                                                                                     SWMS:22 – Kwik Stage Scaffolds
Safe Work Methods
                                                                                      H                    Controls / Work Methods                          Responsible        Residual
                Job Steps                     Potential Hazards        L    C    R    O            1. Eliminate 2. Substitute 3. Isolate 4. Engineer        Person/s for         Risk
                                                                                      C                             5. Admin 6. PPE                       Monitor & Review    L    C      R
                                                                       C    5     E    1     Do not remove any external linings that have been           Person(s) using     E    5      H
Accessing and working from Kwik           Contact with overhead
                                                                                 22           installed in the vicinity of overhead power lines           Scaffold                        1
stage scaffold (cont.)                    powerlines
                                                                                              where there is a risk of any part of the materials,                                         5
                                                                                              person or object entering a power line’s exclusion
                                                                                              zone.
                                                                                            Note: This is 3m minimum for low voltage, if unsure check
                                                                                            with site manager.

                                                                       B    5     E    4     Tools are to be secured by lanyards to the person to                            E    4      H
Special note:                             Falling objects
                                                                                 24           minimise the risk of falling objects - if other workers                                     1
Installing and dismantling in high risk                                                       are at risk of injury or property damage outside the                                        0
areas                                                                                         exclusion area.
                                                                                             Scaffold components are to be secured by lanyards to
                                                                                       4      the scaffold to minimise the risk of falling objects - if
                                                                                              other workers are at risk of injury or property damage
                                                                                              outside the exclusion area.
                                                                                             The scaffold plan will reflect the additional tie or
                                                                                       5      bracing requirements for the component lanyard
                                                                                              connection points.



Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel: Follow procedure and report Kwik stage scaffold hazards
Workers:                                       Follow procedure and report Kwik stage scaffold hazards
Hutchinson Builders Foreman:                   Ensure licenced / competent persons erect Kwik stage scaffolds and regularly inspect Kwik stage scaffolds erected on
site
                                               Monitor SWMS controls on site using the Task Observation form



584 Milton Road TOOWONG QLD 4066                            SWMS Developed by:   Jamie Gilbert                                                               VERSION 8 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                         Position:            National Health & Safety Co-ordinator                                                          Page 67
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.