L=0.211
Route thru   #4    L=0.115
Route thru   #7    L=0.190
Store.
Rain #4      L=0.147
Route thru   #7    L=0.128
Store.
Rain #6      L=0.131
Route thru   #7    L=0.151
Get.
Get.
Get.
Add Rain     #7     L=0.167
Store.
Rain #5      L=0.168
Route thru   #7    L=0.156
Get.
Route thru   #10    L=0.115
Store.
Rain #9      L=0.155
Route thru   #10 L=0.159
Get.
Add Rain     #10    L=0.112
Store.
Rain #8      L=0.159
Route thru   #10 L=0.146
Get.
Route thru   #12    L=0.115
Add Rain     #12    L=0.107
Route thru   #15    L=0.096
Store.
Rain #11     L=0.162
Route thru   #12 L=0.137
Route thru   #15 L=0.116
Store.
                                       J4279 Report 1.0.doc
                                         14 January 2015      Page 2

Page 33

Rain #13     L=0.118
Route thru   #15 L=0.124
Store.
Rain #14     L=0.149
Route thru   #15 L=0.119
Get.
Get.
Get.
Add Rain     #15   L=0.072
Route thru   #17   L=0.218
Store.
Rain #16     L=0.108
Route thru   #17 L=0.260
Get.
Add Rain     #17   L=0.145
Route thru   #18   L=0.192
Add Rain     #18   L=0.175
Route thru   #22   L=0.240
Store.
Rain #19     L=0.123
Route thru   #20 L=0.120
Add Rain     #20 L=0.117
Route thru   #21 L=0.177
Add Rain     #21 L=0.142
Route thru   #22 L=0.214
Get.
Add Rain     #22   L=0.190
Route thru   #31   L=0.124
Store.
Rain #23     L=0.108
Route thru   #31 L=0.066
Store.
Rain #28     L=0.064
Route thru   #29 L=0.051
Add Rain     #29 L=0.064
Route thru   #31 L=0.076
Store.
Rain #27     L=0.069
Route thru   #30 L=0.040
Add Rain     #30 L=0.049
Route thru   #31 L=0.054
Store.
Rain #24     L=0.050
Route thru   #25 L=0.053
Add Rain     #25 L=0.056
Route thru   #26 L=0.035
Add Rain     #26 L=0.032
Route thru   #31 L=0.091
Get.
                             J4279 Report 1.0.doc
                               14 January 2015      Page 3

Page 34

 

Water Consulting i

 

Get.

Print. Site

Get.

Get.

Add Rain #31
Print. B2-In

DAM ROUTE VBF=0 NUMBER=28

0.000000 0.000000
0.032155 1.500000
0.046870 3000000
0.055590 4.510000
0.064310 6.010000
0.190800 7.510000
0.328740 9.010000
0.466680 10.51000
0.567000 12.02000
0.667320 13.52000
1.094670 15.29000
1.679790 18.17000
2.191770 21.04000
2.718735 23.92000
3.510075 26.79000
4.301415 29.58000
5.026810 32.20000
5.818150 34.81000
6.879350 37.42000
8.046670 40.03000
9.107870 42.51000
10.27519 44.80000
11.59317 47.09000
13.15657 49.37000
13.93827 51.66000
14,.56363 53.94000
15.03265 56.29000
16.43971 64.93000
}

}

Print. B2-Out
Print. Point-1

end of catchment details.

 

J4279 Report 1.0.doc
14 January 2015

Page 4

Page 35

 

Water Consulting i

 

4279 Dev.dat

"Index","Area","UR","UH","1"

#1,0.25889, 1.00,0.00,0.00

#2,0.15725,1.00,0.00,0.00

#3,0.14568,1.00,0.00,0.00

#4,0.09076, 1.00,0.00,0.00

#5,0.11709,1.00,0.00,0.00

#6,0.04526, 1.00,0.00,0.00

#7,0.07566, 1.00,0.00,0.00

#8,0.10202,1.00,0.00,0.00

#9,0.04220,1.00,0.00,0.00

#10,0.05642,1.00,0.00,0.00
#11,0.08109,1.00,0.00,0.00
#12,0.05189,1.00,0.00,0.00
#13,0.04929,1.00,0.00,0.00
#14,0.04631,1.00,0.00,0.00
#15,0.03866, 1.00,0.00,0.00
#16,0.05288,1.00,0.00,0.00
#17,0.09712,1.00,0.00,0.00
#18,0.10414,1.00,0.00,0.00
#19,0.09192,1.00,0.00,0.00
#20,0.07942,1.00,0.00,0.00
#21,0.10815,1.00,0.00,0.00
#22,0.23591,1.00,0.00,0.00
#23,0.04811,1.00,0.00,0.00
#24,0.01083,0.00,1.00,0.10
#25,0.01228,0.00,1.00, 1.00
#26,0.00716,0.00,1.00,0.00
#27,0.01231,0.00,1.00,0.80
#28,0.01482,0.00,1.00,0.60
#29,0.01045,0.00,1.00,0.85
#30,0.00628,0.00,1.00, 1.00
#3 1,0.03057,1.00,0.00,0.00

 

J4279 Report 1.0.doc
14 January 2015

Page 5

Page 36

4279_Dev.U

125 Myall Street, Cooroy - Dev
MODEL: Basic
USES: L, U
Default Parameters: alpha=1.20 m=0.8
Catchment File=4279_Dev.dat

Rain #1      L=0.293
Route thru   #2    L=0.200
Add Rain     #2    L=0.170
Route thru   #4    L=0.112
Route thru   #7    L=0.136
Store.
Rain #3      L=0.211
Route thru   #4    L=0.115
Route thru   #7    L=0.190
Store.
Rain #4      L=0.147
Route thru   #7    L=0.128
Store.
Rain #6      L=0.131
Route thru   #7    L=0.151
Get.
Get.
Get.
Add Rain     #7     L=0.167
Store.
Rain #5      L=0.168
Route thru   #7    L=0.156
Get.
Route thru   #10    L=0.115
Store.
Rain #9      L=0.155
Route thru   #10 L=0.159
Get.
Add Rain     #10    L=0.112
Store.
Rain #8      L=0.159
Route thru   #10 L=0.146
Get.
Route thru   #12    L=0.115
Add Rain     #12    L=0.107
Route thru   #15    L=0.096
Store.
Rain #11     L=0.162
Route thru   #12 L=0.137
Route thru   #15 L=0.116
Store.
                                       J4279 Report 1.0.doc
                                         14 January 2015      Page 6

Page 37

Rain #13     L=0.118
Route thru   #15 L=0.124
Store.
Rain #14     L=0.149
Route thru   #15 L=0.119
Get.
Get.
Get.
Add Rain     #15   L=0.072
Route thru   #17   L=0.218
Store.
Rain #16     L=0.108
Route thru   #17 L=0.260
Get.
Add Rain     #17   L=0.145
Route thru   #18   L=0.192
Add Rain     #18   L=0.175
Route thru   #22   L=0.240
Store.
Rain #19     L=0.123
Route thru   #20 L=0.120
Add Rain     #20 L=0.117
Route thru   #21 L=0.177
Add Rain     #21 L=0.142
Route thru   #22 L=0.214
Get.
Add Rain     #22   L=0.190
Route thru   #31   L=0.124
Store.
Rain #23     L=0.108
Route thru   #31 L=0.066
Store.
Rain #24     L=0.050
Route thru   #25 L=0.053
Add Rain     #25 L=0.056
Store.
Rain #28     L=0.091
Route thru   #27 L=0.042
Store.
Rain #27     L=0.069
Get.
Route thru   #27   L=0.035
Route thru   #25   L=0.059
Get.
Route thru   #26   L=0.035
Store.
Rain #29     L=0.045
Route thru   #30 L=0.046
Add Rain     #30 L=0.030
                             J4279 Report 1.0.doc
                               14 January 2015      Page 7

Page 38

 

Water Consulting i

 

Route thru #26
Get.

Add Rain #26
Route thru #31
Print. Site

Get.

Get.

Add Rain #31
Print. B1-In

L=0.053

L=0.032
L=0.091

L=0.133

DAM ROUTE VBF=0 NUMBER=28

0.000000 0.000000
0.032155 1.500000
0.046870 3000000
0.055590 4.510000
0.064310 6.010000
0.190800 7.510000
0.328740 9.010000
0.466680 10.51000
0.567000 12.02000
0.667320 13.52000
1.094670 15.29000
1.679790 18.17000
2.191770 21.04000
2.716440 23.92000
3.498600 26.79000
4.280760 29.58000
4.997740 32.20000
5.779900 34.81000
6.613250 37.42000
7.529935 40.03000
8.387420 42.51000
9.569590 44.80000
10.89837 47.09000
12.46177 49.37000
13.24347 51.66000
13.86883 53.94000
14,33785 56.29000
15.74491 64.93000
}

}

Print. B1-Out
Print. Point-1

end of catchment details.

 

J4279 Report 1.0.doc
14 January 2015

Page 8

Page 39

 

 

 

 

APPENDIX D

HECRAS D

 

 

 

 

Page 40

HEC-RAS River: Myall St Reach: 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chni Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (mim) (mis) (m2) (m)
1 70 Q2 Ex 11.92 105.84 106.774 106.92 0.046525 1.68 7.10 13.86 0.75
1 70 Q2 Dev 11.90 105.84 106.772 106.92 0.046816 1.68 7.08 13.84 0.75
1 70 Q5 Ex 17.08 105.84 107.010 107.14 0.031117 1.60 10.68 16.50 0.63
1 70 Q5 Dev 17.10 105.84 107.011 107.14 0.031009 1.60 10.70 16.52 0.63
1 70 Q10 Ex 19.78 105.84 107.122 107.25 0.026880 1.57 12.60 17.94 0.60
1 70 Q10 Dev 19.81 105.84 107.123 107.25 0.026832 1.57 12.62 17.96 0.60
1 70 Q20 Ex 24.75 105.84 107.301 107.42 0.027017 1.53 16.20 24.29 0.60
1 70 Q20 Dev 24.68 105.84 107.298 107.42 0.026984 1.53 16.14 24.14 0.60
1 70 Q50 Ex 35.12 105.84 107.654 107.73 0.016331 1.23 28.49 40.84 0.47
1 70 Q50 Dev 35.10 105.84 107.652 107.73 0.016473 1.24 28.40 40.79 0.47
1 70 Q100 Ex 44.04 105.84 107.941 108.00 0.009044 1.07 41.07 46.55 0.36
1 70 Q100 Dev 43.98 105.84 107.937 108.00 0.009156 1.08 40.85 46.47 0.37
1 60 Q2 Ex 11.92 105.21 106.767 106.78 0.002739 0.47 25.37 40.68 0.19
1 60 Q2 Dev 11.90 105.21 106.766 106.78 0.002721 0.47 25.33 40.42 0.19
1 60 Q5 Ex 17.08 105.21 107.025 107.04 0.001925 0.46 37.00 46.75 0.17
1 60 Q5 Dev 17.10 105.21 107.026 107.04 0.001918 0.46 37.06 46.75 0.17
1 60 Q10 Ex 19.78 105.21 107.142 107.15 0.001646 0.47 42.51 47.19 0.16
1 60 Q10 Dev 19.81 105.21 107.143 107.15 0.001644 0.47 42.58 47.19 0.16
1 60 Q20 Ex 24.75 105.21 107.323 107.33 0.001426 0.48 51.10 47.86 0.15
1 60 Q20 Dev 24.68 105.21 107.320 107.33 0.001428 0.48 50.98 47.85 0.15
1 60 Q50 Ex 35.12 105.21 107.657 107.67 0.001194 0.52 67.37 49.38 0.14
1 60 Q50 Dev 35.10 105.21 107.655 107.67 0.001199 0.52 67.25 49.37 0.14
1 60 Q100 Ex 44.04 105.21 107.940 107.95 0.001033 0.54 81.48 50.68 0.14
1 60 Q100 Dev 43.98 105.21 107.935 107.95 0.001040 0.54 81.25 50.66 0.14
1 50. Q2 Ex 11.92 104.78 106.664 106.68 0.002431 0.62 19.12 18.32 0.19
1 50. Q2 Dev 11.90 104.78 106.663 106.68 0.002427 0.62 19.11 18.32 0.19
1 50. Q5 Ex 17.08 104.78 106.927 106.95 0.002651 0.70 24.24 20.62 0.21
1 50. Q5 Dev 17.10 104.78 106.928 106.95 0.002646 0.70 24.27 20.63 0.21
1 50. Q10 Ex 19.78 104.78 107.047 107.07 0.002725 0.74 26.79 21.70 0.21
1 50. Q10 Dev 19.81 104.78 107.049 107.08 0.002726 0.74 26.82 21.71 0.21
1 50. Q20 Ex 24.75 104.78 107.227 107.26 0.002926 0.80 30.84 23.24 0.22
1 50. Q20 Dev 24.68 104.78 107.225 107.26 0.002923 0.80 30.78 23.22 0.22
1 50. Q50 Ex 35.12 104.78 107.561 107.60 0.003086 0.90 39.01 25.74 0.23
1 50. Q50 Dev 35.10 104.78 107.558 107.60 0.003097 0.90 38.94 25.72 0.23

 

 

Page 41

HEC-RAS River: Myall St Reach: 1 (Continued)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chni Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (mim) (mis) (m2) (m)

1 50. Q100 Ex 44.04 104.78 107.846 107.89 0.002963 0.94 46.65 27.78 0.23

50. Q100 Dev 43.98 104.78 107.841 107.89 0.002980 0.95 46.51 27.75 0.23
1 40 Q2 Ex 11.92 104.92 106.537 106.56 0.003791 0.74 16.20 16.88 0.24
1 40 Q2 Dev 11.90 104.92 106.537 106.56 0.003784 0.74 16.19 16.88 0.24
1 40 Q5 Ex 17.08 104.92 106.791 106.83 0.003879 0.83 20.67 18.37 0.25
1 40 Q5 Dev 17.10 104.92 106.793 106.83 0.003867 0.83 20.70 18.38 0.25
1 40 Q10 Ex 19.78 104.92 106.908 106.95 0.003918 0.87 22.86 19.09 0.25
1 40 Q10 Dev 19.81 104.92 106.909 106.95 0.003918 0.87 22.89 19.10 0.25
1 40 Q20 Ex 24.75 104.92 107.076 107.12 0.004224 0.95 26.15 20.18 0.27
1 40 Q20 Dev 24.68 104.92 107.073 107.12 0.004219 0.95 26.11 20.17 0.27
1 40 Q50 Ex 35.12 104.92 107.396 107.45 0.004541 1.06 32.99 22.50 0.28
1 40 Q50 Dev 35.10 104.92 107.393 107.45 0.004566 1.07 32.90 22.47 0.28
1 40 Q100 Ex 44.04 104.92 107.687 107.75 0.004359 1.10 39.88 24.98 0.28
1 40 Q100 Dev 43.98 104.92 107.681 107.74 0.004389 1.11 39.73 24.93 0.28
1 30. Q2 Ex 11.92 104.64 106.157 106.19 0.006616 0.81 14.73 20.46 0.30
1 30. Q2 Dev 11.90 104.64 106.159 106.19 0.006560 0.81 14.76 20.49 0.30
1 30. Q5 Ex 17.08 104.64 106.438 106.47 0.005685 0.80 21.26 26.70 0.29
1 30. Q5 Dev 17.10 104.64 106.441 106.47 0.005680 0.80 21.34 26.88 0.29
1 30. Q10 Ex 19.78 104.64 106.541 106.57 0.006223 0.81 24.42 32.46 0.30
1 30. Q10 Dev 19.81 104.64 106.543 106.58 0.006194 0.81 24.49 32.51 0.30
1 30. Q20 Ex 24.75 104.64 106.721 106.75 0.005467 0.81 30.61 37.08 0.28
1 30. Q20 Dev 24.68 104.64 106.719 106.75 0.005459 0.81 30.55 37.00 0.28
1 30. Q50 Ex 35.12 104.64 107.123 107.15 0.003342 0.73 47.89 46.46 0.23
1 30. Q50 Dev 35.10 104.64 107.115 107.14 0.003418 0.74 47.50 46.33 0.23
1 30. Q100 Ex 44.04 104.64 107.492 107.51 0.002111 0.67 66.17 52.62 0.19
1 30. Q100 Dev 43.98 104.64 107.483 107.51 0.002148 0.67 65.70 52.49 0.19
1 20 Q2 Ex 11.92 104.30 105.911 104.97 105.94 0.005716 0.75 15.88 21.11 0.28
1 20 Q2 Dev 11.90 104.30 105.910 105.00 105.94 0.005877 0.76 15.66 20.96 0.28
1 20 Q5 Ex 17.08 104.30 106.249 105.16 106.27 0.004291 0.60 28.46 43.90 0.24
1 20 Q5 Dev 17.10 104.30 106.249 105.19 106.27 0.004380 0.60 28.28 43.95 0.24
1 20 Q10 Ex 19.78 104.30 106.371 105.25 106.39 0.003340 0.58 33.91 45.28 0.22
1 20 Q10 Dev 19.81 104.30 106.373 105.27 106.39 0.003375 0.59 33.77 45.17 0.22
1 20 Q20 Ex 24.75 104.30 106.592 105.40 106.61 0.002414 0.56 44.57 50.32 0.19

 

 

Page 42

HEC-RAS River: Myall St Reach: 1 (Continued)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chni Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (mim) (mis) (m2) (m)
1 20 Q20 Dev 24.68 104.30 106.588 105.41 106.60 0.002454 0.56 44.20 50.26 0.19
1 20 Q50 Ex 35.12 104.30 107.043 105.67 107.06 0.001595 0.50 70.22 68.46 0.16
1 20 Q50 Dev 35.10 104.30 107.042 105.69 107.05 0.001369 0.51 69.25 58.84 0.15
1 20 Q100 Ex 44.04 104.30 107.443 106.04 107.45 0.001004 0.44 99.28 82.11 0.13
1 20 Q100 Dev 43.98 104.30 107.439 106.05 107.45 0.000844 0.47 93.03 60.89 0.12
1 10 Culvert
1 05, Q2 Ex 11.92 104.30 105.819 105.82 0.000430 0.22 55.44 72.54 0.08
1 05, Q2 Dev 11.90 104.30 105.818 105.82 0.000430 0.21 55.40 72.51 0.08
1 05, Q5 Ex 17.08 104.30 106.089 106.09 0.000359 0.22 76.16 81.68 0.07
1 05, Q5 Dev 17.10 104.30 106.089 106.09 0.000359 0.22 76.20 81.69 0.07
1 05, Q10 Ex 19.78 104.30 106.170 106.17 0.000380 0.24 82.93 84.69 0.08
1 05, Q10 Dev 19.81 104.30 106.171 106.17 0.000380 0.24 83.01 84.73 0.08
1 05, Q20 Ex 24.75 104.30 106.312 106.32 0.000397 0.26 95.34 88.66 0.08
1 05, Q20 Dev 24.68 104.30 106.311 106.31 0.000397 0.26 95.18 88.63 0.08
1 05, Q50 Ex 35.12 104.30 106.606 106.61 0.000375 0.29 122.06 93.21 0.08
1 05, Q50 Dev 35.10 104.30 106.605 106.61 0.000375 0.29 122.02 93.20 0.08
1 05, Q100 Ex 44.04 104.30 106.807 106.81 0.000378 0.31 141.09 95.93 0.08
1 05, Q100 Dev 43.98 104.30 106.806 106.81 0.000378 0.31 140.98 95.91 0.08
1 01 Q2 Ex 11.92 103.78 105.695 105.71 0.002167 0.45 26.29 37.84 0.17
1 01 Q2 Dev 11.90 103.78 105.694 105.70 0.002166 0.45 26.26 37.83 0.17
1 01 Q5 Ex 17.08 103.78 105.985 105.99 0.001787 0.43 39.41 52.63 0.16
1 01 Q5 Dev 17.10 103.78 105.986 106.00 0.001788 0.43 39.43 52.64 0.16
1 01 Q10 Ex 19.78 103.78 106.061 106.07 0.001841 0.45 43.50 55.31 0.16
1 01 Q10 Dev 19.81 103.78 106.062 106.07 0.001841 0.45 43.55 55.34 0.16
1 01 Q20 Ex 24.75 103.78 106.199 106.21 0.001863 0.48 51.50 60.83 0.17
1 01 Q20 Dev 24.68 103.78 106.198 106.21 0.001860 0.48 51.40 60.74 0.17
1 01 Q50 Ex 35.12 103.78 106.496 106.51 0.001993 0.48 73.26 91.58 0.17
1 01 Q50 Dev 35.10 103.78 106.495 106.51 0.001993 0.48 73.22 91.56 0.17
1 01 Q100 Ex 44.04 103.78 106.705 106.72 0.001550 0.47 93.26 98.78 0.16
1 01 Q100 Dev 43.98 103.78 106.704 106.72 0.001553 0.47 93.11 98.73 0.16
-05 Q2 Ex 13.40 103.85 105.010 105.03 0.002686 0.57 23.64 28.67 0.20
1 -05 Q2 Dev 13.39 103.85 105.009 105.03 0.002687 0.57 23.62 28.66 0.20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 43

HEC-RAS River: Myall St Reach: 1 (Continued)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Reach River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chni Flow Area Top Width Froude # Chl
(m3/s) (m) (m) (m) (m) (mim) (mis) (m2) (m)
1 -05 Q5 Ex 19.23 103.85 105.422 105.43 0.002242 0.47 41.34 59.02 0.18
1 -05 Q5 Dev 19.24 103.85 105.422 105.43 0.002242 0.47 41.35 59.02 0.18
1 -05 Q10 Ex 22.36 103.85 105.542 105.55 0.001877 0.46 48.58 61.58 0.17
1 -05 Q10 Dev 22.39 103.85 105.543 105.55 0.001873 0.46 48.66 61.61 0.17
1 -05 Q20 Ex 27.90 103.85 105.744 105.75 0.001451 0.45 61.40 65.23 0.15
1 -05 Q20 Dev 27.82 103.85 105.741 105.75 0.001456 0.45 61.22 65.19 0.15
1 -05 Q50 Ex 39.21 103.85 106.122 106.13 0.000994 0.45 87.01 70.12 0.13
1 -05 Q50 Dev 39.19 103.85 106.121 106.13 0.000994 0.45 86.97 70.11 0.13
1 -05 Q100 Ex 48.84 103.85 106.413 106.42 0.000774 0.45 107.72 71.18 0.12
1 -05 Q100 Dev 48.77 103.85 106.411 106.42 0.000775 0.45 107.58 71.18 0.12
1 -10 Q2 Ex 13.40 102.54 104.928 104.93 0.001337 0.34 39.17 59.96 0.14
1 -10 Q2 Dev 13.39 102.54 104.927 104.93 0.001338 0.34 39.13 59.92 0.14
1 -10 Q5 Ex 19.23 102.54 105.378 105.38 0.000568 0.26 73.16 87.83 0.09
1 -10 Q5 Dev 19.24 102.54 105.379 105.38 0.000568 0.26 73.19 87.83 0.09
1 -10 Q10 Ex 22.36 102.54 105.506 105.51 0.000478 0.27 84.37 87.83 0.09
1 -10 Q10 Dev 22.39 102.54 105.507 105.51 0.000478 0.27 84.49 87.83 0.09
1 -10 Q20 Ex 27.90 102.54 105.716 105.72 0.000387 0.27 102.80 87.83 0.08
1 -10 Q20 Dev 27.82 102.54 105.713 105.72 0.000388 0.27 102.55 87.83 0.08
1 -10 Q50 Ex 39.21 102.54 106.102 106.11 0.000298 0.29 136.70 87.83 0.07
1 -10 Q50 Dev 39.19 102.54 106.101 106.11 0.000298 0.29 136.64 87.83 0.07
1 -10 Q100 Ex 48.84 102.54 106.397 106.40 0.000261 0.30 162.63 87.83 0.07
1 -10 Q100 Dev 48.77 102.54 106.395 106.40 0.000261 0.30 162.46 87.83 0.07
1 -15 Q2 Ex 13.40 102.68 104.906 103.28 104.91 0.000200 0.21 65.00 51.02 0.06
1 -15 Q2 Dev 13.39 102.68 104.905 103.28 104.91 0.000200 0.21 64.96 51.01 0.06
1 -15 Q5 Ex 19.23 102.68 105.361 103.39 105.36 0.000200 0.21 90.15 67.07 0.06
1 -15 Q5 Dev 19.24 102.68 105.361 103.39 105.36 0.000200 0.21 90.16 67.07 0.06
1 -15 Q10 Ex 22.36 102.68 105.489 103.44 105.49 0.000200 0.23 98.77 67.07 0.06
1 -15 Q10 Dev 22.39 102.68 105.491 103.44 105.49 0.000200 0.23 98.87 67.07 0.06
1 -15 Q20 Ex 27.90 102.68 105.700 103.53 105.70 0.000200 0.25 112.93 67.07 0.06
1 -15 Q20 Dev 27.82 102.68 105.697 103.53 105.70 0.000200 0.25 112.74 67.07 0.06
1 -15 Q50 Ex 39.21 102.68 106.088 103.70 106.09 0.000200 0.28 138.90 67.07 0.06
1 -15 Q50 Dev 39.19 102.68 106.087 103.70 106.09 0.000200 0.28 138.86 67.07 0.06
1 -15 Q100 Ex 48.84 102.68 106.383 103.83 106.39 0.000200 0.31 158.74 67.07 0.06
1 -15 Q100 Dev 48.77 102.68 106.381 103.83 106.39 0.000200 0.31 158.61 67.07 0.06

 

 

Page 44

                                                                      J4279   Plan: Ex      13/01/2015
                                                                                 RS = 70
                                                                .08                                      .02          .025
                                                                                                                                                 Legend
                 116
                                                                                                                                                 EG Q100
                 114                                                                                                                             WS Q100
 Elevation (m)




                 112                                                                                                                             Ground

                 110                                                                                                                             Bank Sta

                 108

                 106

                 104
                       0                                  100                     200                          300
                                                                              Station (m)

                                                                      J4279   Plan: Ex      13/01/2015
                                                                                 RS = 60
                           .02                                        .08                                            .02           .025
                                                                                                                                                 Legend
                 116
                                                                                                                                                 EG Q100
                 114                                                                                                                             WS Q100
 Elevation (m)




                 112                                                                                                                             Ground

                 110                                                                                                                             Bank Sta

                 108

                 106

                 104
                       0                                  100                     200                          300
                                                                              Station (m)

                                                                      J4279   Plan: Ex      13/01/2015
                                                                                 RS = 50
                                                    .04                                           .08                        .02          .025
                                                                                                                                                 Legend
                 116
                                                                                                                                                 EG Q100
                 114                                                                                                                             WS Q100
 Elevation (m)




                 112                                                                                                                             Ground

                 110                                                                                                                             Bank Sta

                 108

                 106

                 104
                       0                                  100                     200                          300
                                                                              Station (m)
1 cm Horiz. = 18 m               1 cm Vert. = 4 m

Page 45

                                                                J4279   Plan: Ex      13/01/2015
                                                                           RS = 40
                                              .04                                          .08                 .02
                                                                                                                     Legend
                 116
                                                                                                                     EG Q100
                 114                                                                                                 WS Q100
 Elevation (m)




                 112                                                                                                 Ground

                 110                                                                                                 Bank Sta

                 108

                 106

                 104
                       0                                  100               200                          300
                                                                        Station (m)

                                                                J4279   Plan: Ex      13/01/2015
                                                                           RS = 30
                                                    .04                                            .08
                                                                                                                     Legend
                 116
                                                                                                                     EG Q100
                 114                                                                                                 WS Q100
 Elevation (m)




                 112                                                                                                 Ground

                 110                                                                                                 Bank Sta

                 108

                 106

                 104
                       0                                  100               200                          300
                                                                        Station (m)

                                                                J4279   Plan: Ex      13/01/2015
                                                                           RS = 20
                                                                 .08
                                                                                                                     Legend
                 116
                                                                                                                     EG Q100
                 114                                                                                                 WS Q100
 Elevation (m)




                 112                                                                                                 Crit Q100

                 110                                                                                                 Ground
                                                                                                                     Bank Sta
                 108

                 106

                 104
                       0                                  100               200                          300
                                                                        Station (m)
1 cm Horiz. = 18 m         1 cm Vert. = 4 m

Page 46

                                                    J4279   Plan: Ex        13/01/2015
                                                            RS = 10        Culv
                                                     .08
                                                                                               Legend
                 116
                                                                                               EG Q100
                 114                                                                           WS Q100
 Elevation (m)




                 112                                                                           Crit Q100

                 110                                                                           Ground

                                                                                               Bank Sta
                 108

                 106

                 104
                       0                      100                200                     300
                                                             Station (m)

                                                    J4279   Plan: Ex        13/01/2015
                                                            RS = 10        Culv
                                                    .08
                                                                                               Legend
                 116
                                                                                               EG Q100
                 114                                                                           WS Q100
 Elevation (m)




                 112                                                                           Crit Q100

                 110                                                                           Ground
                                                                                               Bank Sta
                 108

                 106

                 104
                       0                      100                200                     300
                                                             Station (m)

                                                    J4279   Plan: Ex        13/01/2015
                                                                RS = 05
                                                    .08
                                                                                               Legend
                 116
                                                                                               EG Q100
                 114                                                                           WS Q100
 Elevation (m)




                 112                                                                           Ground

                 110                                                                           Bank Sta

                 108

                 106

                 104
                       0                      100                200                     300
                                                             Station (m)
1 cm Horiz. = 18 m         1 cm Vert. = 4 m

Page 47

                                                             J4279   Plan: Ex      13/01/2015
                                                                        RS = 01
                                                      .08
                 116                                                                                  Legend

                 114                                                                                  EG Q100
                                                                                                      WS Q100
 Elevation (m)




                 112
                                                                                                      Ground
                 110
                                                                                                      Bank Sta
                 108

                 106

                 104

                       0                               100               200                    300
                                                                     Station (m)

                                                             J4279   Plan: Ex      13/01/2015
                                                                       RS = -05
                             .08              .
                                              0                                                       Legend
                 116                          8
                                                                                                      EG Q100
                 114
                                                                                                      WS Q100
 Elevation (m)




                 112
                                                                                                      Ground
                 110                                                                                  Bank Sta

                 108

                 106

                 104
                       0                               100               200                    300
                                                                     Station (m)

                                                             J4279   Plan: Ex      13/01/2015
                                                                       RS = -10
                                   .08            .
                                                  0                                                   Legend
                                                  8
                 114
                                                                                                      EG Q100
                 112                                                                                  WS Q100
 Elevation (m)




                 110                                                                                  Ground

                 108                                                                                  Bank Sta

                 106

                 104

                 102
                       0                               100               200                    300
                                                                     Station (m)
1 cm Horiz. = 18 m         1 cm Vert. = 4 m

Page 48

                                                        J4279   Plan: Ex      13/01/2015
                                                                  RS = -15
                            .08               .
                 116                          0                                                  Legend
                                              8
                 114                                                                             EG Q100

                 112                                                                             WS Q100
 Elevation (m)




                                                                                                 Crit Q100
                 110
                                                                                                 Ground
                 108
                                                                                                 Bank Sta
                 106

                 104

                       0                          100               200                    300
                                                                Station (m)




1 cm Horiz. = 18 m         1 cm Vert. = 4 m

Page 49

                                                                        J4279   Plan: Dev        13/01/2015
                                                                                    RS = 70
                                                                 .08                                          .02          .025
                                                                                                                                         Legend
                 116
                                                                                                                                         EG Q100
                 114                                                                                                                     WS Q100
 Elevation (m)




                 112                                                                                                                     Ground

                 110                                                                                                                     Bank Sta

                 108

                 106

                 104
                       0                                   100                       200                            300
                                                                                 Station (m)

                                                                        J4279   Plan: Dev        13/01/2015
                                                                                    RS = 60
                           .02                                          .08                                               .02     .025
                                                                                                                                         Legend
                 116
                                                                                                                                         EG Q100
                 114                                                                                                                     WS Q100
 Elevation (m)




                 112                                                                                                                     Ground

                 110                                                                                                                     Bank Sta

                 108

                 106

                 104
                       0                                   100                       200                            300
                                                                                 Station (m)

                                                                        J4279   Plan: Dev        13/01/2015
                                                                                    RS = 50
                           .04                      .025          .04                      .08                            .08
                                                                                                                                         Legend
                 116
                                                                                                                                         EG Q100
                 114                                                                                                                     WS Q100
 Elevation (m)




                 112                                                                                                                     Ground

                 110                                                                                                                     Bank Sta

                 108

                 106

                 104
                       0                                   100                       200                            300
                                                                                 Station (m)
1 cm Horiz. = 18 m               1 cm Vert. = 4 m

Page 50

                                                                         J4279     Plan: Dev         13/01/2015
                                                                                          RS = 40
                                .04                        .025    .04                                                  .08
                                                                                                                                          Legend
                 116
                                                                                                                                          EG Q100
                 114                                                                                                                      WS Q100
 Elevation (m)




                 112                                                                                                                      Ground

                 110                                                                                                                      Bank Sta

                 108

                 106

                 104
                       0                             100                                   200                                      300
                                                                                       Station (m)

                                                                         J4279     Plan: Dev         13/01/2015
                                                                                          RS = 30
                                      .02                         .04                                             .08
                                                                                                                                          Legend
                 116
                                                                                                                                          EG Q100
                 114                                                                                                                      WS Q100
 Elevation (m)




                 112                                                                                                                      Ground

                 110                                                                                                                      Bank Sta

                 108

                 106

                 104
                       0                             100                                   200                                      300
                                                                                       Station (m)

                                                                         J4279     Plan: Dev         13/01/2015
                                                                                          RS = 20
                                              .025                               .04                                          .08
                                                                                                                                          Legend
                 116
                                                                                                                                          EG Q100
                 114                                                                                                                      WS Q100
 Elevation (m)




                 112                                                                                                                      Crit Q100

                 110                                                                                                                      Ground
                                                                                                                                          Bank Sta
                 108

                 106

                 104
                       0                             100                                   200                                      300
                                                                                       Station (m)
1 cm Horiz. = 18 m         1 cm Vert. = 4 m

Page 51

                                                           J4279     Plan: Dev            13/01/2015
                                                                         RS = 10        Culv
                                              .025                 .04                                 .08
                                                                                                                   Legend
                 116
                                                                                                                   EG Q100
                 114                                                                                               WS Q100
 Elevation (m)




                 112                                                                                               Crit Q100

                 110                                                                                               Ground

                                                                                                                   Bank Sta
                 108

                 106

                 104
                       0                             100                      200                            300
                                                                          Station (m)

                                                           J4279     Plan: Dev            13/01/2015
                                                                         RS = 10        Culv
                                                            .08
                                                                                                                   Legend
                 116
                                                                                                                   EG Q100
                 114                                                                                               WS Q100
 Elevation (m)




                 112                                                                                               Crit Q100

                 110                                                                                               Ground
                                                                                                                   Bank Sta
                 108

                 106

                 104
                       0                             100                      200                            300
                                                                          Station (m)

                                                           J4279     Plan: Dev            13/01/2015
                                                                             RS = 05
                                                            .08
                                                                                                                   Legend
                 116
                                                                                                                   EG Q100
                 114                                                                                               WS Q100
 Elevation (m)




                 112                                                                                               Ground

                 110                                                                                               Bank Sta

                 108

                 106

                 104
                       0                             100                      200                            300
                                                                          Station (m)
1 cm Horiz. = 18 m         1 cm Vert. = 4 m

Page 52

                                                             J4279   Plan: Dev      13/01/2015
                                                                         RS = 01
                                                      .08
                 116                                                                                   Legend

                 114                                                                                   EG Q100
                                                                                                       WS Q100
 Elevation (m)




                 112
                                                                                                       Ground
                 110
                                                                                                       Bank Sta
                 108

                 106

                 104

                       0                               100                200                    300
                                                                      Station (m)

                                                             J4279   Plan: Dev      13/01/2015
                                                                        RS = -05
                             .08              .
                                              0                                                        Legend
                 116                          8
                                                                                                       EG Q100
                 114
                                                                                                       WS Q100
 Elevation (m)




                 112
                                                                                                       Ground
                 110                                                                                   Bank Sta

                 108

                 106

                 104
                       0                               100                200                    300
                                                                      Station (m)

                                                             J4279   Plan: Dev      13/01/2015
                                                                        RS = -10
                                   .08            .
                                                  0                                                    Legend
                                                  8
                 114
                                                                                                       EG Q100
                 112                                                                                   WS Q100
 Elevation (m)




                 110                                                                                   Ground

                 108                                                                                   Bank Sta

                 106

                 104

                 102
                       0                               100                200                    300
                                                                      Station (m)
1 cm Horiz. = 18 m         1 cm Vert. = 4 m

Page 53

                                                        J4279   Plan: Dev      13/01/2015
                                                                   RS = -15
                            .08               .
                 116                          0                                                   Legend
                                              8
                 114                                                                              EG Q100

                 112                                                                              WS Q100
 Elevation (m)




                                                                                                  Crit Q100
                 110
                                                                                                  Ground
                 108
                                                                                                  Bank Sta
                 106

                 104

                       0                          100                200                    300
                                                                 Station (m)




1 cm Horiz. = 18 m         1 cm Vert. = 4 m

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.