Electric Bus Feasibility Study 100,000 100,000 70,027 70.03%
Noosa Heads - Noosa Parade Stop 114 50,000 50,000 756 1.51%
Noosa Heads - Noosa Parade Stop 26 40,000 40,000 753 1.88%
Noosa Heads - Noosa Parade Stop 27 40,000 40,000 753 1.88%
Noosa Heads - Noosa Parade Stop 28 65,000 65,000 100 0.15%
Noosa Junction Transit Centre - improve 40,000 40,000 0 0.00%
Peregian Beach - David Low Way Stop 87 125,000 125,000 898 0.72%
Sunrise Beach - Wollomia Way Stop 11 40,000 40,000 0 0.00%
Whole of Shire - bus shelter DDA 20,000 20,000 9,219 46.10%
Noosa Bus Station Safer Streets Program 175,500 117,900 0 0.00%
Noosa Heads - Noosa Parade Translink 700596 0 410,000 0 0.00%
Noosa Heads - Noosa Parade Translink 700584 0 0 120 0.00%
Tewantin - Butler St Translink 700491 0 0 270 0.00%
Noosaville - Weyba Rd Translink 700521 0 0 120 0.00%
New Noosa Bus Shelters - Design 0 50,000 16,097 32.19%
Total Public Transport Infrastructure 695,500 1,097,900 99,188 9.03%
Annual Sealed Road Renewal & Rehabilitation Program 0 0 23,658 0.00%
Sealed Road Pavement surveys and Investigations 0 51,600 S67 1.10%
Whole of Shire - pavement surveys 60,000 60,000 0 0.00%
Whole of Shire - reseal and rehab 5,000,000 5,553,610 896,099 16.14%
Noosa Heads - Noosa Parade Master Plan 100,000 100,000 0 0.00%
Noosaville - Eumundi Noosa Road corridor 20,000 79,085 0 0.00%
Emergent all infrastructure renewal 2,951,898 2,545,350 11,640 0.46%
Total Sealed Roads Network 8,131,898 8,389,645 931,965 11.41%
Girraween Sports Ground irrigation 28,000 14,000 15,583 111.31%
Girraween Sports Complex Lighting 0 10,000 0 0.00%
Total Sports Ground and Facilities 28,000 24,000 15,583 64.93%
Stormwater Drainage
Daintree Estate - Flood Mitagation Planning and Design 0 0 0 0.00%
Gympie Terrace Pipe Rehabilitation - Investigation & Design 0 11,300 0 0.00%
Rifle Street Pomona - Flood Mitigation Planning and Design 0 0 0 0.00%
Seaview Ck - open drain civil works 0 44,700 41,633 93.14%
Gympie Terrace pipe rehabilitation 200,000 200,000 0 0.00%
Re-lining of Ben Lexcen stormwater 50,000 50,000 0 0.00%
Whole of Shire - stormwater CCTV 10,000 10,000 739 7.39%
Whole of Shire - stormwater structures 150,000 150,000 0 0.00%
Whole of Shire - Flood mitigation stage 2,802,970 2,802,970 138,474 4.94%
Total Stormwater Drainage 3,212,970 3,268,970 180,845 5.53%
Forward Planning for Streetscape and Road Corridor improveme 0 1,715 1,715 100.00%
Peregian Beach - precinct planning 50,000 50,000 0 0.00%
Total Streetscapes and Road Corridors 50,000 51,7145 4,715 3.32%
Eenie Creek Road / Langura Street Intersection safety upgrad 0 16,503 16,503 100,00%
Eenie Creek Road / Walter Hay Drive Intersection safety upgr 0 109,100 21,024 19.27%
Weyba Road Reef Street Intersection Improvements - PIP 0 118,500 2,671 2.25%
Noosa Junction Disabled Parking CBA Frontage 0 20,000 3,958 19,79%
Whole of Shire - On Road Cycle Network 125,000 0 0 0.00%
Sunrise Beach - Ben Lexcen Dr school 70,000 80,000 4,262 5.33%
Whole of Shire - Road Directional Signs 40,000 40,000 0 0.00%
Cooroy Noosa Road - Beckmans Rd Intersec 110,000 110,000 369 0.34%
Total Transport and Infrastructure Management 345,000 494,103 48,786 987%
Noosaville Landfill - bio basin 446,900 446,900 6,041 1.35%
Noosaville Landfill - sediment control 297,000 297,000 4,667 1.57%
Noosaville Landfill - stormwater 50,000 0 1,760 0.00%
Total Waste Management 793,900 743,900 12,468 1.68%
Grand Total 22,676,868 24,893,093 4,638,049 18.63%
Page 128 of 147See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.