Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 2, Item 13 — Tidal works, or works within a
coastal management district (coastal protection)
Schedule 7, Table 2, Item 15 — Tidal works, or works within a
coastal management district (maritime safety)
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Further advice
Under section 287(6) of the Sustainable Planning Act 2009, the department offers advice
about the application to the assessment manager—see Attachment 3.
Approved plans and specifications
The department requires that the following plans and specifications set out below must be
attached to any development approval.
Drawing Title Prepared by | Date | Drawingno. |
Aspect of development: Operational works
Demolition Plan International Marina Consultants 28 May 2014 4656-101
Pty Ltd
Plan of Lot 158 - N/A Survey Plan 4 December SP146043
Cancelling Lot 158 on 2013
$P233178 & Part of
U.S.L, being part of the
Noosa River
General Arrangement International Marina Consultants 16 October 4656-102/A
Pty Ltd 2014
Elevation International Marina Consultants 16 October 4656-103/A
Pty Ltd 2014
Pile Layout, Profile and | International Marina Consultants 16 October 4656-104/A
Schedule Pty Ltd 2014
Pontoon Setout International Marina Consultants 16 October 4656-105/A
Pty Ltd 2014
1.2m Overall Width x International Marina Consultants 30 May 2014 4656-106
7.5m Long Gangway Pty Ltd
Department of State Development, Infrastructure and Planning Page 2
Page 23 of 147See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.