Original source · versioned page text
RESPONSE TO FURTHER ADVICE.1 -Amended Architectural Plans
1
DA301
SITE BOUNDARY 33.504m 48°32'15"
SETBACK
SETBACK
2460
2460
RL +39900 7443
12656 SETBACK
15.088m 318°32'15"
15.088m 138°32'15"
SETBACK
6438
OPEN PERGOLA SETBACK
LIFT
OVERRUN 1
RL +44400 10983
SITE BOUNDARY
SITE BOUNDARY
DA300
SETBACK
8056
SETBACK
RL +42900
7448
SETBACK
SETBACK
5550
SETBACK
SETBACK
2460
2450
SITE BOUNDARY 33.504m 228°32'15"
DA DOCUMENTATION
DATE REV DESCRIPTION NOTES: Office 1 - 2 / 2460 Gold Coast Hwy, CLIENT: CONSULTANTS: PROJECT: SCALE: DRAWN BY:
Mermaid Beach, QLD
BOTTLEBRUSH
17.04.25 1 DA DOCUMENTATION
16.10.25 2 COUNCIL RFI M: 0407 655 238 STRUCTURE: N/A 1 : 100 @ A3 LB
20.04.26 3 COUNCIL RFI E: [email protected] CIVIL: N/A SHEET NAME:
W: www.studioworkshop.com.au
J. HAINES ELECTRICAL:
MECHANICAL:
N/A
N/A ROOF PLAN
ALL DIMENSIONS TO BE VERIFIED BY BUILDER. ALL WORKS TO COMPLY WITH A.S.1684 AND LOCATION:
FIRE: N/A
23 BOTTLEBRUSH AVE
OTHER RELEVANT CODES. THESE DESIGNS, PLANS, SPECIFICATIONS AND COPYRIGHT
THEREIN ARE THE PROPERTY OF STUDIO WORKSHOP AND MUST NOT BE USED, COPIED OR
REPRODUCED WITHOUT CONSENT. © 2025 HYDRAULIC: N/A JOB NO: DRAWING NO: ISSUE:
ABN 92 603 817 983 Nominated Architect - Chris Knapp | QLD Reg - #5922 | NSW Reg - #11997 CERTIFIER: LATERAL CERTIFICATION GROUP NOOSA HEADS QLD 4567 24-33 DA104 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RESPONSE TO FURTHER ADVICE.1 -Amended Architectural Plans.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.