2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
6. Financial Summary
6.1    Financial Statements and Projections
Council’s pathways and boardwalks play a vital role in the services provided to the community across
the Noosa Shire. There is approximately 209km (3,135 segments) of pathway and boardwalk assets
on Council’s financial register considered in this Asset Management Plan (AMP). These assets have
a current replacement value of $67.4m, equating to approximately 6% of Council’s financial assets.

The capital, operational and maintenance expenses for pathways and boardwalks make up
approximately 1.5% of the $94m annual budget. The capital works program fluctuates from year to
year, however, the 2019/20 capital works program the capital investment of $289k for pathways and
boardwalks equates to 1% of the $29.5m capital works program.

The annual operating plan details the financial statements and projections associated with the
operational and maintenance expenses for the services the pathways and boardwalks support on
an annual basis. The capital investments including renewals, upgrades and expansions are
highlighted in the annual capital works program which is reflected in the 10-year capital works
program.


6.2    Funding Strategies
The immediate improvements to funding requests for maintenance and renewals in the budget
process are now evidence based and are supported from the condition assessments that have been
carried out.

The funding strategy, key assumptions, reliability and confidence levels are detailed in the Council’s
long-term financial plan. More detailed funding strategies that promote the long-term sustainability
of the pathways and boardwalks will be further developed and defined in future asset management
plans.


6.3    Budget Forecasts
Budget forecasts will continue to be developed as information is captured and reported from the
Technology One (T1) financial system. Through the annual review of actuals, maintenance and
renewal activities against budget will initiate further development and identify trends that are
reportable and reflect future year forecasts. The development of the Walking and Cycling Strategy
will impact the current budget forecast within the AMP, based on the proposed upgrades, expansions
and new pathway and boardwalk infrastructure identified within the strategy. When the Walking and
Cycling Strategy is adopted by Council this plan and the budget forecast will be updated to ensure
the AMP and the Walking and Cycling Strategy remain aligned.

Figure 9 below identifies the current forecasts for the operational, maintenance upgrade and renewal
expenses to demonstrate the whole of life costs over a 10-year period for the pathways and
boardwalks by program, in the amount of $32.3m. There will be further asset renewal, upgrades and
maintenance activities to be developed over coming years that will influence this current forecast.
To achieve good asset knowledge of all pathways and boardwalks assets it is important to continue
with undertaking asset data reconciliation and physical condition assessments to make well informed
asset decisions.

The pathways and boardwalks assets have varying useful lives for the asset classes maintained by
Council. The pathways and boardwalks useful lives vary, based on construction, material type and
have estimated lives between 10 – 60 years.



Asset Management Plan: Pathways and Boardwalks                                                Page 22
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.