2015-01-12 General Committee Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                   12 January 2015


RECOMMENDATION
That Council note the report by the Development Engineer to the General Committee Meeting
dated 12 January 2015 regarding Application No. OPW14/0307 for a Development Permit for
Operational Works for Prescribed Tidal Works – Commercial Jetty situated at 256 Gympie
Terrace, Noosaville and approve the application in accordance with the following conditions:
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the table below and as
      may be amended by these conditions.

       Plan No.           Rev.   Plan/Document Name                               Date
       4656-100           -      General Notes & Locality Plan, prepared by       29 May 2014
                                 International Marina Consultants Pty Ltd
       4656-101           -      Demolition Plan, prepared by International       28 May 2014
                                 Marina Consultants Pty Ltd
       4656-102/A         A      General Arrangement, prepared by International   16 October 2014
                                 Marina Consultants Pty Ltd
       4656-103/A         A      Elevation, prepared by International Marina      16 October 2014
                                 Consultants Pty Ltd
       4656-104/A         A      Pile Layout, Profile and Schedule, prepared by   16 October 2014
                                 International Marina Consultants Pty Ltd
       4656-105/A         A      Pontoon Setout, prepared by International        16 October 2014
                                 Marina Consultants Pty Ltd
       4656-106           -      1.2m Overall Width x 7.5 Long Gangway,           30 May 2014
                                 prepared by International Marina Consultants
                                 Pty Ltd
       4656-109           A      Pontoon Setout, prepared by International        30 May 2014
                                 Marina Consultants Pty Ltd
2.    All structures associated with the use (jetty and pontoons) must be constructed wholly
      within the lease area as shown on SP146043 dated 4 December 2013.
3.    To ensure the safety of persons accessing the approved works and to prevent
      environmental harm, a safety audit of the on-site fuel storage tanks, bowsers and
      associated pipework, valves, vents and systems shall be conducted by a suitably qualified
      professional and submitted to Council for approval. The audit shall demonstrate that the
      fuel systems are in a safe and serviceable condition or, where necessary, identify repair
      and rectification requirements to meet the relevant Australian Standards and industry best
      practice environmental management.         Any repair works must be completed, with
      certification submitted by the auditor to Council, prior to the use of the new works
      (pontoon/jetty extensions).
4.    Structures shall be designed and constructed such that they are free standing within the
      waterway and are not connected to or behind the revetment wall or rock wall.
5.    No posts or vertical supports of the proposed structures are to extend vertically above the
      height of the new piles.
6.    No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
      elevating a vessel above the water without Council approval.
7.    The jetty shall be constructed in a manner to render the underside area vermin proof.
8.    The connection point for any electrical reticulation system extending beyond the revetment
      wall must be located above the Q100 flood level.
9.    Lighting associated with the use shall be designed, installed, operated, and maintained in
      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10.   Boat repair activities will not be permitted on site.

                                                                                     Page 16 of 147
Log in to download the original file

2015-01-12 General Committee Agenda(PDF, 14MB).pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.