Log in to see the plans as drawn 2.9.2 Maintenance Service Levels
The table below defines the frequency times based on Councils normal hours of work to respond to
particular maintenance criteria.
Hierarchy Frequency Times
Level 1 Level 2 Level 3 Level 4
Inspections
Defect Inspections 2 months 4 months 6 months Yearly
Condition Assessments 3-5 years 3-5 years 3-5 years 3-5 years
Programmed Maintenance Category
Trip Hazards – urgent (>30mm) 24 hours 24 hours 48 hours 48 hours
Trip Hazards – high (>20mm <=30mm) 2 weeks 2 weeks 1 month 2 months
Trip Hazards – med (>10mm <=20mm) 1 month 1 month 2 months As budget allows
Trip Hazards – low (>5mm <=10mm) 2 months 3 months As budget allows As budget allows
Slippery Surface 48 hours 2 weeks 4 weeks 8 weeks
Uneven/broken Path – Non trip hazard 4 weeks 3 months As budget allows As budget allows
Overhanging/Overgrown Vegetation 2 weeks 2 Months 6 Months As Budget Allows
Fallen Tree - Urgent 24 hours 24 hours 48 hours 48 hours
Root Intrusion (for prevention of damage) 1 year 1 year 2 years 2 years
Graffiti/Vandalism (offensive) 1 day 1 days 2 days 1weeks
Graffiti/Vandalism (non-offensive) 2 days 2 days As budget allows As budget allows
Missing Sections (< 10m² eg. Random 4 weeks 3 months As budget allows As budget allows
Panels, Pavers, Tiles) – Non trip hazard
Missing Tactiles 3 months 6 months 1 year 1 year
2.9.3 Defects & Maintenance Activities
The below table identifies the common defects on pathways and boardwalks with maintenance
activity and risk mitigation. This table will support how inspections are developed, how defects are
rectified and how risks to these assets are mitigated.
Damage Defect Programmed Maintenance Activity Risk Mitigation
(DEFDG) Maintenance Category (Short Term response)
Defect Type
Vertical Displacement All Trip Hazards Grinding/Patching Make path safe via typical Traffic
Control devices
Crack All Trip Hazards Clean out & Fill with appropriate Make path safe via typical Traffic
Uneven / broken crack sealant, Consider area for Control devices
Tree root intrusion replacement
Hole All Trip Hazards Square up edges, clean and fill Make path safe via typical Traffic
Uneven / broken with appropriate material, Control devices AND/OR patch with
consider area for replacement quarry or premixed product
Edge-break All Trip Hazards Edge repair as required with Make path safe via typical Traffic
Uneven / broken suitable material Control devices AND/OR remove
Missing sections material and reinstate temporarily
Edge drop All Trip Hazards For localised sections prepare Make path safe via typical Traffic
Missing sections adjacent surface for placement Control devices AND/OR place
and compaction of suitable fill suitable fill material to reduce risk
material of injury. Assess extent of edge
drop-off for reinstatement
Damage Defect Programmed Maintenance Activity Risk Mitigation
(DEFDG) Maintenance Category (Short Term response)
Asset Management Plan: Pathways and Boardwalks Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.