2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Program                    Budget Year   Description                                                              LifeCycle   Project Total

 Pathways & Boardwalks      2025/2026     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2025/2026     Peregian Beach David Low Way Pathway Service Road to Lane Beside         Upgrade         $89,375
                                          No. 245 (275m)
 Pathways & Boardwalks      2025/2026     Noosaville Off Road Trunk Connect Venture Drive Through Reserve to       Upgrade         $80,000
                                          Lane
 Pathways & Boardwalks      2026/2027     Cooroibah Lake Cooroibah Road Pathway Connection from McKinnon           Upgrade        $715,000
                                          Drive to Lake Cooroibah
 Pathways & Boardwalks      2026/2027     Tewantin Moorindil Street Pathway Toolar Street to Bus Turnaround West   Upgrade        $397,150
                                          Side
 Pathways & Boardwalks      2026/2027     Tewantin Outlook Off Road Pathway Upgrade From Behind Hooper Cres        Upgrade        $320,000
 Pathways & Boardwalks      2026/2027     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2026/2027     Noosaville Rene Street Connection of Missing Link                        Upgrade         $67,600
 Pathways & Boardwalks      2026/2027     Noosaville Hoffman Drive Connection of Missing Link                      Upgrade         $27,245
 Pathways & Boardwalks      2027/2028     Peregian Beach Shared Pathway Link to Boundary - Design                  Upgrade         $20,000
 Pathways & Boardwalks      2027/2028     Sunshine Beach Pacific Avenue Pathway Edward Street to Hill Street       Upgrade        $221,000
 Pathways & Boardwalks      2027/2028     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2027/2028     Cooroy Swift Drive Pathway Lake Mac Drive to Gumtree Drive               Upgrade        $292,500
 Pathways & Boardwalks      2027/2028     Cooroy Myall St Pathway Ferrells to Town Widen Replace (1035m)           Upgrade        $336,375
 Pathways & Boardwalks      2028/2029     Sunrise Beach Wollomia Way Pathway Orient Drive to Dame Patti Drive      Upgrade        $251,875
 Pathways & Boardwalks      2028/2029     Sunrise Beach Heathland Dr David Low Way & Edward St Missing link and    Upgrade        $543,012
                                          connections
 Pathways & Boardwalks      2028/2029     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2028/2029     Noosaville Seacove Court Walter Hay Drive Connection of Missing Link     Upgrade         $56,875
 Pathways & Boardwalks      2029/2030     Sunrise Beach Off Road Trunk Pathway – Burgess Creek Pathway             Upgrade        $477,750
                                          Extended to Wallum Lane (2100m)
 Pathways & Boardwalks      2029/2030     Tewantin Beckmans Road connection of Missing Link Noosaville State       Upgrade        $812,500
                                          School to Cooroy Noosa Road
 Pathways & Boardwalks      2029/2030     Cooroy Lake MacDonald Dr Pathway Connection to Botanic Gardens to        Upgrade        $877,500
                                          Town Centre
 Pathways & Boardwalks      2029/2030     Shire Pathway (Non-Trunk) Linkage Planning and Construction              Upgrade        $500,000
 Pathways & Boardwalks      2029/2030     Noosaville Ventura Drive Gateway Drive to Eumundi Road                   Upgrade        $131,950




Asset Management Plan: Pathways & Boardwalks                                                                                        Page 33
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.