Skip to the record
Accept no imitations.

Original source · versioned page text

2016-03-01 Infrastructure and Services Committee Agenda

of 81

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                1 MARCH 2016


Capital Works Projects

Road repairs at Eumundi Road Resource Recovery Centre
Over the last reporting period Stage One road repairs were successfully completed around the
weighbridge at the entrance to the Eumundi Road Resource Recovery Centre. Stage Two will be
carried out in the 2016-17 financial year.

Shade Cover
A shade cover has now been installed over the mattress processing area used by Briteside staff.

Commissioning of Cell 2.2
Cell 2.2 is a fully lined cell, engineered to contain and collect all generated leachate and
discharge it to sewer. This is fully compliant with Council’s environmental licence and reflects
current best environmental practice to control risks to surrounding ground and surface waters.

At the time of writing WMS officers were preparing to move into Cell 2.2 in the last week of
February. The Cell has been prepared and leachate collection lines have been checked and
serviced to ensure that waste water can be effectively drained to the interconnecting leachate
network at Cell 2.1. A confining layer of general household waste will be laid over the drainage
medium to protect the landfill liner system, while larger “bony” waste will continue to be disposed
of at the currently used Cell 1.1. When the confining layer is completed Cell 2.2 will receive all
waste. Space has been left at Cell 1.1 to receive waste in the case of an emergency (e.g.
cyclone).

2016-17
A comprehensive Capital Works Plan for 2016-17 consisting of seven separate projects has been
prepared by WMS for consideration in the 2016/17 budget process.


2.   CUSTOMERS

Collection Services

Bins in Service                      At 1 January 2016
240 Refuse                           29,907
140 Refuse                           67
240 Recycling                        25,317
240 Garden                           3,983
1m3 Bulk                             29
1100 Refuse                          387
1100 Recycling                       300
1.5m3 Bulk                           201
2m3 Bulk                             17
3m3 Bulk                             241

The main trend of note in bin service numbers is the increased voluntary uptake of green bins
following the recommendations of the Community Jury. There has been a 16% increase over the
last twelve months, with approximately 60 new bins per month being distributed over the last
quarter.




                                                                                    Page 70 of 81
Log in to download the original file

2016-03-01 Infrastructure and Services Committee Agenda(PDF, 11MB).pdf · 11.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.