Skip to the record
Accept no imitations.

Original source · versioned page text

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  Vegetation Defect     Programmed               Maintenance Activity                        Risk Mitigation
       (DEFVG)          Maintenance Category                                       (Short Term response)
Defect Type
Overhanging Trees/      Overhanging/overgrown    Parks & Gardens, tree trimming/   Make path safe via typical Traffic
Overgrown Vegetation    vegetation               Pruning/weeding/spraying          Control devices AND/OR Identify
                                                                                   the size and source, remove hazard
                                                                                   using appropriate means and if
                                                                                   safe to do so
Root intrusion          Root intrusion causing   Inspect for removal               Identify and report
                        defects
Fallen tree/Dead wood   Fallen tree              Parks & Gardens, tree trimming/   Make path safe via typical Traffic
hazard                                           pruning                           Control devices AND/OR Identify
                                                                                   the size and source, remove hazard
                                                                                   using appropriate means and if
                                                                                   safe to do so




   Asset Management Plan: Pathways and Boardwalks                                                        Page 10
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.