Original source · versioned page text
MCU14/0056 Stormwater Quantity Management Plan Att D Information response
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn J4279 Plan: Dev 13/01/2015
RS = 01
.08
116 Legend
114 EG Q100
WS Q100
Elevation (m)
112
Ground
110
Bank Sta
108
106
104
0 100 200 300
Station (m)
J4279 Plan: Dev 13/01/2015
RS = -05
.08 .
0 Legend
116 8
EG Q100
114
WS Q100
Elevation (m)
112
Ground
110 Bank Sta
108
106
104
0 100 200 300
Station (m)
J4279 Plan: Dev 13/01/2015
RS = -10
.08 .
0 Legend
8
114
EG Q100
112 WS Q100
Elevation (m)
110 Ground
108 Bank Sta
106
104
102
0 100 200 300
Station (m)
1 cm Horiz. = 18 m 1 cm Vert. = 4 m
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.