Skip to the record
Search everything, all in one place.

Original source · versioned page text

2016-03-01 Infrastructure and Services Committee Agenda

of 81

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   1 MARCH 2016




                                                      Page 13 of 81

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                              1 MARCH 2016

                         Attachment 2 - Rufous Street Precinct Master Plan - Stage 1                                                                      Attachment 2

                                      1 UPGRADE LANEWAY                          14 CAFE & ALL PERSON PUBLIC AMENITIES 21) RELOCATED PEDESTRIAN CROSSING
                                                                                                                         SUBJECT TO FURTHER INVESTGATION
                                      2 ‘POCKET PARK’ - 6 CAR SPACES            15 NEW IT ENTERPRISE DIGITAL HUB BUILDING - 750 sqm G& accesssie HS AND CAR PARKING
                                      6 23 ON GRADE CAR PARKING AS PART OF STAGE 1 17 COMMERCIAL & PUBLIC CAR PARKING - 68 SPACES.
                                      1 PEGA GED stem NCLONG AN SAER             ap reSTUN ARNE                                       eo                             LU
                                        SUBJECT TO DESIGN & CONSULATION                STREET PLANTING                                                               a
                                      8) OVER FLOW CAR PARKING                      ti                                 G      ®     eS     e      S     ee          a
                                      9 RUFOUS STREET GAR PARKING - 20 SPACES                      ©      i)    ©          =                                       =
                                      10. SUNSET VIEWING PLATFORM WITH MOUNT COOROY VISTA 6 &
                                      11 VEWING DECK WITH MOUNT COOLUM & EMU :   .
                                       MOUNTAIN VISTAS                      er  ae
                                      13. PEDESTRIAN LANEWAY           ee       ‘|
                                                  st        >     A    Pome      4                                                                                        1
                                                we               ya
                                             Se b& San                  STERN                ¥  onto wi                Ee
                                      .       ee                    YAY       ©              a                    3

                                       * i ie           \ J -      A 3 \~
                                          mat.                       @                                                          pa
                                             %     %                                            .        \     a    ae        A\ Meas  Se ee 4

                                                >     42> SS
                                               i     Z             —=      i)

            sparks architects ‘KR =      eons ——y oy                    eee rae bea =                      Stage 1 - Proposed Scope of Works            ae                        oa           ia
                                                                                                                  Page 13 of 81
Log in to download the original file

2016-03-01 Infrastructure and Services Committee Agenda(PDF, 11MB).pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.