SWMS:07 – Excavation & Trenching Project Details Project: 71 SEAVIEW TCE SUNSHINE BEACH QLD 4567 Responsible Person: Matt Leeke 0414 691 314 Site Manager: Matt Leeke 0414 691 314 Site Foreman : Terry Strahan 0419 762 427 Performing various work activities associate with Excavation and Trenching Site Foreman : Jesse Joyce 0403 745 840 Activity Description: Activities HSO: Terry Strahan 0419 762 427 SWMS 04 – SWMS 06 – SWMS 08 Referenced SWMS: Earthmoving equipment: Excavator , Back Hoe , Bob Cat , Front End Loader , Roller , Other: Plant and Equipment Involved: Shovel and hand tools energised electrical installations Work at Heights >2m Disturbance of asbestos Confined spaces or services High Risk Activities: Structural alterations requiring Excavation >1.5 metres or near a a contaminated or flammable Demolition of a structure Carried out in or near the following: temporary support tunnel atmosphere A work area with moving water or other liquid that tilt-up or precast concrete Other: ____________________ powered mobile plant involves a risk of drowning PPE Required: Hard Hat Safety glasses / goggles Hearing Protection Fall Arrest Harness Disposable overalls: (Tick as relevant) Safety Boots Face Shield Gloves Respirator High Visibility Vest Daily inspection of the trench for stability and factors that may affect the stability of the trench at the start of every day and before each entry Maintenance / Prestart Checks into the trench. Required: Pre-start inspection of mobile plant Inspection and maintenance of mobile plant as per manufacturer requirements Geotechnical Engineer qualifications Certificates of Competency Required: Certificate(s) of Competency for operation of particular mobile plant Certificate(s) of Competency for operation of particular mobile plant and dogging work (where relevant) Training / Competencies Required: Induction into this SWMS General Safety Induction Work Health & Safety Act 2011 Mobile Crane Code of Practice 2006 - QLD Health, Safety or Environmental Codes or Standards Work Health & Safety Regulation 2011, Part Excavation Work Code of Practice 2013 – QLD Legislation: Applicable to the Works: 13.1, Division 11 Excavation Work Code of Practice 2014 – NSW VIC OH&S Regulations 2007, Section 5.1.26 Excavation Work Code of Practice 2012 – TAS QLD, NSW & TAS Code of Practice – Managing risks of plant in the workplace 2013 VIC Code of Practice(no.19) – Plant 1995 584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 8 – September 2015 P: (07) 3335 5000 F: (07) 3335 5005 Position: National HSE Coordinator Page 50 ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.