SWMS:19 – Protecting Penetrations & Openings
Safe Work Methods
Responsible Residual
H Controls / Work Methods
Person/s for Risk
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
B 5 E 4 Where practicable, floor penetrations that are cast Hutchinson E 5 H
Protecting penetrations and other Falls from height
24 at the time of pour are to be protected with steel Builders Site 15
openings (e.g. lift shaft & stair well
mesh inlay. Foreman
voids, service pits etc.) via the use of a
physical barrier / edge protection (i.e. Where it is not practicable to cover a
4 penetration/opening, it is to be immediately
where the use of a cover is not
practicable). protected with suitable edge protection.
4 Edge protection is to be minimum 900mm high and
must be able to withstand any downward or
outward force(s) that may be applied to it.
Where mid rails are used, gaps between the top and
4 mid rails and between the mid rail and the floor /
ground must not exceed 450mm.
Edge protection is to be erected across any door
4 opening that leads to an external or internal void
where stairs have not yet been installed.
Lift shafts openings are to be fully meshed until a
purpose designed access cages and lockable doors
4
are fitted to restrict access.
Suitable controls are to be in place to ensure persons
5 placing covers over a penetration / opening, are not
exposed to a fall hazard. Such controls may include
(where relevant):
- placing the cover over the penetration /
5 opening as soon as possible and from a position
where a is not likely to occur, or
- using a travel restraint system (refer – SWMS:
4 20 “Personal Fall Protection”), or
- placement of cover whilst a fall arresting
platform is positioned adequately below the
4 penetration, or
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 35
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.