                                                         SWMS:16 – Working Around Concrete Trucks & Placement Booms
Safe Work Methods
                                                                                     H                   Controls / Work Methods                          Responsible         Residual
            Job Steps                      Potential Hazards          L    C    R    O           1. Eliminate 2. Substitute 3. Isolate 4. Engineer        Person/s for          Risk
                                                                                     C                            5. Admin 6. PPE                       Monitor & Review     L C R
                                                                                               Safe access for workers, trucks and members of
                                                                                                the public is to be maintained in the vicinity of the
                                                                                      5         pumping unit.
                                                                                               Signage and barricading where required, is to be
                                                                                                erected prior to the pour.
                                      Rollover of pump and/or truck   B    5     E    5        Pump location is to be clear, have level ground         Hutchinson           E    5       H
                                                                                24              and be capable of supporting the pump unit and          Builders Site                     15
                                                                                                the concrete delivery trucks.                           Foreman
                                                                                               All outriggers are to be fully extended and sole
                                                                                                                                                        Pump Operator
                                                                                                plates correctly placed to support the load.
                                                                                     5/
                                                                                                Outriggers are to be placed clear of excavations,
                                                                                     4
                                                                                                soft or filled ground.
                                      Contact with overhead power     B    5     E    5        An inspection is to be carried out by the pump          Hutchinson           E    5       H
                                      lines or structures                       24              operator and/or Site Foreman to identify any            Builders Site                     15
                                                                                                potential overhead power line hazards.                  Foreman
                                                                                               Where overhead power lines are present, pump
                                                                                                                                                        Pump Operator
                                                                                                booms are not to be allowed to intrude into the
                                                                                      1
                                                                                                safe approach distances (i.e. exclusion zones) for
                                                                                                the power lines.
                                                                                               Wind conditions and the position of the concrete
                                                                                      5         boom are to be monitored at all times to ensure
                                                                                                that the boom does not intrude into the safe
                                                                                                approach distance of any overhead power lines
                                                                                                or any other overhead hazard(s).
                                      Lack of communication           C    4     E    5        A means of suitable communication between the           Hutchinson           D    3       M
                                                                                18              pump and the work face is to be established prior       Builders Site                     9
                                                                                                to pumping.                                             Foreman

                                                                                      5                                                                 Pump Operator
584 Milton Road TOOWONG QLD 4066                           SWMS Developed by:   Jamie Gilbert                                                                VERSION 6 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                        Position:            National Health & Safety Co-ordinator                                                            Page 6
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.