                                                                                                   SWMS:13 – Starter Bars

Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                         Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                       Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                       Site Foreman :               Terry Strahan 0419 762 427
                                        Working in the vicinity of starter bars                                                        Site Foreman :               Jesse Joyce 0403 745 840
Activity Description:
                                                                                                                                       HSO:                         Terry Strahan 0419 762 427
                                        N/A
Referenced SWMS:

Plant and Equipment Involved:           Starter bars, proprietary caps
                                                                                                                                                                       energised electrical installations
                                        Work at Heights >2m                       Disturbance of asbestos                   Confined spaces
                                                                                                                                                                       or services
High Risk Activities:                                                             Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                             temporary support                         tunnel                                     atmosphere
                                        A work area with moving                   water or other liquid that
                                                                                                                            tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                      involves a risk of drowning
PPE Required:                           Hard Hat                         Safety glasses / goggles           Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                     Face Shield                        Gloves                            Respirator                       High Visibility Vest
                                        N/A
Maintenance / Prestart Checks
Required:
                                        N/A
Certificates of Competency
Required:
                                        Induction into this SWMS
Training / Competencies Required:
                                        General Safety Induction
                                        Work Health & Safety Regulation 2011, Chapter 4
Health, Safety or Environmental                                                                   Codes or Standards
                                        VIC OH&S Act 2004, Part 3
Legislation:                                                                                      Applicable to the Works:




584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:        Jamie Gilbert                                                                       VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:                 National Health & Safety Co-ordinator                                                                 Page 107
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.