Original source · versioned page text
MCU14/0056 Stormwater Quantity Management Plan Att D Information response
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWater Consulting i -15 106.088 106.087 -0.001 Table 5.4 — Qx9 HECRAS Results Comparison XS Existing Inundation Level Proposed Developed Increase m AHD m AHD m 70 107.301 107.298 -0.003 60 107.323 107.320 -0.003 50 107.227 107.225 -0.002 40 107.076 107.073 -0.003 30 106.721 106.719 -0.002 20 106.592 106.588 -0.004 5 106.312 106.311 -0.001 1 106.199 106.198 -0.001 -5 105.744 105.741 -0.003 -10 105.716 105.713 -0.003 -15 105.7 105.697 -0.003 Table 5.5 — Qi9 HECRAS Results Comparison XS Existing Inundation Level Proposed Developed Increase m AHD m AHD m 70 107.122 107.123 0.001 60 107.142 107.143 0.001 50 107.047 107.049 0.002 40 106.908 106.909 0.001 30 106.541 106.543 0.002 20 106.371 106.373 0.002 5 106.17 106.171 0.001 1 106.061 106.062 0.001 -5 105.542 105.543 0.001 -10 105.506 105.507 0.001 -15 105.489 105.491 0.002 J4279 Report 1.0.doc 14 January 2015 Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.