SWMS:03 – Mobile Scaffolds
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
Erection and dismantling Falls from heights B 5 E Mobile scaffolds are to be erected / dismantled in Licenced Scaffolder / E 5 H
mobile scaffold 24 strict accordance with manufacturer requirements. Competent Person 15
Mobile scaffolds that are not completed, or not in
3 accordance with manufacturer’s requirements are to be
signed as ‘No Access’.
Falling objects C 4 E 3 Areas around mobile scaffolds being erected or Licenced Scaffolder / D 4 H
18 dismantled are to be barricaded off where there is a risk of Competent Person 14
injury to other workers below of a collapse or falling
component (e.g. barrier tape - minimum 900mm high).
5 Scaffold components and / or any other objects are not
to be dropped from the scaffold.
Scaffold collapse / tip- B 5 E 5 Mobile scaffolds are to be erected / dismantled in Licenced Scaffolder / E 5 H
over 24 strict accordance with manufacturer requirements. Competent Person 15
5 Only a licenced scaffolder or competently trained
person is to erect scaffolds greater than 4 metres high on site.
Only a licenced scaffolder is to erect a scaffold where
5 the working deck is greater than 4 metres.
Plan bracing is to be incorporated at the base of the
scaffold to provide greater stability where necessary.
The height of the mobile scaffold is not to exceed three
4
(3) times the least base dimension.
4 Do not climb on the external side of a mobile scaffold
- internal ladder to be installed for access – as per
1 manufacture design
Erection and dismantling Contact with over head C 5 E 1 Mobile scaffolds are not to be erected in the vicinity of Licenced Scaffolder / E 5 H
mobile scaffold (Cont) powerlines 22 overhead power lines where there is a risk of any part of Competent Person 15
the scaffold, person or object entering a power line’s
exclusion zone. Note: This is 3m minimum for low voltage, if
unsure check with site manager.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 25
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.