Skip to the record
Accept no imitations.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 277, section 1. The text section number identifies this passage in the reader.

                                                              SWMS:14 – Hazardous Substances & Dangerous Goods (General)
Safe Work Methods
                                                                                          H                   Controls / Work Methods                             Responsible       Residual
           Job Steps                           Potential Hazards       L    C      R      O           1. Eliminate 2. Substitute 3. Isolate 4. Engineer           Person/s for        Risk
                                                                                          C                            5. Admin 6. PPE                        Monitor & Review     L C      R
Prior to using a hazardous            Failing to identify the risks    C    5      E       5        Conduct risk assessment and purchase/use a less          Hutchinson           D    3    M
substance / dangerous good on         associated with a particular                 22                hazardous/dangerous substance where possible.            Builders Foreman               9
site                                  hazardous     substance     /
                                                                                                    A current SDS (within 5 years) is to be obtained
                                      dangerous good                                                                                                          Workers
                                                                                                     and kept on site.
                                                                                           5        A hazardous substance/dangerous goods risk
                                                                                                     assessment is to be completed prior to use.

                                                                                           5        Where a Risk Assessment for a hazardous
                                                                                                     substance/dangerous good determines a
                                                                                                     ‘Significant Level of Risk’ a SWMS specific for the
                                                                                           5         use of that substance is to be developed and
                                                                                                     workers suitably trained.
                                                                                                    All containers in which hazardous substances
                                                                                                     and dangerous goods are stored are to be
                                                                                                     suitably labelled (e.g. full product name, safety &
                                                                                                     risk phrases etc.).

                                                                                           5
Transport of a hazardous              Spills                           C    3      H       5        Appropriate spill containment (spill kit, absorbing      Hutchinson           D    3    M
substances / dangerous goods                                                       13                material, kitty litter etc…) is to be transported with   Builders Foreman               9
                                                                                                     the hazardous substance to contain spills (Refer to
                                                                                                     SDS).                                                    Workers
                                      Incompatibility with other       C    3      H       5        Incompatible substances are not to be transported        Hutchinson           D    3    M
                                      substances                                   13                together unless adequate separation can be               Builders Foreman               9
                                                                                                     maintained in accordance with the SDS.
                                                                                                                                                              Workers
Using / handling hazardous            Physical contact and specific    C    4      E       5        Hazardous substances / dangerous goods are to be         Hutchinson           D    4    H
substances / dangerous goods          effects                                      18                used in accordance with the relevant SDS,                Builders Foreman               14
                                                                                                     hazardous substance risk assessment and work
                                                                                                                                                              Workers


584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:       Jamie Gilbert                                                                VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:                National Health & Safety Co-ordinator                                                          Page 115
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.