Original source · versioned page text
MCU14/0056 Stormwater Quantity Management Plan Att D Information response
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWater Consulting i Get. Print. Site Get. Get. Add Rain #31 Print. B2-In DAM ROUTE VBF=0 NUMBER=28 0.000000 0.000000 0.032155 1.500000 0.046870 3000000 0.055590 4.510000 0.064310 6.010000 0.190800 7.510000 0.328740 9.010000 0.466680 10.51000 0.567000 12.02000 0.667320 13.52000 1.094670 15.29000 1.679790 18.17000 2.191770 21.04000 2.718735 23.92000 3.510075 26.79000 4.301415 29.58000 5.026810 32.20000 5.818150 34.81000 6.879350 37.42000 8.046670 40.03000 9.107870 42.51000 10.27519 44.80000 11.59317 47.09000 13.15657 49.37000 13.93827 51.66000 14,.56363 53.94000 15.03265 56.29000 16.43971 64.93000 } } Print. B2-Out Print. Point-1 end of catchment details. J4279 Report 1.0.doc 14 January 2015 Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.