Skip to the record
The only place to find full transcripts.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 320, section 1. The text section number identifies this passage in the reader.

                                                                           SWMS:19 – Protecting Penetrations & Openings

Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                        Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                      Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                      Site Foreman :               Terry Strahan 0419 762 427
                                        Covering penetrations, openings and erecting edge protection over and around                  Site Foreman :               Jesse Joyce 0403 745 840
Activity Description:
                                        various construction areas i.e. bored piers, floor voids, lift shafts, stair well voids
                                                                                                                                      HSO:                         Terry Strahan 0419 762 427
                                        etc.
Referenced SWMS:                        SWMS 04 – SWMS 08 - SWMS 15 – SWMS 20

Plant and Equipment Involved:           Material for covering penetrations/openings (e.g. ply etc.), temporary edge protection components ( scaffold components or proprietary system)
                                                                                                                                                                      energised electrical installations
                                        Work at Heights >2m                     Disturbance of asbestos                    Confined spaces
                                                                                                                                                                      or services
High Risk Activities:                                                            Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                            temporary support                         tunnel                                     atmosphere
                                        A work area with moving                  water or other liquid that
                                                                                                                           tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                     involves a risk of drowning
PPE Required:                           Hard Hat                        Safety glasses / goggles           Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                    Face Shield                       Gloves                             Respirator                       High Visibility Vest
                                           Inspection of fall arrest harnesses and associated equipment prior to use and in accordance with AS 1891.4
Maintenance / Prestart Checks
Required:
                                           Nil
Certificates of Competency
Required:
                                         Training in inspection, use and maintenance of fall-arrest harnesses & rescue (where applicable)
Training / Competencies Required:
                                         Induction into this Work Method Statement
                                         General Safety Induction
                                        Work Health & Safety Regulation 2011, Part 5.3,                             Safe Work on Roofs Code of Practice 2009 (NSW)
Health, Safety or Environmental                                                          Codes or Standards         VIC Compliance Code – Prevention of Falls in General Construction 2008
                                        Chapter 6
Legislation:                                                                             Applicable to the          Managing the Risk of Fall at Workplace Code of Practice 2011 (QLD)
                                                                                         Works:                     Managing The Risk Of Fall At Workplace Code Of Practice 2011 NSW
                                                                                                                               Managing The Risk Of Fall At Workplace Code Of Practice 2012 TAS
                                                                                                                               Preventing Falls In Housing Construction TAS 2012

584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:       Jamie Gilbert                                                                       VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:                National Health & Safety Co-ordinator                                                                  Page 32
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.