Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 349, section 1. The text section number identifies this passage in the reader.
SWMS:22 – Kwik Stage Scaffolds Project Details Project: 71 SEAVIEW TCE SUNSHINE BEACH QLD 4567 Responsible Person: Matt Leeke 0414 691 314 Site Manager: Matt Leeke 0414 691 314 Site Foreman : Terry Strahan 0419 762 427 Activity Description: Site Foreman : Jesse Joyce 0403 745 840 Erecting, dismantling, make alterations and maintaining Kwik Stage scaffolding HSO: Terry Strahan 0419 762 427 Referenced SWMS: SWMS 04 – SWMS 06 – SWMS 08 Plant and Equipment Involved: Kwik Stage scaffold components Lanyards / wrist straps Electric drill Various hand tools energised electrical installations Work at Heights >2m Disturbance of asbestos Confined spaces or services High Risk Activities: Structural alterations requiring Excavation >1.5 metres or near a a contaminated or flammable Demolition of a structure Carried out in or near the following: temporary support tunnel atmosphere A work area with moving water or other liquid that tilt-up or precast concrete Other: ____________________ powered mobile plant involves a risk of drowning PPE Required: Hard Hat Safety glasses / goggles Hearing Protection Fall Arrest Harness Disposable overalls: (Tick as relevant) Safety Boots Face Shield Gloves Respirator High Visibility Vest Maintenance / Prestart Checks Conduct visual inspection of ladder prior to use Required: Maintenance of scaffolding components in accordance with the Manufacturers specifications Certificates of Competency Certificate of Competency required for the erection, modification and dismantling of any scaffold where a person could fall 4m or more, and for all Required: other scaffolds from the ground level, if the height of the structure will be more than 4 metres. Training / Competencies Required: Course Codes: OHSCER219A (Perform Basic Scaffolding) (minimum) Record of training for persons erecting kwik stage scaffolds less than 4metres in height Induction into this Safe Work Method Statement Health, Safety or Environmental Work Health & Safety Regulation 2011, Codes or Standards Qld Scaffolding Code of Practice 2009 – Legislation: Part 5.3, Chapter 6 Applicable to the Works: Qld Code of Practice 2011 – Managing the Risk of Falls at Workplace VIC Occupational Health & Safety Act NSW Code Of Practice 2011 – Managing The Risk Of Falls at Workplace TAS Code Of Practice 2012 – Managing The Risk Of Falls At Workplace 2004, Part 3 AS/NZS 1576 Scaffolding Part 1 – General requirements AS/NZS 4576 Guidelines for Scaffolding 584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 8 – September 2015 P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 61 ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.