Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
2.4    Pathways and boardwalks Asset Management Objectives
The AM objectives detailed in the AMP include:
•    A consolidated asset register that identifies:
     o     Asset description;
     o     Asset condition;
     o     Useful life and renewal dates; and
     o     Replacement costs.
•    The levels of service provided by pathways and boardwalks to the Noosa Community;
•    Current and future maintenance expenditure;
•    Identifying any future demand forecasts for the pathways and boardwalks;
•    Identifying any legislative considerations necessary in the management of the pathways and
     boardwalks;
•    Documenting the financial forecasts for the pathways and boardwalks;
•    Identifying all risks and opportunities related to management of the pathways and boardwalks;
     and
•    Documentation of any future actions identified to improve the asset management objectives of
     the pathways and boardwalks.



2.5    Levels of Service
The levels of service that are currently being maintained for Council’s pathways and boardwalks are
aligned to the Corporate Plan and Branch Plan objectives. The continuous development and
implementation of the asset management objectives that include good asset governance and asset
knowledge are also aligned to the Corporate Plan objectives. The service delivery is provided
internally with external specialists and technical consultants engaged as required.

Any changes in the levels of service to the pathways and boardwalks will be required to demonstrate
the benefit and be approved by Council. Changes in levels of service should be addressed through
the asset management governance framework prior to the approval by Council.



2.6    Legislative & Standards Requirements
The legislative and Standards requirements relative to pathways and boardwalks are:
•     Building Act 1975
•     Disability Discrimination Act (Commonwealth) 1991
•     National Construction Code 2015
•     The National Construction Code of Australia (NCC)
•     Coastal Protection & Management Act
•     Queensland Heritage Act
•     Nature Conservation Act
•     Aboriginal Cultural Heritage Act
•     Workplace Health and Safety Act




Asset Management Plan: Pathways and Boardwalks                                              Page 5
Log in to download the original file

2021-01-18 GC - Item 7 - Attachment 1 - Pathways and Boardwalks Asset Management Plan(PDF, 2MB).pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.