Skip to the record
Beware of cheap imitations.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 244, section 1. The text section number identifies this passage in the reader.

                                                                                                     SWMS:10 – Lasers


Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                     Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                   Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                   Site Foreman :               Terry Strahan 0419 762 427
                                        Setting up and using Lasers to carry out various work activities                           Site Foreman :               Jesse Joyce 0403 745 840
Activity Description:
                                                                                                                                   HSO:                         Terry Strahan 0419 762 427

Referenced SWMS:                        Nil

Plant and Equipment Involved:           Lasers
                                                                                                                                                                   energised electrical installations
                                        Work at Heights >2m                   Disturbance of asbestos                    Confined spaces
                                                                                                                                                                   or services
High Risk Activities:                                                          Structural alterations requiring          Excavation >1.5 metres or near            a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                          temporary support                         a tunnel                                  atmosphere
                                        A work area with moving                water or other liquid that
                                                                                                                         tilt-up or precast concrete               Other: ____________________
                                        powered mobile plant                   involves a risk of drowning
PPE Required:                           Hard Hat                       Safety glasses / goggles          Hearing Protection               Fall Arrest Harness               Disposable overalls:
(Tick as relevant)                      Safety Boots                   Face Shield                      Gloves                            Respirator                        High Visibility Vest

Maintenance / Prestart Checks                Inspection and maintenance of lasers to be in accordance with the Manufacturers Specifications and AS 2211 Laser Safety
Required:

Certificates of Competency              Nil
Required:
                                         Induction into this Work Method Statement
Training / Competencies Required:
                                         Laser Safety Officer Training Certificate for lasers > Class 2
                                         General Safety Induction
                                        Work Health and Safety Act 2011                                                            AS/NZS 2211.1 Laser Safety
Health, Safety or Environmental                                                              Codes or Standards
                                        Work Health and Safety Regulations 2011                                                    AS 2397 Safe Use of Lasers in the Building and Construction
Legislation:                                                                                 Applicable to the Works:
                                                                                                                                   Industry
                                                                                                                                   AS 1319 Safety signs for the occupational environment


584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:     Jamie Gilbert                                                                       VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:              National Health & Safety Co-ordinator                                                                  Page 82
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.