Skip to the record
Every meeting, every word.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 344, section 1. The text section number identifies this passage in the reader.

                                                              SWMS: 21 – Swing Stage Suspended Scaffolds - N/A
Safe Work Methods
                                                                                                                                                     Responsib       Residual
                                                                                                                                                          le           Risk
                                                                               H                    Controls / Work Methods                           person/s       L C R
            Job Steps                  Potential Hazards       L    C      R   O           1. Eliminate 2. Substitute 3. Isolate 4. Engineer
                                                                                                           5. Admin 6. PPE                               for
                                                                               C
                                                                                                                                                     Monitor &
                                                                                                                                                       Review
                                                                                        undertaken for each installation of a swing stage            Supplier /
                                                                                        system.                                                      Installer
                                                                                       The Working Load Limit (SWL) will be clearly marked
                                                                                        on the cradle of the suspended scaffold and the limit
                                                                                        will not be exceeded.
                                                                                       Swing-stage operators will verify the mass of the load
                                                                                        to be included in the cradle prior to use.
                                                                                       Materials will be evenly distributed, and not
                                                                                        concentrated in one area.
                                                                                       All electric scaffold hoists will have a device to limit
                                                                                        the lifting capacity of the hoist to a maximum of 1.25
                                                                                        times the rating of the hoist.
                                                                                       Do not operate swing stage during inclement weather.
                                                                                       Ensure no part of the cradle or hoist (except for purpose
                                                                                        designed buffer rollers) comes into contact with the
                                                                                        structure whilst it is climbing, descending or traversing.

                                      Lack of communication    B    5      E   4     Workers operating a swing stage are to have a mobile           Swing Stage     D    4       H
                                      with personnel on the                2          phone with them in the cradle for use in an                    Operators                    1
                                      ground                               4          emergency situation.                                                                        4
                                                                                     If you encounter any faults or experience any difficulty
                                                                               5      whilst operating the swing stage, refer to manual on
                                                                                      cradle or call ……………………………
                                                                                      ……………………………………………... asap.
Leaving the swing stage after use     Unauthorised access      B    5      E   4     Make sure that all ladders or access points are made           Swing Stage     E    5       H
                                                                           2           secure to prevent entry by members of the public.             Operators                    1
                                                                           4         The cradle is to be left in an the designated access zone                                   5
                                                                               3       and is secured against entry by - barricades, if installed
                                                                                       on a construction site - temporary fence where installed
                                                                                       off site on existing buildings
                                                                               3
584 Milton Road TOOWONG QLD 4066                      SWMS Developed by:   Jamie Gilbert                                                             VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                   Position:            National Health & Safety Co-ordinator                                                        Page 56
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.