SWMS:05 – Trestle Platforms < 2m in Height
Safe Work Methods
Responsible
H Controls / Work Methods Residual Risk
person/s for
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor &
C 5. Admin 6. PPE L C R
Review
Failure to identify C 4 E 5 Conduct visual inspection of equipment during unloading. Persons erecting D 4 H
Preparation
damaged / defective 18 4 Trestle platforms are only to be used as Trestle platform 14
equipment /
components
Falls from heights B 5 E 5 Trestle platforms are to be erected / dismantled in strict Persons erecting E 5 H
Erection and dismantling trestle
24 accordance with manufacturer requirements. Trestle platform 15
platforms
Working platform to be less than 2m high.
4
Work from ground level during the erection process.
5
5 Erect frames and all bracing before installing planks.
4 The platform is to have an unobstructed surface of at least
450 mm wide along the length of the platform.
4 Where separate planks are used to form the platform, the
planks are to be secured together such that they do not
flex or move independently.
4 Maximum gap between inner edge of platform and
structure not to exceed 225mm.
Falling objects C 4 E 3 Areas around trestle platforms being erected or Persons erecting D 4 H
18 dismantled are to be barricaded off where there is a risk of Trestle platform 14
injury to other workers below of a collapse or falling
component (e.g. barrier tape - minimum 900mm high).
1- Components and / or any other objects are not to be
5 dropped from the platform.
Platform collapse / tip- B 5 E 5 Trestle platforms are to be erected / dismantled in strict Persons erecting E 5 H
over 24 accordance with manufacturer requirements. Trestle platform 15
4 Each trestle ladder is to be secured to prevent it moving.
The height of the platform is to be less than 2m.
4
Note: refer to Scaffolding SWMS for work platforms over 2m.
584 Milton Road TOOWONG QLD 4066 SWMS Approved by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 40
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.