INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 1 MARCH 2016
with the extra traffic along this road likely to | for the movement of traffic in Rufous Street. The
further contribute to their demise. advice provided about the Rainbow Bee Easters
habitat is noted and will be referred to Council's
environmental officers for comment.
A Library is another suggestion incorporating an | The suggestion for a potential sound library,
IT facility and a sound library, which could be a | being part of the Noosa Library is noted and will
branch of the Noosa Library and a small area set | taken into consideration as a possible use in the
aside as an Historic Township Exhibit. Digital Hub building.
There is not enough consideration for sport and | It is agreed that additional pathways and sport
recreation facilities in the planning of the Rufous | and recreation facilities would be desirable;
Street vicinity and improved bikeways and bike | however the request made is beyond the scale
racks would address both of these areas. There is | of the Master Plan being proposed. If a
a huge, growing population of bike riders who | pedestrian link is provided for from Woodland
could access Peregian Beach along Murdering | Drive in the future then this link will be able to
Creek Road if a) they could cross motorway and | be connected with the proposed pathways in
b) they could park their bikes at Rufous Street. Rufous Street.
Recommendations for Change
It is noted that the majority of the submissions support the proposed Master Plan. It is suggested that
the right balance has been achieved with respect to maintaining open space, providing additional and
practical parking while also providing for innovative development, that being the Digital Hub,
including co-working space. There is also considerable support for the other aspects of the Master
Plan including the proposed play scape, gym equipment, water feature and public art, improved
pedestrian linkages, activation of the Rufous Street Laneway and the new Peregian Beach Community
House with amenities in a central location. The Master Plan as a whole will provide significant
community benefit.
With regard to the comments made in the submissions, the following recommendations have been
made and provided for in the final Master Plan:
e provision of additional carparking in the recreational reserve near the Veggie Village; however
this will need to be provided with Stage 2, given separate approvals will be required from the
State and the cost of providing these carparks will most likely be substantial;
e reduced carparking in Rufous Street with provision of more open space and improved linkages
with the Di Hirst Oval;
e areduced number of pathways within the open space area in Rufous Street;
e improved traffic flow in Rufous Street by simplifying the proposed road design and pathway
network in order to increase the amount of open space, improve traffic safety, reduce cost, but
maintain the turnaround area to reduce unnecessary traffic movements further to the south;
e provision of additional disabled parking, near the Digital Hub building, near the Rufous Street
open space area and near the Laneway, including the necessary ramping in Rufous Street and
the associated carparking areas;
e arevised layout for the proposed Pocket Park with some short term parking, open space with
clearly defined pathways that will improve pedestrian linkages through this shared area;
e removal of the activated frontage component from the property along the northern side of the
Rufous Street Laneway; and
Page 30 of 81See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.