Original source · versioned page text
MCU14/0056 Stormwater Quantity Management Plan Att D Information response
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWater Consulting i Route thru #26 Get. Add Rain #26 Route thru #31 Print. Site Get. Get. Add Rain #31 Print. B1-In L=0.053 L=0.032 L=0.091 L=0.133 DAM ROUTE VBF=0 NUMBER=28 0.000000 0.000000 0.032155 1.500000 0.046870 3000000 0.055590 4.510000 0.064310 6.010000 0.190800 7.510000 0.328740 9.010000 0.466680 10.51000 0.567000 12.02000 0.667320 13.52000 1.094670 15.29000 1.679790 18.17000 2.191770 21.04000 2.716440 23.92000 3.498600 26.79000 4.280760 29.58000 4.997740 32.20000 5.779900 34.81000 6.613250 37.42000 7.529935 40.03000 8.387420 42.51000 9.569590 44.80000 10.89837 47.09000 12.46177 49.37000 13.24347 51.66000 13.86883 53.94000 14,33785 56.29000 15.74491 64.93000 } } Print. B1-Out Print. Point-1 end of catchment details. J4279 Report 1.0.doc 14 January 2015 Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.