                                                                                    SWMS:02 – Elevating Work Platforms

Project Details
Project:                                                                                                                            Responsible Person:          Matt Leeke 0414 691 314
                                        71 SEAVIEW TCE SUNSHINE BEACH QLD 4567
                                                                                                                                    Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                    Site Foreman :               Terry Strahan 0419 762 427
Activity Description:                   Operation of and carrying out work activities from Elevated Work Platforms                  Site Foreman :               Jesse Joyce 0403 745 840
                                        (EWPs)                                                                                      HSO:                         Terry Strahan 0419 762 427
Referenced SWMS:                        SWMS: 04 – SWMS 06 – SWMS 08
Plant and Equipment Involved:             EWP
                                          Fall arrest harness (boom-type EWPs)
                                          Various drills, saws, and hand tools
                                                                                                                                                                    energised electrical installations
                                        Work at Heights >2m                   Disturbance of asbestos                    Confined spaces
                                                                                                                                                                    or services
High Risk Activities:                                                          Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                          temporary support                         tunnel                                     atmosphere
                                        A work area with moving                water or other liquid that
                                                                                                                         tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                   involves a risk of drowning
PPE Required:                           Hard Hat                      Safety glasses / goggles           Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                  Face Shield                       Gloves                             Respirator                       High Visibility Vest
                                           Inspection and maintenance as per manufacturer’s recommendations
Maintenance / Prestart Checks
Required:                                  Operator pre-start checks to be undertaken prior to daily use and recorded in machine logbook
                                           3-monthly service inspection
                                           12-monthly maintenance inspection
Certificates of Competency                  Certificate of Competency required for operation of Boom-type EWPs with a boom length of 11m or more
Required:
                                             Course Code: OHSCER235A (Boom-type EWPs with a boom length of 11m or more)
Training / Competencies Required:
                                             Scissor lift operators to be competent / trained
                                             Plant familiarisation training
                                             Training in use of fall-arrest harnesses & rescue
                                             Induction into this SWMS
                                        Work Health and Safety Act 2011, Sections 27, 28, 29.                            AS 1418.10 Cranes, Hoists and Winches - Elevating Work
Health, Safety or Environmental                                                                 Codes or Standards
                                        Work Health and Safety Regulations 2011, Part 4.5                                Platforms
Legislation:                                                                                    Applicable to the Works:
                                        VIC Occupational Health & Safety Regulations 2007,                               AS 2550.10 Cranes – Safe Use - Elevating Work Platforms
                                        Section 3.5.34                                                                   AS 1891.4 (Industrial Fall-Arrest Systems and Devices-Selection,
                                                                                                                         Use and Maintenance)
584 Milton Road TOOWONG QLD 4066                               SWMS Developed by:     Jamie Gilbert                                                                      VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                            Position:              National Health & Safety Co-ordinator                                                                 Page 15
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.