                                                                                    SWMS:15 – Work at Heights (General)

Safe Work Methods
                                                                                          H                                                                        Responsible      Residual
                                                                                                                 Controls / Work Methods
                                                                                          O                                                                       Person/s for        Risk
            Job Steps                      Potential Hazards            L   C       R                    1. Eliminate 2. Substitute 3. Isolate 4. Engineer
                                                                                          C                                                                         Monitor &      L C R
                                                                                                                          5. Admin 6. PPE                            Review
Planning and undertaking general       Failure to identify a suitable   B   5   E                No work at heights is to be carried out on site unless one     Hutchinson        E    5      H
work at heights activities             means of access and / or                 24                of the following control measures (in order of their           Builders Site                 15
                                       working at height - falls                                  preferred use) is adopted:                                     Foreman
                                       from height                                        3       a. the erection of physical barriers (such as guardrails and
                                                                                                     scaffolding),                                               Workers
                                                                                                   b. providing a personal fall protection system (fall-arrest
                                                                                          4           harness system or travel restraint system), or
                                                                                                   c. providing a catch system (e.g. fall arresting platform,
                                                                                                      catch net etc).
                                                                                          4
                                                                                                   d. providing an exclusion zone
                                                                                          3
Accessing and working at height in     Falls from height                B   5   E         4      A suitable means of access to areas at height is to be Hutchinson                E    5      H
areas protected by physical                                                     24                provided and used (e.g. appropriately placed / secured Builders Site                         15
barriers - hand rails or guard rails                                                              ladder, stairs, EWP etc.                               Foreman
                                                                                                 Workers are not to access any area(s) where edge
                                                                                          1       protection has not been erected or where any other fall        Workers
                                                                                                  hazard may exist.

                                                                                          1      Under no circumstances are workers to climb on or
                                                                                                  otherwise position themselves where they are at risk of
                                                                                                  falling onto and / or over protected edges.
                                       Falling objects                  C   4   E         4       Where there is a risk of objects falling onto workers /       Hutchinson        D    4      H
                                                                                18                 persons below, a suitable means of restraining tools,         Builders Site                 14
                                                                                                   equipment and any other materials is to be used (e.g.         Foreman
                                                                                                   lanyards / wrist straps, toe boards (min 150mm high) etc).
                                                                                                  Exclusion zone(s) to be established below (where              Workers
                                                                                          3        relevant).
                                                                                                  Tools, equipment and any other objects / materials are not
                                                                                          1        to be positioned where they could fall.


584 Milton Road TOOWONG QLD 4066                               SWMS Developed by:       Jamie Gilbert                                                             VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                            Position:                National Health & Safety Co-ordinator                                                       Page 123
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.