Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 346, section 1. The text section number identifies this passage in the reader.
SWMS: 21 – Swing Stage Suspended Scaffolds - N/A
Matt Leeke Site Manager/ Foreman
Workers Representative
I acknowledge that I have been trained in the SWMS listed above, the controls are clearly understood, my qualifications are current to undertake
the activity, I will comply with the SWMS and I have been consulted and had the opportunity to input into the SWMS.
Print Names Position / Trade Signature: Date
Monitoring & Review of SWMS Use and Effectiveness
Observation 01 02 03 04 05 06
Log
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 58
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.