Skip to the record
Accept no imitations.

Council archive · source document

planning report mitti realignment 15.02.22 · RAL22/0002

of 9

Text shows just the words. Original shows the document exactly as it was published.

4.0 Planning assessment

4.1      Key matters
4.1.1 Lot shape
The lot sizes resulting from the proposal comply with the minimum lot size of 600m² sought by the
Planning Scheme. However, the proposal does result in a small variation in the common boundary
of the 2 subject lots and therefore are slightly irregular shapes. AO5.1 and AO5.2 of the
Reconfiguring a Lot Code seek that lots are the shape that can accommodate their intended use and
in are generally predominately a regular rectangular shape. These 2 provisions are provided below
for reference.

AO5.1
New lots are of a size and shape that can accommodate the land uses intended by the zone.

AO5.2
In general, lots have a predominantly regular, rectangular shape.

Editor's note-topographical constraints or environmental values may call for irregular property boundaries.

The corresponding Performance OutcomePO5 is also provided below for reference.

PO5
New lots have areas and dimensions that:
  (a) are consistent with the purpose and overall outcomes of the applicable zone or zones;
  (b) are consistent with the size and character of surrounding lots;
  (c) can accommodate land uses that are consistent with the purpose and overall outcomes of
       the applicable zone;
  (d) allow for siting and construction of buildings, structures, access ways and car parking while:-
         (ii) retaining ecologically important areas and ecological linkages;
         (iii) minimising risk of soil erosion, landslide, flooding and bushfire;
         (iv) minimising earthworks or retaining walls associated with construction on sloping sites;
         (v) retaining the scenic amenity and vegetated character of the landscape;
         (vi) retaining culturally significant features and protecting views to culturally significant
                features;
         (vii) minimising detrimental impacts of effluent disposal or storm water runoff; including
                open space for landscaping; ensuring safe vehicular manoeuvring areas without
                concentration of driveways in one space; and
         (viii) where not in a water or sewerage service area, allow for water storage tanks and
                suitable effluent disposal.

The proposal, while a slightly odd shape to accommodate the encroachments, comply with PO5 for
the following reasons:

•   the lots accommodate dwelling houses which is consistent with the purpose and intent of the
    Low density residential zone in which the lots are located;
•   the proposed change to the lot sizes is inconsequential as it will not be recognisable from the
    street;



                                                                                                  Page 7 of 9

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

planning report mitti realignment 15.02.22.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.