Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
11. ANNEX D: Pathways & Boardwalks Renewal Program
 Program                    Budget Year        Description                                               LifeCycle   Project Total

 Pathways & Boardwalks      2020/2021          Shire Pathway Renewal Program                             Renewal     $332,000
 Pathways & Boardwalks      2020/2021          Noosaville Wallace Park Pathways Renewal Stage 3 & 4      Renewal     $119,000
 Pathways & Boardwalks      2020/2021          Noosa Heads Main Beach Boardwalk LED Lighting Renewal     Renewal     $120,000
 Pathways & Boardwalks      2021/2022          Sunshine Beach Belmore Terrace Pathway Renewal            Renewal     $100,000
 Pathways & Boardwalks      2021/2022          Shire Pathway Renewal Program                             Renewal     $130,000
 Pathways & Boardwalks      2022/2023          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2023/2024          Peregian Beach Plover Street Pathway Renewal              Renewal     $60,000
 Pathways & Boardwalks      2023/2024          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2023/2024          Noosa Heads Main Beach Boardwalk Renewal (Seahaven - to   Renewal     $1,000,000
                                               Western end)
 Pathways & Boardwalks      2024/2025          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2025/2026          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2026/2027          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2027/2028          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2028/2029          Shire Pathway Renewal Program                             Renewal     $250,000
 Pathways & Boardwalks      2029/2030          Shire Pathway Renewal Program                             Renewal     $250,000




Asset Management Plan: Pathways & Boardwalks                                                                                Page 31
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.