Skip to the record
Accept no substitutions.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 27, section 1. The text section number identifies this passage in the reader.

                                                                                     Hutchinson Builders – ABN:52 009 778 330

                                     WHSMP:01 – Work Health & Safety Management Plan
                                                                                                                   Version: 9.2



      6.2     Visitor Process
A Visitor will be required to sign the Visitors Register (HB-HSEQ-F-026) upon entry into the site. Visitors are
required to wear as a minimum PPE including – leather enclosed footwear, hard hat and high-Vis safety vest
(to Australian Standard) when on site, unless in the site office. Visitors are to remain with their guide at all
times whilst on site. Visitors will receive a brief description of the hazards on site, and will be required to sign
out of the visitor register prior to leaving the site.

      6.3     Training Matrix
A Training Matrix shall be developed for the site capturing all internal HB site workers. Ensuring all persons
working on site have been trained and assessed as competent to undertake the tasks required. Data entered
onto the Site Training Matrix (Reference Procedure MP:04 and Site Training Register - HB-HSEQ-F-031) is to
include:

             Current skills obtained.
             HB Training Modules
             Minimum requirements for each skill obtained.
             Certificates of Competency if required.
             Required training (including familiarisation training).
             Expiry dates.
All courses should be booked through the Workforce Development Team in Head Office. The Workforce
Development Team will liaise with the appropriate Registered Training Organizations (RTO’s) to organize the
most appropriate training at the required times.




                                                                                                                 Page 27 of 58

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.