SWMS:09 – Working with Bonded Asbestos Containing Materials – N/A
Safe Work Methods
Responsible Residual
H Controls / Work Methods
Person/s for Risk
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
Identification of ACM Failing to identify asbestos B 3 H 5 Obtain a copy of the Asbestos Register for the building or Hutchinson Site C 2 M
containing material 1 structure and review it before performing any work on the Foreman 8
7 building / structure to identify the presence of asbestos
containing material (ACM).
5 Inspect the building / structure for warning signs / labels
outlining the presence of ACM.
If no asbestos register is available then either have an
5
inspection performed (by a competent person in the
identification of ACM) to identify the presence of ACM in it
(and the production of an asbestos register) or presume all
suspect material to contain asbestos.
Performing work on ACM Entry to the work area by the C 3 H 3 Segregate the asbestos removal site to restrict entry to Licensed B D 3 M
(Eg. drilling through AC public – possibly exposing them to 13 authorised persons only by defining the work area Class 9
sheeting) the risk of inhalation of airborne (erecting barricades and signs to ensure unauthorised Removalist
asbestos fibres. person do not enter the asbestos work area). The
distances and placement of barricades and signs is to be
further risk assessed at the time and location prior to the
work commencing.
5 Signs erected are to comply with AS 1319.
2 Carry out the work with as few people present as possible.
Contamination of clean surfaces / B 2 H 3 Cover any surface within the asbestos work area with Licensed B C 2 M
water 12 0.2mm plastic sheeting and duct tape to prevent Class 8
contamination of the surface. Removalist
If using a bucket of water, do not re-soak the rags in the
2
bucket (as this will contaminate the water), instead either
fold the rag so a clean surface is exposed or use another
rag.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 72
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.