Log in to see the plans as drawn4.2 Developed Model
The existing URBS model was modified to represent development of the site. Flow
directions, sub-catchment use and fraction imperviousness were updated using the
development plan which is presented in Figure 5, Appendix A. A comparison between the
existing and developed URBS model results is presented in Table 4.3 below.
Table 4.3 –URBS Model Results
ARI Existing URBS Developed URBS Difference
years m3/s m3/s m3/s
1 8.55 8.57 0.02
2 11.92 11.90 -0.02
5 17.08 17.10 0.01
10 19.78 19.81 0.03
20 24.75 24.68 -0.08
50 35.12 35.10 -0.02
100 44.04 43.98 -0.06
The URBS model results show a minor increase in peak discharges during a Q1, Q5 and Q10
storm event; however reductions are seen during a Q20, Q50 and Q100 storm event. The URBS
results show a net marginal benefit. The nominal storage in the bio retention will attenuate
the frequent low flows. Therefore it is considered that a detention basin is not required.
Detailed URBS input data for the Developed Scenario is presented in Appendix C.
J4279 Report 1.0.doc
14 January 2015 Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.