Skip to the record
The gold standard in government transparency.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 335, section 1. The text section number identifies this passage in the reader.

                                                                              SWMS:20 – Personal Fall Protection
Safe Work Methods
                                                                                    H                Controls / Work Methods                       Responsible           Residual
             Job Steps                     Potential Hazards       L      C   R     O                                                              person/s for            Risk
                                                                                             1. Eliminate 2. Substitute 3. Isolate 4. Engineer
                                                                                    C                         5. Admin 6. PPE                    Monitor & Review      L    C R
                                                                                            Tools, equipment and any other objects /
                                                                                             materials are not to be positioned where they
                                                                                             could fall.

Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel: Follow procedure and report any additional hazards when using the fall protection system
Workers:                                       Follow procedure and report any additional hazards when using the fall protection system
Hutchinson Builders Foreman:                   Monitor SWMS controls and retrieval resources are available on site using the Task Observation Form


Developed & approved on site by:

Name:                                                      Position:                                                    Date:

Matt Leeke / Terry Strahan / Jesse Joyce                   Site Manager/ Foreman

                                                           Workers Representative


I acknowledge that I have been trained in the SWMS listed above, the controls are clearly understood, my qualifications are current to undertake the activity, I will
comply with the SWMS and I have been consulted and had the opportunity to input into the SWMS.


               Print Names                             Position / Trade                                         Signature:                                      Date




584 Milton Road TOOWONG QLD 4066                       SWMS Developed by:     Jamie Gilbert                                                            VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                    Position:              National Health & Safety Co-ordinator                                                       Page 47
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.