2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                  General Committee Agenda
                            18 January 2021
                      Attachment 1 to Item 7




Asset Management Plan

Pathways and Boardwalks




                         January 2021
                          Revision 1.0
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 33 sections

Section 2

Table of Contents
1.   Executive Summary................................................................................................................3
2.   Introduction .............................................................................................................................4
     2.1          Asset Management Plan Definition and Purpose .......................................................4
     2.2          Scope ..........................................................................................................................4
     2.3          Pathways and boardwalks ..........................................................................................4
     2.4          Pathways and boardwalks Asset Management Objectives ........................................5
     2.5          Levels of Service ........................................................................................................5
     2.6          Legislative & Standards Requirements .......................................................................5
     2.7          Current Levels of Service ...........................................................................................6
     2.8          Measured Levels of Service .......................................................................................7
     2.9          Future Levels of Service .............................................................................................7
     2.9.1        Hierarchy .......................................................................................................................... 7
     2.9.2        Maintenance Service Levels ............................................................................................ 8
     2.9.3        Defects & Maintenance Activities ..................................................................................... 8
3.   Future Demand .....................................................................................................................11
     3.1          Demand Drivers ........................................................................................................11
     3.2          Demand Impacts on Assets ......................................................................................11
     3.3          Climate Change Adaptation ......................................................................................11
4.   Lifecycle Management Plan .................................................................................................12
     4.1          Assets .......................................................................................................................12
     4.2          Asset Valuation .........................................................................................................12
     4.3          Asset Condition .........................................................................................................12
     4.4          Pathways and boardwalks Operations & Maintenance Plan ....................................16
     4.5          Asset Renewals ........................................................................................................18
     4.6          Capital Upgrades, Expansion and New Assets ........................................................19
     4.7          Capitalisation of Assets ............................................................................................20
     4.8          Disposal and Replacement of Assets .......................................................................20
5.   Risk Management .................................................................................................................21
     5.1          Critical Assets ...........................................................................................................21
     5.2          Risk Assessment ......................................................................................................21
6.   Financial Summary ...............................................................................................................22
     6.1          Financial Statements and Projections ......................................................................22
     6.2          Funding Strategies ....................................................................................................22
     6.3          Budget Forecasts ......................................................................................................22
7.   Plan Improvement and Monitoring ......................................................................................24
     7.1          Status of Asset Management Practices ....................................................................24
     7.2          Improvement Program ..............................................................................................24
     7.3          Monitoring and Review Processes for the Asset Management Plan ........................25
     7.4          Asset Management Effectiveness ............................................................................25

Asset Management Plan: Pathways and Boardwalks                                                                                               Page 1

Section 3

8.    ANNEX A: Levels of Service ...............................................................................................26
9.    ANNEX B: Pathways and Boardwalks Stakeholders .........................................................29
10.   ANNEX C: Document Management .....................................................................................30
11.   ANNEX D: Pathways & Boardwalks Renewal Program .....................................................31
12.   ANNEX E: Pathways & Boardwalks Upgrade & Expansion Program ..............................32




Asset Management Plan: Pathways and Boardwalks                                                                           Page 2

Section 4

1. Executive Summary
Noosa Council is responsible for a diverse and extensive range of community assets which
represents a major investment over many years. To fulfil its objectives in delivering a variety of
services to the community, Council must ensure that the assets supporting these services are
managed in a way that guarantees an optimal balance of cost, risk and performance.

Council’s pathways and boardwalks play a vital role in the services provided to the community across
the Noosa Shire. There is approximately 209km (3,135 segments) of pathway and boardwalk assets
on Council’s financial register considered in this Asset Management Plan (AMP). These assets have
a current replacement value of $67.4m, equating to approximately 6% of Council’s financial assets.

Operational and maintenance activities are fundamental for the ongoing management of the
pathways and boardwalks; it is considered an investment not a liability. The pathways and
boardwalks assets rely on operational and maintenance costs for the serviceability of the assets
identified in this plan. These activities are a significant annual investment that directly influence the
potential for pathways and boardwalks assets to reach its intended service life. The ongoing
development of asset knowledge through asset inspections, improved maintenance activities,
subsequent defect monitoring and repairs are fundamental in developing sustainable intervention
levels for renewals and replacement of pathways and boardwalks assets.

The capital, operational and maintenance expenses for pathways and boardwalks make up
approximately 1.5% of the $94m annual budget. The capital works program fluctuates from year to
year, however, the 2019/20 capital works program the capital investment of $289k for pathways and
boardwalks equates to 1% of the $29.5m capital works program.

The mitigation of risks is fundamental in the management of pathways and boardwalks assets for
Council to make informed decisions. With the focus placed on consistent cyclical inspections across
all pathways and boardwalks and condition data accurately recorded in the Technology One - asset
management system (T1). This will be achieved by reconciling financial asset data, operational data
and inspection data to have a single point of truth for all pathways and boardwalks assets.

This pathways and boardwalks asset management plan (AMP) meets the objectives of the Noosa
Corporate Plan. Key focus areas under the Corporate Plan’s Theme 4: Long term planning for Noosa
Shire – includes: undertaking long term financial sustainability planning identifying asset
management outcomes and establishing functional Asset Management Plans for all Council asset
classes. These focus areas have been a major driver in the development of this AMP. The pathways
and boardwalks AMP provides the relevant information and organisational activities to ensure the
organisational objectives for asset management have been achieved and that the pathway for
continual improvement across all management activities for pathways and boardwalks has been
established. The provision of pathways and boardwalks is, therefore, a significant pillar of the
infrastructure services provided by Council.




Asset Management Plan: Pathways and Boardwalks                                                    Page 3

Section 5

2. Introduction
2.1     Asset Management Plan Definition and Purpose
“Documented information that specifies the activities, resources and timescales required for an
individual asset, or a grouping of assets, to achieve the organisation’s asset management
objectives.”1

The purpose of the pathways and boardwalks asset management plan is to define the whole of life
activities associated with operating and maintaining pathways and boardwalks for the Noosa
Community. The plan identifies the assets and the levels of service to meet the expectations of the
Noosa Community. A key outcome of the asset management plan is the identification of the current
state of the asset conditions and the development of renewal and maintenance plans. Importantly,
the identification of future costs and potential risks to the assets that support the service for operating
pathways and boardwalks is fundamental in achieving the asset management objectives for Noosa
Council.


2.2     Scope
The scope of this asset management plan is to ensure the pathways and boardwalks meets,
demonstrates and incorporates the following key asset management objectives:

•     A description of assets and the services provided;
•     Links to Councils long term financial plan through:
      o     An asset renewal program reflecting Council’s Capital works program.
      o     A maintenance program.
•     Levels of service and demand are identified and determined.
•     The assets are identified with a condition.
•     Life cycle costs are addressed.
•     Long-term cash-flow requirements are forecasted for asset renewals, maintenance and
      operations.
•     Asset rationalisation and disposal is addressed.
•     The risk management activities associated with the pathways and boardwalks.


2.3     Pathways and boardwalks
There are many different asset types within the pathways and boardwalks asset management plan,
with various units and components of measurement. The assets included in this AMP are
summarised below:

o   Pathways
o   Boardwalks
o   Stairs

Pathways and boardwalks assets are vital assets to the variety of services provided across the
Noosa Shire. This asset management plan (AMP) consolidates Councils available data and analysis
on the Pathways and boardwalks assets. It also presents the output of how systematic approaches
are applied by Council to optimally balance cost, risk and performance. This is essential to meet
forecasted demand and the levels of service required.


1 ISO 55000:2014 (3.3.3) Asset Management – Overview, principles and terminology

Asset Management Plan: Pathways and Boardwalks                                                     Page 4

Section 6

2.4    Pathways and boardwalks Asset Management Objectives
The AM objectives detailed in the AMP include:
•    A consolidated asset register that identifies:
     o     Asset description;
     o     Asset condition;
     o     Useful life and renewal dates; and
     o     Replacement costs.
•    The levels of service provided by pathways and boardwalks to the Noosa Community;
•    Current and future maintenance expenditure;
•    Identifying any future demand forecasts for the pathways and boardwalks;
•    Identifying any legislative considerations necessary in the management of the pathways and
     boardwalks;
•    Documenting the financial forecasts for the pathways and boardwalks;
•    Identifying all risks and opportunities related to management of the pathways and boardwalks;
     and
•    Documentation of any future actions identified to improve the asset management objectives of
     the pathways and boardwalks.



2.5    Levels of Service
The levels of service that are currently being maintained for Council’s pathways and boardwalks are
aligned to the Corporate Plan and Branch Plan objectives. The continuous development and
implementation of the asset management objectives that include good asset governance and asset
knowledge are also aligned to the Corporate Plan objectives. The service delivery is provided
internally with external specialists and technical consultants engaged as required.

Any changes in the levels of service to the pathways and boardwalks will be required to demonstrate
the benefit and be approved by Council. Changes in levels of service should be addressed through
the asset management governance framework prior to the approval by Council.



2.6    Legislative & Standards Requirements
The legislative and Standards requirements relative to pathways and boardwalks are:
•     Building Act 1975
•     Disability Discrimination Act (Commonwealth) 1991
•     National Construction Code 2015
•     The National Construction Code of Australia (NCC)
•     Coastal Protection & Management Act
•     Queensland Heritage Act
•     Nature Conservation Act
•     Aboriginal Cultural Heritage Act
•     Workplace Health and Safety Act




Asset Management Plan: Pathways and Boardwalks                                              Page 5

Section 7

2.7    Current Levels of Service
The current levels of service for pathways and boardwalks is to support the services that are
operated from or within these assets to the Noosa community. Council’s pathways and boardwalks
assets are designed and constructed to suit the function of the service being provided which
determines the levels of service. The overall management of Council’s pathways and boardwalks
are in accordance with the Building Act 1975 and the various Codes of Practice and Australian
Standards that support the specific asset types of the pathways and boardwalks.

Regular inspections are critical to the management of pathways and boardwalks and the inspections
undertaken by Council, and by third party providers will meet the standards and statutory
requirements to ensure all assets remain safe to all users of Council’s pathways and boardwalks.
The scheduled maintenance activities will be within the defined timeframes to ensure that all potential
or identified defects are rectified.

Levels of service must be readily measurable and preferably from available data sources. Each level
of service should be stated in terms of appropriateness and understood by the community for whom
the service is provided. The levels of service in this AMP are intended to:

   Measure of the effectiveness of this AMP;
   Inform the Noosa community of the proposed type and level of service to be offered by Council;
   Assist with identification of the expenditure and benefits of the Noosa Council services being
    offered;
   Inform the Noosa community to assess the affordability and suitability of the Noosa Council
    services being offered;
   Provide focus for the development of future pathways and boardwalks asset management
    strategies;
   Provide guidance for current and future services to be offered; and
   Define the specific levels of service provided by Noosa Council.

The levels of service outlined in this pathways and boardwalks AMP are also aligned to:
 Statutory, legislative and relevant code requirements.
 Information obtained from asset condition assessments and maintenance analysis; and
 Noosa Council’s Corporate Plan.

The current levels of service for Council’s pathways and boardwalks have been defined at Annex A.
It is recommended that the future detailed asset management plans will provide this information
against the specific pathways and boardwalks.




Asset Management Plan: Pathways and Boardwalks                                                  Page 6

Section 8

2.8     Measured Levels of Service
To demonstrate the levels of service of the pathways and boardwalks assets, Noosa Council
undertook an exercise to define the service outputs for the significant services that the pathways and
boardwalks assets support against the Community level of service and the Technical level of service
criteria.
 Community LOS – relates to how the community receives the service in terms of safety, quality,
     quantity, reliability responsiveness, cost efficiency and legislative compliance; and
 Technical LOS – are the technical measures of performance developed to ensure the minimum
     community levels of service are achieved?

These service outputs are tabled at Annex A. The service output documents are to be utilised to
inform responsible staff of their obligations in maintaining the current levels of service. When targets
are not achieved, they should be escalated and reported through the Asset Management
Governance Framework. Further development of levels of service across all pathways and
boardwalks assets is required and has been identified as an improvement initiative within this
document.



2.9     Future Levels of Service
Ongoing development of the levels of service for maintenance and inspections has been undertaken
with the development focused on a hierarchy criteria approach. Each asset is assigned a hierarchy
level based on the specific criteria and the ongoing level of service is determined based on this
hierarchy level. The future levels of service will be incorporated within the 2021/22 pathways and
boardwalks service catalogue, that is reviewed as part of the annual budget process.
2.9.1 Hierarchy
The Pathway and Boardwalk network has been classified in accordance with the service it provides.
This classification covers the entire pathway network including boardwalks, stairs and footbridges.
The hierarchy applies to all new and existing erected permanent and temporary pathways wholly or
partly controlled by council.

  Hierarchy
                 Criteria Description
  Level
                 Highly significant, heritage or cultural reasons
                 Serves wider community including beyond Noosa region (Visitors)
      Level 1    Used extensively every day of the week
                 Community expects high standards of maintenance
                 Zoned Shared with Bikes, Pedestrians and Mobility Transport
                 Noosa Heritage significant
                 Serves Noosa region community
      Level 2    Used frequently most days of each week
                 Community expects reasonable standards of maintenance
                 Not Zoned Shared with Bikes, Pedestrians and Mobility Transport
                 Serves the community within a town or suburb
      Level 3    Used several times each week
                 Community expects pathways to be safe and presentable
                 Serves a local neighbourhood
      Level 4
                 Infrequent use each week




Asset Management Plan: Pathways and Boardwalks                                                   Page 7

Section 9

   2.9.2 Maintenance Service Levels
   The table below defines the frequency times based on Councils normal hours of work to respond to
   particular maintenance criteria.
                                                                       Hierarchy Frequency Times
                                                   Level 1            Level 2            Level 3               Level 4
 Inspections
 Defect Inspections                               2 months          4 months            6 months               Yearly
 Condition Assessments                            3-5 years          3-5 years          3-5 years             3-5 years
 Programmed Maintenance Category
 Trip Hazards – urgent (>30mm)                    24 hours           24 hours           48 hours              48 hours
 Trip Hazards – high (>20mm <=30mm)               2 weeks            2 weeks            1 month              2 months
 Trip Hazards – med (>10mm <=20mm)                1 month            1 month            2 months          As budget allows
 Trip Hazards – low (>5mm <=10mm)                 2 months          3 months        As budget allows      As budget allows
 Slippery Surface                                 48 hours           2 weeks            4 weeks               8 weeks
 Uneven/broken Path – Non trip hazard             4 weeks           3 months        As budget allows      As budget allows
 Overhanging/Overgrown Vegetation                 2 weeks           2 Months            6 Months          As Budget Allows
 Fallen Tree - Urgent                             24 hours           24 hours           48 hours              48 hours
 Root Intrusion (for prevention of damage)         1 year             1 year             2 years              2 years
 Graffiti/Vandalism (offensive)                    1 day              1 days             2 days               1weeks
 Graffiti/Vandalism (non-offensive)                2 days             2 days        As budget allows      As budget allows
 Missing Sections (< 10m² eg. Random              4 weeks           3 months        As budget allows      As budget allows
 Panels, Pavers, Tiles) – Non trip hazard
 Missing Tactiles                                 3 months          6 months             1 year                1 year



   2.9.3 Defects & Maintenance Activities
   The below table identifies the common defects on pathways and boardwalks with maintenance
   activity and risk mitigation. This table will support how inspections are developed, how defects are
   rectified and how risks to these assets are mitigated.

    Damage Defect              Programmed                    Maintenance Activity                     Risk Mitigation
        (DEFDG)            Maintenance Category                                                    (Short Term response)
      Defect Type
Vertical Displacement     All Trip Hazards          Grinding/Patching                     Make path safe via typical Traffic
                                                                                          Control devices
Crack                     All Trip Hazards          Clean out & Fill with appropriate     Make path safe via typical Traffic
                          Uneven / broken           crack sealant, Consider area for      Control devices
                          Tree root intrusion       replacement
Hole                      All Trip Hazards          Square up edges, clean and fill       Make path safe via typical Traffic
                          Uneven / broken           with appropriate material,            Control devices AND/OR patch with
                                                    consider area for replacement         quarry or premixed product
Edge-break                All Trip Hazards          Edge repair as required with          Make path safe via typical Traffic
                          Uneven / broken           suitable material                     Control devices AND/OR remove
                          Missing sections                                                material and reinstate temporarily
Edge drop                 All Trip Hazards          For localised sections prepare        Make path safe via typical Traffic
                          Missing sections          adjacent surface for placement        Control devices AND/OR place
                                                    and compaction of suitable fill       suitable fill material to reduce risk
                                                    material                              of injury. Assess extent of edge
                                                                                          drop-off for reinstatement
   Damage Defect               Programmed                    Maintenance Activity                     Risk Mitigation
     (DEFDG)               Maintenance Category                                                  (Short Term response)


   Asset Management Plan: Pathways and Boardwalks                                                                  Page 8

Section 10

     Defect Type
Broken                   All Trip Hazards       For Localised sections – Remove,   Make path safe via typical Traffic
                         Uneven / broken        square up edges and replace        Control devices AND/OR remove
                         Tree root intrusion                                       loose material and patch if
                                                                                   required.
Uneven/Shoving/          All Trip Hazards       For Localised sections – Remove    Make path safe via typical Traffic
Corrugation              Uneven / broken        affected section, remove the       Control devices AND/OR identify
                         Tree root intrusion    cause & replace                    the cause and prioritise for
                                                                                   replacement
Erosion                  All Trip Hazards       Determine extent and cause.        Make path safe via typical Traffic
                         Missing section        Replace eroded support material    Control devices AND/OR fill
                         Slippery surface       and reshape adjacent ground        affected area with suitable material
                         Uneven / broken        where possible. Could it be a      and investigate the cause to
                                                design issue?                      determine preventative
                                                                                   maintenance solutions
Subsidence               All Trip Hazards       Fix/Fill/Stabilise foundation of   Close pathway to pedestrian traffic
                         Missing section        pathway                            with signage and diversion
                         Slippery surface
                         Uneven / broken
Burnt/Melted/            All Trip Hazards       Repair/replace components          Make path/components safe until a
Corrosion                Missing section                                           long term solution is achieved
                         Uneven / broken
Rotten/Split/            All Trip Hazards       Wooden defects, Bridge crew        Make path safe via typical Traffic
Splintering              Missing section        maintenance. Sanding/turning       Control devices AND/OR identify
                         Uneven / broken        boards or replacing                the cause and prioritise for
                                                                                   replacement
Slip Hazard              Slippery surface       Available activities include       Make path safe via typical Traffic
                                                - Pressure cleaning                Control devices AND/OR Identify
                                                - Sweeping                         the contaminant and possible
                                                - Cover with absorbent product     source, remove hazard by
                                                and remove                         sweeping or spreading suitable
                                                                                   cover material and monitor for
                                                                                   recurrence
Spillage                 Slippery surface       Spill kit, clean and remove to     Make path safe via typical Traffic
                                                avoid environment issues           Control devices AND/OR Identify
                                                                                   the contaminant and possible
                                                                                   source, remove hazard by
                                                                                   spreading suitable cover material
                                                                                   and monitor for recurrence
Dirty/Cleaning           Slippery surface       Remove silt with hand tools/       Make path safe via typical Traffic
Required                                        machines, improve drainage and     Control devices AND/OR identify
                                                sweep loose materials              the cause and prioritise for
                                                                                   treatment
Blocked/Obstructed       All Trip Hazards       Remove blockage/                   Vehicles blocking pathways on
                                                obstruction                        council road reserve contact local
                                                                                   laws
Painting/Sealing         Slippery surface       Usually wooden defects, Bridge     Identify the issue and prioritise for
Required                                        crew                               treatment
Loose/Unstable           All Trip hazards       Replace, fix or remove loose and   Make path safe via typical Traffic
Component                Uneven / broken        unstable components                Control devices AND/OR identify
                                                                                   the cause and prioritise for
                                                                                   replacement
All Graffiti/Vandalism   Graffiti / vandalism   Remove or recoat                   Paint over/cover asap if offensive
All missing              trip hazard            Replace component                  Make path safe via typical Traffic
components               uneven / broken                                           Control devices AND/OR identify
                         missing sections                                          the cause and prioritise for
                                                                                   replacement



    Asset Management Plan: Pathways and Boardwalks                                                          Page 9

Section 11

  Vegetation Defect     Programmed               Maintenance Activity                        Risk Mitigation
       (DEFVG)          Maintenance Category                                       (Short Term response)
Defect Type
Overhanging Trees/      Overhanging/overgrown    Parks & Gardens, tree trimming/   Make path safe via typical Traffic
Overgrown Vegetation    vegetation               Pruning/weeding/spraying          Control devices AND/OR Identify
                                                                                   the size and source, remove hazard
                                                                                   using appropriate means and if
                                                                                   safe to do so
Root intrusion          Root intrusion causing   Inspect for removal               Identify and report
                        defects
Fallen tree/Dead wood   Fallen tree              Parks & Gardens, tree trimming/   Make path safe via typical Traffic
hazard                                           pruning                           Control devices AND/OR Identify
                                                                                   the size and source, remove hazard
                                                                                   using appropriate means and if
                                                                                   safe to do so




   Asset Management Plan: Pathways and Boardwalks                                                        Page 10

Section 12

3. Future Demand
3.1    Demand Drivers
There is currently an inconsistent approach of demand management applied to the management of
the pathways and boardwalks through the monitoring of the asset conditions, changes in the service
delivery and usage levels. Increases in patronage and operational changes are key demand drivers
on the current and future levels of serviceability for pathways and boardwalks. Significant changes
in the services provided and the monitoring of these activities should act as an indicator to reviewing
demand management for a specific building and facility. It is Council Policy that any change in the
level of service due to demand is reported to Council in accordance with current guidelines and
practices.

The major drivers of capital upgrade for pathways and boardwalks will be:
 external funding opportunities to improve the current levels of service,
 risk management – including safety and compliance,
 changes in usage levels,
 climate change adaptation,
 re-purposing of a facility,
 changes in technologies,
 Impacts on operational and maintenance activities.

The regular pathways and boardwalks inspection programs will act as a trigger for any need to
improve on preventative maintenance activities to preserve the life of the assets.

In addition, the development of programs such as establishing the guiding principles for upgrading,
new or renewing pathways and boardwalks and specific strategies such as the cycling and walking
strategy and transport strategy will determine the priority of upgrade works required on these assets
into the future.
3.2    Demand Impacts on Assets
Impacts affecting demand include changes in demographics, seasonal factors, consumer
preferences and expectations, technological changes, economic factors, environmental awareness,
legislation changes, and historical importance. Council will respond to demand for new services by
ensuring that a combination of managing existing assets (including upgrades/renewals of
components) and by providing new assets to meet these current and predicted future demands. The
development of the Noosa Council Cycling and Walking Strategy combined with the overarching
Transport Strategy will be fundamental in identifying demand impacts on the pathways and
boardwalk network.

Other operational demand impacts on pathways and boardwalks relate to periods of scheduled
closures for asset repairs/refurbishment or maintenance works. These scheduled activities should
ideally be undertaken outside of the peak demand periods where patronage of these assets is most
prevalent. Where practical, after-hour works for scheduled maintenance and capital works may be
necessary to reduce the impacts on the services these assets support.
3.3    Climate Change Adaptation
Climate Change Adaptation initiatives will be another demand driver that will affect assets that are
located in coastal and foreshore areas. Consideration for tidal surge, rising sea levels and erosion
must be taken into consideration for future upgrades for those affected assets. Those assets can be
identified in the new coastal hazard layers created as part of Council’s development of a Climate
Change Adaptation Plan and viewed on Intramaps. They are located in the Development
Assessment module, under the ‘Coastal Hazards’ folder. Consultation with Council’s Program
Coordinator - Climate Change Adaptation should be undertaken for any assets within these zones.

Asset Management Plan: Pathways and Boardwalks                                                 Page 11

Section 13

4. Lifecycle Management Plan
4.1    Assets
Council’s pathways and boardwalks plays a vital role in the services provided to connecting the
community across the Noosa Shire. There are a number of different asset types within the pathways
and boardwalks asset management plan, with various units of measurement.

These assets included in this AMP are summarised below:

o   Pathways
o   Boardwalks
o   Stairs


4.2    Asset Valuation
The value of the pathways and boardwalks Assets, at the end of the financial year 2017/2018 for the
purposes of this AMP is summarised below.

                                                                           Pathways and
 Asset Values at 2017/18                                                    boardwalks
 Current replacement cost                                                        $67,411,419
 Depreciable amount                                                              $14,949,687
 Depreciated replacement cost                                                    $52,461,732
 Annual depreciation expense                                                      $1,127,943

Table 1: Pathways and boardwalks Asset Valuation


4.3    Asset Condition
Levels of service and asset management decision making is directly linked to asset condition; this
determines what condition the asset should be in before an asset management intervention. The
intent of current and future Condition Assessments (CA) is to:
•     Provide a robust and repeatable process for carrying out condition assessments on Council’s
      pathways and boardwalks assets;
•     Use condition assessments to develop programs for intervention with regards to further
      inspection, monitoring, maintenance and renewals;
•     Provide a basis for information for the modelling of condition data for likelihood of asset failure
      for those assets not inspected.

A consistent condition ranking scale has been chosen by Council as the framework for measuring
pathways and boardwalks assets, based on the 1 to 5 ranking according to the International
Infrastructure Management Manual (IIMM). Any asset scoring 4 (fair) to 5 (poor) will be considered
and prioritised under an asset specific renewal program.

Condition assessments will be undertaken by internal staff and are planned to commence throughout
the 2020/21 financial year. The data collected will be utilised to create a renewal program. Condition
assessments are cyclic and are proposed to be staged across a 3-5year period based on the
hierarchy of the assets, to cover all of Council’s pathways and boardwalks to ensure the continued
development and priorities of the renewal programs.



Asset Management Plan: Pathways and Boardwalks                                                  Page 12

Section 14

In addition to the above condition assessments, Council staff undertake visual condition
assessments for requests that have been reported for assets in poor condition. These assessments
are undertaken on a “reactive” approach to determine if the request warrants the need for future
renewals.

The majority of asset classes within the pathways and boardwalks have not had a physical condition
assessment undertaken on them. For the purpose of this AMP, the assets that have not had physical
condition assessments, the condition has been assigned as an age-based condition which is
determined on the remaining useful life of the asset and is referred to as the “modelled condition”.

Ongoing development and prioritisation will ensure that all pathways and boardwalks assets are
reconciled within the asset system and condition assessments are undertaken. When undertaking
condition assessments, the asset attributes are updated prior to the next asset evaluation. The
condition assessments will enable the development of renewal programs for the specific assets.

In the development of the asset system and the inspection program, there is a number of pathway
and boardwalk assets that have been discovered and are yet to be commissioned on Council’s
financial asset register. These assets are currently being commissioned through the Asset Data
Management project and are being prioritised against other asset data management activities within
the project. There is approximately a further 20% of assets within the pathways and boardwalks
asset class to be commissioned onto the asset financial register, totalling approximately 48
kilometres of pathway and boardwalks.

In asset reporting an approach to componentisation of the assets to the specific asset class has
been undertaken. This breakdown and componentisation of assets to this level is in accordance with
the financial asset standards and enables more detailed condition information at the component
level. These components are detailed below and reported consistently throughout the AMP:

   Pathways
   Boardwalks
   Stairs

Figure 1 details the total number of assets by both physical condition and modelled conditions that
have been commissioned on our financial asset register. Any pathways and boardwalks assets that
have reached condition 5 will be included in the relevant renewal programs of the 10-year Capital
Works Program. Pathways and boardwalks assets have a modelled condition based on their
remaining life and does not reflect the physical condition of those assets. Undertaking physical
condition assessments of the assets is programed to commence throughout the 2020/21 financial
year. Physical condition knowledge will assist in developing a more realistic approach to developing
renewal plans that are prioritised and planned. This information is utilised in prioritising the physical
condition assessments.




Asset Management Plan: Pathways and Boardwalks                                                  Page 13

Section 15

Figure 1: Total Condition by Number of Pathway & Boardwalk Assets

The graph above highlights that the majority of our assets are in a good to very good condition based
on their age. There is only a small quantity of assets that are condition 3 – 5 and these assets will
be prioritised for physical condition assessments in the near future to determine if the asset is
maintaining the level of service.




Figure 2: Condition of Pathways & Boardwalks by Hierarchy

Figure 2 provides a breakdown of the condition by hierarchy. The not applicable category refers to
those assets that are yet to be assigned a Hierarchy. The graph below enables us to prioritise where
our inspections should be focused on in the short to medium term. In addition, this information is
utilised in determining priority for developing robust asset renewal programs.



Asset Management Plan: Pathways and Boardwalks                                               Page 14

Section 16

Figure 3: Pathways and boardwalk Values by Hierarchy

Figure 3 identifies all pathways and boardwalks asset values by hierarchy and condition. The graph
highlights that the highest value assets are in good condition. Undertaking physical condition
assessments of the assets is required. Physical condition knowledge will assist in developing a more
realistic approach to developing renewal plans that are prioritised and planned. This information is
utilised in prioritising the physical condition assessments.




Figure 4: Pathway and boardwalk by network value

Figure 4 identifies the assets and the relevant value of each condition. The significance of the graph
below is that there is a very low value of assets in a poor condition and a very high value of our
assets in a very good condition. Those assets that have been identified as conditions 4 or 5 will be
identified for renewal in the 10-year Capital Works Program. The continued approach to having good
sustainable asset renewal interventions will ensure this level of condition is achieved across future
generations.

Asset Management Plan: Pathways and Boardwalks                                                Page 15

Section 17

The current condition is based on the remaining life of the asset. It is recommended to reconcile this
asset information and undertake physical condition inspections to develop a suitable renewal
program for these assets. The development of these renewal programs for each asset class is
essential in further improving the 10-year Capital Works Program.




4.4     Pathways and boardwalks Operations & Maintenance Plan
Operational and maintenance activities are fundamental for the ongoing management of the
pathways and boardwalks; it is considered an investment rather than a liability. The pathways and
boardwalks assets rely on operational and maintenance costs for the serviceability of the assets
identified in this plan. These activities are a significant annual investment that directly influence the
potential for pathways and boardwalks assets to reach their intended service life. The ongoing
development of asset knowledge through asset inspections, improved maintenance activities,
subsequent defect monitoring and repairs are fundamental in developing sustainable intervention
levels for renewals and replacement of pathways and boardwalks assets.


          Budget         Forecast        Forecast       Forecast         Forecast        Forecast
 Year     2017/18        2018/19         2019/20        2020/21          2021/22         2022/23
 O&M      $845,002        $862,085       $986,529       $1,006,259       $1,026,384      $1,046,912

          Forecast       Forecast        Forecast         Forecast       Forecast         Forecast
 Year     2023/24        2024/25         2025/26          2026/27        2027/28          2028/29
 O&M       $1,067,850     $1,089,207     $1,110,992       $1,133,211      $1,155,876      $1,178,993

Table 2: Annual Operational & Maintenance Costs across pathways and boardwalks

Maintenance and operational costs are identified to ensure council understands the whole of life
costs associated with the day-to-day management of pathways and boardwalks assets. Figures 5 &
5 below, identifies the long term financial commitment required in operating and maintaining pathway
and boardwalk assets. In order to maintain assets to an acceptable level, the cumulative costs over
a ten-year period will equate to $14.2m.




Asset Management Plan: Pathways and Boardwalks                                                  Page 16

Section 18

Figure 5: Pathways and Boardwalks Operating Costs & Forecast




Figure 6: Pathways and Boardwalks Maintenance Costs & Forecast

It is proposed to develop a more detailed list of operational and maintenance activities per annum
by service program and utilises the T1 asset management system to identify maintenance by the
breakdown of asset classes and hierarchy within the pathways and boardwalks asset classes. In
addition, more detailed and longer term planning for operations and maintenance has been identified
as an improvement from this AMP.



Asset Management Plan: Pathways and Boardwalks                                             Page 17

Section 19

4.5    Asset Renewals
The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain
the current level of service. Asset failure due to lack of renewal will affect the capacity to deliver
future renewals of pathways and boardwalks and subsequently the service these assets provide to
the Noosa Community.

Pathways and boardwalks asset renewals are condition based. Condition assessments provide staff
the ability to develop capital renewal programs. The ongoing asset management maturity relies
heavily on the continued development of the condition assessments and subsequent implementation
of maintenance and renewal plans.

Renewal expenditure is work which does not increase the pathways and boardwalks design capacity
but restores, rehabilitates, replaces or renews an existing asset to its original service capacity.
Improved condition assessment data capture is currently being developed to include asset renewal
considerations based on physical conditions and estimates of remaining useful life of assets to guide
and improve renewal programs. Renewal plans are developed to maintain levels of service to ensure
assets achieve their optimal useful life before they reach the asset condition range of 5. Staff
continue to work through the various asset classes to develop renewal programs for the specific
asset classes.

As previously stated - In the absence of condition data, an age-based approach to identify when
Council’s pathways and boardwalks will reach their useful life has been developed to determine an
overall renewal plan. Priority is required across all the assets classes that have not had physical
condition assessments to develop a suite of renewal programs.

The graph below depicts the past and planned renewals by capital program including the next 10
years. There are major renewals planned for Boardwalks in 2024 and ongoing renewals across
pathways across the span of the 10 years. It is expected that through ongoing and detailed physical
condition assessments that more defined renewals will replace the traditional “bucket” allocations
that are currently identified and replaced with asset specific renewal programs within the 10-year
capital works program.

As the pathways and boardwalks assets age, continued condition assessments are required to
monitor the assets deterioration profiles and will produce the more defined renewal plans. The graph
below enables Council to identify and plan for these significant renewal activities for the next 10
years.




Figure 7: Pathways and boardwalks Asset Renewal Costs

Asset Management Plan: Pathways and Boardwalks                                                Page 18

Section 20

4.6    Capital Upgrades, Expansion and New Assets
There is a need to develop more maturity in the overall assessment and management of our
pathways and boardwalks assets before there is a consideration for further upgrades and expansion
of the pathways and boardwalks assets. Changes in demographics, increased patronage, cost
benefits, sustainability, environmental impacts and overall community benefit are key indicators
when planning for capital upgrades and new pathways and boardwalk assets.

The graph below identifies the 2018/2019 financial year as the most significant investment for
upgrade and expansion projects for the next 10 years. These works related to the completion of the
iconic Park Road Boardwalk at Noosa Main Beach. This project is a good indication of the
commitment from Council to further develop the services it provides to the community as well as
promote future economic development to the tourism and business sectors in the provision of such
an iconic piece of infrastructure.




Figure 8: Pathways and boardwalks proposed upgrades Costs


The development/implementation of the Transport Strategy and the Walking and Cycling Strategy
will be fundamental in the ongoing development of the upgrade program. As a result, it is anticipated
there will be more upgrades required into the future development of the 10-year capital program for
the pathways and boardwalk network. The development of the Walking and Cycling Strategy will
further improve the priority of upgrades, expansions and new pathway and boardwalk infrastructure
and enable greater planning and potential for obtaining external funding opportunities. Once the
Walking and Cycling Strategy is adopted by Council this plan will be updated to reflect the projects
identified within the strategy to ensure the AMP and the Walking and Cycling Strategy remain
aligned.




Asset Management Plan: Pathways and Boardwalks                                               Page 19

Section 21

4.7    Capitalisation of Assets
All new and renewed assets will be acquired and commissioned in accordance with the Noosa
Council Capital Delivery Framework.


4.8    Disposal and Replacement of Assets
Disposal of assets will be consistent with statutory and regulatory requirements. The replacement
of assets will be driven from the condition assessments.

The disposal and commissioning of assets from the asset register is undertaken in the capitalisation
and asset write-on/off process. This process is being delivered via the Asset Management Branch
and Finance Branch.




Asset Management Plan: Pathways and Boardwalks                                              Page 20

Section 22

5. Risk Management
Risk management is a coordinated approach to the management and control of risk by Noosa
Council.


5.1    Critical Assets
The identification of critical assets based on the consequence of failure multiplied by the likelihood
of failure; as adapted from the International Infrastructure Manual 2015 Section 3.2.4 has been
undertaken to enable the prioritization of asset management and financial resources. Pathways
and boardwalks are a critical asset class to the Noosa Community and has significant asset value
on Council’s asset register. The management of Council’s pathways and boardwalks assets should
continue to be prioritised to ensure any significant risks are mitigated before they escalate further
and impact on the Community.


5.2    Risk Assessment
It is important to have a good understanding of the risks associated with the operation of the
pathways and boardwalks assets. Council continues to develop its pathways and boardwalks
management activities to ensure that the pathways and boardwalks are meeting the intended design
life, and where necessary work on the optimised intervention for undertaking rehabilitation and
renewal activities.

The key risks associated with achieving the above objectives of Council’s pathways and boardwalks
management activities and associated levels of service have been identified throughout this AMP
and are outlined below:

1.    Unanticipated asset deterioration and structural failure possibly accelerated by the increasing
      severity in weather and climate change conditions;
2.    Asset Performance – No asset failures that influence the service levels. A complete
      understanding of all pathways and boardwalks assets and their relevant asset condition will
      assist in mitigating potential risks.
3.    Asset Knowledge - The need to understand the performance of all the assets at component
      level is essential in mitigating risks. Assets such boardwalks, pathways, lighting and signage
      are assets that require more detailed inspections and improved maintenance activities to
      ensure assets do not become a risk to the community.
4.    Funding – the ongoing operational and maintenance costs for pathways and boardwalks will
      continue to rise and efficiencies and cost savings are reviewed regularly. Grant opportunities
      for renewals/upgrades must always be considered.

These risks and all other current risks will be regularly reviewed and if necessary, they can be
documented in the annual Branch Plan. Should there be a need for them to be further escalated they
can be addressed for consideration by the Asset Management Working Group, Executive Team, and
Audit and Risk Committee.

To mitigate these risks there are resulting actions from this AMP. For Council to make informed
decisions, it is understood that focus must be placed on consistent cyclical inspections across all
pathways and boardwalks assets with condition data accurately recorded in T1 asset management
system. This then supports the reconciling of financial asset data, GIS data and inspection data to
have a single point of truth for all pathways and boardwalks assets.




Asset Management Plan: Pathways and Boardwalks                                                Page 21

Section 23

6. Financial Summary
6.1    Financial Statements and Projections
Council’s pathways and boardwalks play a vital role in the services provided to the community across
the Noosa Shire. There is approximately 209km (3,135 segments) of pathway and boardwalk assets
on Council’s financial register considered in this Asset Management Plan (AMP). These assets have
a current replacement value of $67.4m, equating to approximately 6% of Council’s financial assets.

The capital, operational and maintenance expenses for pathways and boardwalks make up
approximately 1.5% of the $94m annual budget. The capital works program fluctuates from year to
year, however, the 2019/20 capital works program the capital investment of $289k for pathways and
boardwalks equates to 1% of the $29.5m capital works program.

The annual operating plan details the financial statements and projections associated with the
operational and maintenance expenses for the services the pathways and boardwalks support on
an annual basis. The capital investments including renewals, upgrades and expansions are
highlighted in the annual capital works program which is reflected in the 10-year capital works
program.


6.2    Funding Strategies
The immediate improvements to funding requests for maintenance and renewals in the budget
process are now evidence based and are supported from the condition assessments that have been
carried out.

The funding strategy, key assumptions, reliability and confidence levels are detailed in the Council’s
long-term financial plan. More detailed funding strategies that promote the long-term sustainability
of the pathways and boardwalks will be further developed and defined in future asset management
plans.


6.3    Budget Forecasts
Budget forecasts will continue to be developed as information is captured and reported from the
Technology One (T1) financial system. Through the annual review of actuals, maintenance and
renewal activities against budget will initiate further development and identify trends that are
reportable and reflect future year forecasts. The development of the Walking and Cycling Strategy
will impact the current budget forecast within the AMP, based on the proposed upgrades, expansions
and new pathway and boardwalk infrastructure identified within the strategy. When the Walking and
Cycling Strategy is adopted by Council this plan and the budget forecast will be updated to ensure
the AMP and the Walking and Cycling Strategy remain aligned.

Figure 9 below identifies the current forecasts for the operational, maintenance upgrade and renewal
expenses to demonstrate the whole of life costs over a 10-year period for the pathways and
boardwalks by program, in the amount of $32.3m. There will be further asset renewal, upgrades and
maintenance activities to be developed over coming years that will influence this current forecast.
To achieve good asset knowledge of all pathways and boardwalks assets it is important to continue
with undertaking asset data reconciliation and physical condition assessments to make well informed
asset decisions.

The pathways and boardwalks assets have varying useful lives for the asset classes maintained by
Council. The pathways and boardwalks useful lives vary, based on construction, material type and
have estimated lives between 10 – 60 years.



Asset Management Plan: Pathways and Boardwalks                                                Page 22

Section 24

Figure 9: Pathways and Boardwalks 10-Year forecasted expenditures


Development of ongoing maintenance activities will ensure that future asset failure will be minimised
with a “no-surprises” approach for future funding forecasts. This will be supported through the initial
development of condition monitoring to predict potential maintenance and renewal requirements. In
compiling the current forecasts the following general assumptions have been identified.

•     Proposed Capital Renewal Program will be funded in accordance with the current Council
      model adopted;
•     Renewal works will be prioritised according to asset condition;
•     The condition of the assets reflect what is reported within this document;
•     Current maintenance funding levels will meet service level requirements;
•     Renewals, maintenance and isolated failure replacement is generally ‘like for like’;
•     Where a renewal must be provided to a higher standard, the difference in cost between a ‘like
      for like’ renewal and the higher standard is to be treated as an asset upgrade.
•     Depreciation is in accordance with Council Policy;
•     There is no allowance for CPI as the continuing revaluation and condition inspection process
      will make adjustments for current rates.




Asset Management Plan: Pathways and Boardwalks                                                 Page 23

Section 25

7. Plan Improvement and Monitoring
7.1    Status of Asset Management Practices
Currently all Asset Management activities are managed within the Noosa Council Asset
Management Governance Framework and enabled through Technology One (T1) asset information
management system. The establishment of a pathways and boardwalks working group will enable
the improvement program to set priorities and targets that are aligned to Council.


7.2    Improvement Program
The following initiatives are recommended:

1.    Asset Inventory – Ensure that there is one single asset register/hierarchy that captures all
      pathway and boardwalk assets; at a level of the lowest or appropriate repairable unit. All other
      duplicated asset lists/registers should be eliminated. T1 is the Enterprise Asset Management
      repository. Prior to the revaluation, it is recommended a detailed asset register and data
      reconciliation project establishes a single point of truth for asset data within T1. There is
      approximately 49km of pathway and boardwalks that have been captured that still requires to
      be commissioned onto the financial asset register.
2.    Asset Responsibility – Infrastructure Services Director is responsible for the pathways and
      boardwalks. However the asset managers are various across pathways and boardwalk assets
      due to the different locations and the structures and materials of the pathway and boardwalk
      assets. A detailed Asset responsibility matrix is required and will be developed over coming
      months by the pathways and boardwalks working group and is expected to be completed by
      February 2021.
3.    Condition Assessments – Condition assessments have commenced and whilst there is good
      knowledge of the defects of these assets there is no condition ratings on these assets. A
      consistent inspection regime combined with consistent condition scoring will enable the
      development of renewal plans and programs.
4.    Renewal Plans - The establishment of renewal plans for all assets considered in this AMP is
      considered essential to achieving good asset management outcomes. Renewal plans are
      based on understanding the condition of Council’s assets and modelling to ensure that the
      intervention for renewal achieves the assets useful life. The establishment and review of these
      renewal plans will be a focus for the Pathways and Boardwalks Working Group to develop and
      implement into Council’s processes and procedures.
5.    Capital Planning – The development of upgrade programs will support maintaining the levels
      of service and expectations of the community. Further renewal and upgrade programs across
      all pathways and boardwalks is required. The commencement of condition assessments will
      enable the development of capital programs across all pathways and boardwalks. These
      programs combined with the Cycling and Walking Strategy will improve prioritisation and
      strategy around the delivery of capital works.
6.    Asset Systems – There is the initial implementation of operational work orders for planned,
      reactive work and inspections to date. There are a number of functions of the T1 system that
      would improve the operational and maintenance activities and further improve the asset
      management objectives of the organisation. These include:
          Planned maintenance work orders;
          Costings via work orders;
          Inspections and defects logged within T1;
          Asset performance reporting from T1;
          Crew management;
          Data capture – asset validation and updating.


Asset Management Plan: Pathways and Boardwalks                                                Page 24

Section 26

7.    Levels of Service - The current levels of service for pathways and boardwalks is to support
      the services that are operated from or within these assets to the Noosa community. Council’s
      pathways and boardwalks assets are designed and constructed to suit the function of the
      service being provided which determines the levels of service. The measurement of these
      levels is ongoing, to monitor if the assets are either under or over serviced. The levels of service
      that have been developed in Section 2.9 of this document serve the purpose of how the
      pathways and boardwalk assets will be managed into the future. In addition, as result of
      adopting the service levels defined in Section 2.9, the annual service levels catalogues that
      are prepared for budget must be updated to reflect these activities and levels of service.
8.    Maintenance Plans – must be regularly reviewed and incorporated into the annual budget
      process and aligned to the levels of service activities defined in Section 2.9. Continued
      inspections and recording of asset condition and maintenance activities are key to achieving
      this initiative. This will be a key outcome for the Pathways and Boardwalks Working Group to
      develop site specific maintenance plans and develop the pathways and boardwalks
      maintenance plan for all the assets considered in this AMP.


7.3    Monitoring and Review Processes for the Asset Management Plan
This first edition of AMP for the pathways and boardwalks refers to current levels of services that
have existed over recent years. This AMP is to be a ‘living’ document reflecting actual practices used
in managing the pathways and boardwalks. In accordance with this, Council will balance cost, risk
and performance needs for the pathways and boardwalks.

The AMP will have a high-level annual review for developing the annual budget from the
maintenance and renewal plans. A full document review will occur on a four-year cycle, in line with
the completion of detailed condition assessments and the financial asset revaluation of the pathways
and boardwalks assets.


7.4    Asset Management Effectiveness
The effectiveness of this AMP will be measured in terms of:
1.   Adoption of the pathways and boardwalks AMP by Council.
2.   The ongoing development of good asset knowledge through a commitment to recording
     information against assets and undertaking cyclic condition assessments at the facility.
3.   Maintenance and renewal plans that are robust and initiate the annual budget process.
4.   Historical asset activities that are recorded and located in Council’s asset management
     system.
5.   Limited reactive work and more planned maintenance activities.
6.   The pathways and boardwalks AMP becomes the reference point for all information and
     enables good decision making for asset related activities and investments.
7.   Documented levels of service that complement the pathways and boardwalks assets that
     support the services provided by Council.




Asset Management Plan: Pathways and Boardwalks                                                   Page 25

Section 27

8. ANNEX A: Levels of Service




Asset Management Plan: Pathways and Boardwalks   Page 26

ele! NOOSA                Btatet
   ms meestseiy              SERVICE LEVEL CATALOGUE
   Service Listing 1 of 2
    Service Output                PATHWAYS, BOARDWALKS & RECREATION TRAILS
                                  Provision and maintenance of pathways including off-road shared
                                  pathways, pedestrian underpasses, boardwailks and recreation trails
                                  (Tracks & Trails).
    Service Activity              Pathways & Boardwalks
                                  The activities include inspections and routine maintenance and cleaning
                                  of sealed paths and elevated structures to provide safe off road transport
                                  and recreation options principally for pedestrians and cyclists.
    ——
                                                                     TOSSES SSS
    Cost Centres                 Pathways                            2009
                                  Hastings St Maintenance Levy       2002
                                  Arborist Services                  2303
                                  Management Civil Operations        2000
                                  Works Operations Coordination      2021
                                  Works Operations                   2704
    Key Statistics               Pathways                            237 km
                                 Boardwalks                          4.8 km
                                  Recreation Trails                  40
    Legislative responsibility to The Land Act — as trustee of reserve
   provide this service

    SERVICE DELIVERY MODEL
   Service predominately provided in-house with contractor services utilised for activities such as pressure cleaning
   and resealing of footpath paving in key town centres.

             ACTIVITY                                  SERVICE LEVEL TARGET
    Maintenance
   [inspections and routine maintenance works to provide a safe functional surface. May include grinding off uneven
    weds OF PaliiWwa SULTS Pe icrl o. ~ SV Neale OF PalriWway alice
    Note: A revised schedule of inspections and scheduled works program is being trialled and will be assessed /
    adjusted as necessary. Work Orders are generated ad hoc due to system limitations.
   The Recurrent Maintenance Manual provides for an inspection and routine maintenance schedule of every 4
    months.
    Pathways include elevated boardwalk structures that form part of a pathway, but do not bridge a waterway or other
    feature.

    Cyclic inspections (defects) |     —sPrecinct —    | SCStrategic §=F——C sd] CS    CiLcal’—CSCsd
                                 ee
   Scheduled work                As identified from inspections (defects & proactive interventions) to maintain
                                  asset serviceability based risk prioritisation and desired response times below:
          Trip Hazards — urgent
          Trip Hazards — high
          Trip Hazards — med / low
          Slippery Surface

Asset Management Plan: Pathways and Boardwalks                                                  Page 26

Section 28

Asset Management Plan: Pathways and Boardwalks   Page 27

ACTIVITY                                 iA eee      ee     cl ae
         Surface Defects
        ‘tn                              meee        |     Mere            |     Shere
         high
        Uneven/broken Path —       20 business days       40 business days      130 business days
         non-urgent

    ched                        Hastings St additional works (levy)
                                Pressure washing and resealing coloured concrete Twice a year / levy
                                Zones (includes pedestrian crossings in the road and | covers 1 extra service
                                some footpath areas)
                                Seal granite pavers with non-slip coating     Every 5 years
  Reactive work [customer       Issue                 First response          Target for completion
  requests] 7                   General pathway        As per prioritisation 20 days
                                maintenance issues (e.g. | above
                                 uneven surface
                                Hazard (trip/fall;    As per prioritisation   5 days
                                obstruction)           above
   Operations
  [Removal of debris, dead animals and graffiti as well as sweeping/cleaning of path surfaces, painting of timber
   JOCAN KYOTO We  SU ULIUI ES UNIS OT OVO icing ay Li OOS,
  Cyclic inspections            These items are picked up as part of the maintenance inspection program
                                other than for contracted works as follows:
                                Public space cleaning contracts all town precincts Monthly — locations
                                 (includes pathway sweeping & litter pick-up) selected ad hoc
  Scheduled Work                                    Jeaning/litter pick-up (Contract
                                ¢  Peregian Beach; Sunshine Beach; Sunrise
                                   Beach; Noosa Junction; Noosa Heads; Noosaville
                                   & Tewantin
                               je BoreenPoint&Cooroy WORK
                                venir                                         a
                                Hasting Street                                Twice yearly (.
                                                                              service levy funded)
                                                                              Note: LOS under
                                                                              review due to impact
                                                                              of cleaning on anti-slip
                                                                              treatment applied to
                                Peregian Beach
                                Sunshine Beach
                                Noosa Junction - (a section in front of surf shop Annually (base level
                                currently done monthly at seats due to bad stains) service)
                                Tewantin
                                Rest of the town centres and other pathways (as
                                required basis)
  Reactive work [customer       issue                                         Target for completion _|
  requests}!                    a

Asset Management Plan: Pathways and Boardwalks                                           Page 27

Section 29

Asset Management Plan: Pathways and Boardwalks   Page 28

ACTIVITY                                    SERVICE LEVEL TARGET
                                  Note: Council endorsed Graffiti Policy dated 24
                                  August 2014 provides that upon notification of a
                                  graffiti incident a graded approach is taken to
                                  removal:
                                      - Obscene, racist & other offensive material  24 hours
                                      - Large areas of graffiti or in highly visible 3 business days
                                      - Minor graffiti incidents                    14 business days

  KEY SERVICE METRICS
  Cost of service
   Pathways and Boardwalks                                  2018/19         2017/18          2016/17
   Length of network kim                                         237             243             231
   Cost of pathway maintenance                             1,798,197       1,638,987       1,466,204
  Rateable properties                                        30,500          30,000           30,000
   Cost per rateable property                                    59              55               49
  Cost per kim                                                 7,587           6,745           6,347

  PERFORMANCE MEASURE
  Pathways/Footpaths     Satisfaction      Noosa community satisfaction | Community satisfaction mean
                                           mean rating score compared   performance rating from the LGAQ
                                          to the State mean rating score | Community Satisfaction Tracking
                                           (out of optimum rating of 5). Survey for Provincial areas for:
                                            NSC mean        late mean | Theme: Basic Services &
                                           rating (2019) | rating (2017) | Infrastructure
                                                                        Function: Footpaths, Kerbing &
                                         |     848     | 82           | Guttering

 * Refer to Asset Responsibility Matrix for specific areas of responsibility
 ? Reactive maintenance requests are assessed as to warrant for work and available budget — emergencies responded to same day.
 * Source « Contract Cleaning Open Public Spaces & Amenities 16177113
 * Subject to prioritisation — emergencies are responded to same day.

Asset Management Plan: Pathways and Boardwalks                                                     Page 28

Section 30

9. ANNEX B: Pathways and Boardwalks
   Stakeholders
The internal and external stakeholders for the pathways and boardwalks are detailed below:

 Role                         Function
 Internal
 Council Staff                Council officers play a major role in managing assets to ensure that they
                              provide a level of service that meets the needs of both residents and
                              visitors to the area. Council officers implement the components identified
                              in the pathways and boardwalks asset management plan.
 Elected Council Officers     This stakeholder group includes Councilors and the Mayor for the Council.
                              They are primarily responsible to ensure that their decisions represent and
                              reflect the needs of the wider Noosa community.
 Pathways and Boardwalks      Provides technical advice to improve decision making across all internal
 Working Group                stakeholders. The group must ensure the asset management planning
                              covers the whole of life and optimally balances cost, risk and performance
                              of the pathways and boardwalks where possible.
 Asset Manager (Various)      Infrastructure Services Director responsible for the pathways and
                              boardwalk assets. However the asset managers are various across the
                              organisation based on the services provided to the community. A detailed
                              Asset responsibility matrix is required and will be developed over coming
                              months by the pathways and boardwalks working group and has been
                              defined within this AMP improvement plan.
 Operational Works            Responsible for the day-to-day maintenance activities and delivering
                              minor capital works programs.
 Asset Planning Manager       Responsible for the facilitation of condition assessments in developing
                              renewal programs.
 Finance                      Ensures that the appropriate level of financial information is made
                              available to Infrastructure Services branch management.
 External
 Community & Residents        Residents are the core users of pathways and boardwalks. Their needs,
                              wants and expectations are conveyed to Council, which should be
                              reflected in the levels of service for maintaining a good building and facility
                              assets.
 Councils Insurer             Ensures that all insurance and risk are adequately addressed.
 Visitors                     Visitor’s wants, needs and expectations drive the development in areas of
                              the highest tourism usage.

It is important that the defined roles have the capability and capacity within their management
responsibility to make good on the responsibilities assigned to them. From stakeholder discussions
held during development of the Asset Management Improvement Roadmap, some of these
responsibilities may be centralised in the first instance and then transferred to other parts of the
Organisation when the appropriate capability and/or capacity is developed.




Asset Management Plan: Pathways and Boardwalks                                                         Page 29

Section 31

10. ANNEX C: Document Management
Document Owner

Revision     Date                             Document Owner                         Date Approved
1.0          01/01/2021                       Asset Planning Manager




Document History

Revision    Date           Reviewed By                      Approved By              Date Approved
1.0         01/01/2021     Asset Planning Manager           Asset Planning Manager




Distribution of Copies

Revision          No. of Copies                        Issued to
 st
1 draft           1 x electronic copy                  Asset Planning Manager




Noosa Council Associated Asset Management Documents

Document                                                 Date         Approved By
Strategic Asset Management Plan (SAMP)                   2017         Council
Noosa Council Asset Management Roadmap                   2016         Council

Abbreviations

Abbreviations                  Meaning
AM                             Asset Management
AMP                            Asset Management Plan
CA                             Condition Assessment
ISO                            International Standards Organisation
KPI                            Key Performance Indicators
(LoS)                          Level of Service
SAMP                           Strategic Asset Management Plan




Proposed Amendments

No      Section       Proposed Amendment




Asset Management Plan: Pathways and Boardwalks                                                Page 30

Section 32

11. ANNEX D: Pathways & Boardwalks Renewal Program
 Program                    Budget Year        Description                                               LifeCycle   Project Total

 Pathways & Boardwalks      2020/2021          Shire Pathway Renewal Program                             Renewal     $332,000
 Pathways & Boardwalks      2020/2021          Noosaville Wallace Park Pathways Renewal Stage 3 & 4      Renewal     $119,000
 Pathways & Boardwalks      2020/2021          Noosa Heads Main Beach Boardwalk LED Lighting Renewal     Renewal     $120,000
 Pathways & Boardwalks      2021/2022          Sunshine Beach Belmore Terrace Pathway Renewal            Renewal     $100,000
 Pathways & Boardwalks      2021/2022          Shire Pathway Renewal Program                             Renewal     $130,000
 Pathways & Boardwalks      2022/2023          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2023/2024          Peregian Beach Plover Street Pathway Renewal              Renewal     $60,000
 Pathways & Boardwalks      2023/2024          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2023/2024          Noosa Heads Main Beach Boardwalk Renewal (Seahaven - to   Renewal     $1,000,000
                                               Western end)
 Pathways & Boardwalks      2024/2025          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2025/2026          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2026/2027          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2027/2028          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2028/2029          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2029/2030          Shire Pathway Renewal Program                             Renewal     $250,000




Asset Management Plan: Pathways & Boardwalks                                                                                Page 31

Section 33

12. ANNEX E: Pathways & Boardwalks Upgrade & Expansion
    Program
 Program                    Budget Year   Description                                                            LifeCycle   Project Total

 Pathways & Boardwalks      2020/2021     Noosaville Sea Eagle Drive Pathway upgrade STIP Grant                  Upgrade        $195,000
 Pathways & Boardwalks      2020/2021     Noosaville Hilton Tce Ivory Palms Pathway Upgrade STIP Grant           Upgrade        $225,297
 Pathways & Boardwalks      2020/2021     Cooroy Maple Street Raised pedestrian Crossing                         Upgrade        $347,554
 Pathways & Boardwalks      2021/2022     Tewantin Poinciana Avenue Pathway Upgrade                              Upgrade         $45,000
 Pathways & Boardwalks      2021/2022     Tewantin Furness Drive Bus Stop Pathway DDA Access                     Upgrade         $25,000
 Pathways & Boardwalks      2021/2022     Noosa Heads Sunshine Beach Road Pathway Lighting Upgrade (Transit      Upgrade        $100,000
                                          Centre to Bicentennial Drive)
 Pathways & Boardwalks      2022/2023     Noosa Heads Precinct West End of Sofitel Boardwalk Design &            Upgrade        $105,000
                                          Construction
 Pathways & Boardwalks      2022/2023     Tewantin Poinciana Memorial Pk Pathway Upgrade                         Upgrade        $150,000
 Pathways & Boardwalks      2022/2023     Tewantin Butler Street & Crank Street Footpath & Pedestrian Refuge -   Upgrade        $100,000
                                          Design
 Pathways & Boardwalks      2022/2023     Tewantin Goodchap Street Pathway Linkage Planning and Construction     Upgrade         $25,000
 Pathways & Boardwalks      2022/2023     Pomona School Road Pathway Linkage Planning and Construction           Upgrade         $80,000
 Pathways & Boardwalks      2022/2023     Tewantin Moorindil Street Pathway Poinciana Avenue to Toolar Street    Upgrade         $25,000
                                          (77m)
 Pathways & Boardwalks      2022/2023     Shire Pathways & Boardwalks Trunk Network Upgrade - LGIP               Upgrade        $435,000
 Pathways & Boardwalks      2023/2024     Peregian Beach Driftwood Drive Pathway David Low Way to Wavecrest      Upgrade         $22,750
                                          Drive
 Pathways & Boardwalks      2024/2025     Noosa Heads Pinaroo Park Pathway Lighting                              Upgrade         $20,000
 Pathways & Boardwalks      2024/2025     Shire Pathways & Boardwalks Trunk Network Upgrade - LGIP               Upgrade        $493,000
 Pathways & Boardwalks      2024/2025     Noosaville Edwards Street Pathway                                      Upgrade         $70,000
 Pathways & Boardwalks      2024/2025     Pomona Pathways and Pedestrian Construction Stage 1                    Upgrade        $150,000
 Pathways & Boardwalks      2024/2025     Shire Pathway (Non-Trunk) Linkage Planning and Construction            Upgrade        $500,000
 Pathways & Boardwalks      2024/2025     Tewantin Furness Drive Tewantin Blackheath Drive to St Andrews Drive   Upgrade        $149,500
 Pathways & Boardwalks      2025/2026     Shire Pathways & Boardwalks Trunk Network Upgrade - LGIP               Upgrade        $909,000
 Pathways & Boardwalks      2025/2026     Tewantin Griffith Avenue & Golf Course Drive Pathways                  Upgrade        $270,000
 Pathways & Boardwalks      2025/2026     Cooroy Swift Drive Connection to Town Centre Cooroy Noosa Road         Upgrade         $25,000
                                          Service Road to Olivine Street

Asset Management Plan: Pathways & Boardwalks                                                                                      Page 32

Section 34

 Program                    Budget Year   Description                                                              LifeCycle   Project Total

 Pathways & Boardwalks      2025/2026     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2025/2026     Peregian Beach David Low Way Pathway Service Road to Lane Beside         Upgrade         $89,375
                                          No. 245 (275m)
 Pathways & Boardwalks      2025/2026     Noosaville Off Road Trunk Connect Venture Drive Through Reserve to       Upgrade         $80,000
                                          Lane
 Pathways & Boardwalks      2026/2027     Cooroibah Lake Cooroibah Road Pathway Connection from McKinnon           Upgrade        $715,000
                                          Drive to Lake Cooroibah
 Pathways & Boardwalks      2026/2027     Tewantin Moorindil Street Pathway Toolar Street to Bus Turnaround West   Upgrade        $397,150
                                          Side
 Pathways & Boardwalks      2026/2027     Tewantin Outlook Off Road Pathway Upgrade From Behind Hooper Cres        Upgrade        $320,000
 Pathways & Boardwalks      2026/2027     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2026/2027     Noosaville Rene Street Connection of Missing Link                        Upgrade         $67,600
 Pathways & Boardwalks      2026/2027     Noosaville Hoffman Drive Connection of Missing Link                      Upgrade         $27,245
 Pathways & Boardwalks      2027/2028     Peregian Beach Shared Pathway Link to Boundary - Design                  Upgrade         $20,000
 Pathways & Boardwalks      2027/2028     Sunshine Beach Pacific Avenue Pathway Edward Street to Hill Street       Upgrade        $221,000
 Pathways & Boardwalks      2027/2028     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2027/2028     Cooroy Swift Drive Pathway Lake Mac Drive to Gumtree Drive               Upgrade        $292,500
 Pathways & Boardwalks      2027/2028     Cooroy Myall St Pathway Ferrells to Town Widen Replace (1035m)           Upgrade        $336,375
 Pathways & Boardwalks      2028/2029     Sunrise Beach Wollomia Way Pathway Orient Drive to Dame Patti Drive      Upgrade        $251,875
 Pathways & Boardwalks      2028/2029     Sunrise Beach Heathland Dr David Low Way & Edward St Missing link and    Upgrade        $543,012
                                          connections
 Pathways & Boardwalks      2028/2029     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2028/2029     Noosaville Seacove Court Walter Hay Drive Connection of Missing Link     Upgrade         $56,875
 Pathways & Boardwalks      2029/2030     Sunrise Beach Off Road Trunk Pathway – Burgess Creek Pathway             Upgrade        $477,750
                                          Extended to Wallum Lane (2100m)
 Pathways & Boardwalks      2029/2030     Tewantin Beckmans Road connection of Missing Link Noosaville State       Upgrade        $812,500
                                          School to Cooroy Noosa Road
 Pathways & Boardwalks      2029/2030     Cooroy Lake MacDonald Dr Pathway Connection to Botanic Gardens to        Upgrade        $877,500
                                          Town Centre
 Pathways & Boardwalks      2029/2030     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2029/2030     Noosaville Ventura Drive Gateway Drive to Eumundi Road                   Upgrade        $131,950




Asset Management Plan: Pathways & Boardwalks                                                                                        Page 33

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.