Skip to the record
For the highest quality transcripts.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 363, section 1. The text section number identifies this passage in the reader.

                                                                                       SWMS:23 – Traffic Control
Safe Work Methods
                                                                                       H                  Controls / Work Methods                        Responsible         Residual
             Job Steps                       Potential Hazards          L   C    R     O          1. Eliminate 2. Substitute 3. Isolate 4. Engineer      Person/s for          Risk
                                                                                       C                           5. Admin 6. PPE                     Monitor & Review     L C R
                                                                                                     any significant changes, or additions
                                                                                                        to signs and devices included in the
                                                                                                        relevant diagram(s).
                                                                                                    Accident Records, including:
                                                                                                     type, location and size of signs and
                                                                                                        devices in use at time of accident,
                                                                                                     photographs of signage arrangement,
                                                                                                     actual width and condition of
                                                                                                        travelled path,
                                                                                                     weather conditions etc.
                                                                        C   3    H      5     The site team is to ensure that all signage and        Site Foreman
Completion of works requiring traffic   Failure to remove all signage
                                                                                 13            devices are removed as soon as possible after                                E    2      L
control                                 and devices
                                                                                               works have been completed.                                                               3


Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel:
Traffic Controllers:                           Ensure current certification as a Traffic Controller is held, follow the procedure and report any inconsistencies
Hutchinson Builders Foreman:                   Ensure planning for traffic control is undertaken and monitor the SMWS requirements on site using the Task
                                               Observation form


Developed & approved on site by:

Name:                                                           Position:                                                 Date:

Matt Leeke / Terry Strahan / Jesse Joyce                        Site Manager/ Foreman

                                                                Workers Representative


584 Milton Road TOOWONG QLD 4066                           SWMS Developed by:   Jamie Gilbert                                                              VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                        Position:             National Health & Safety Co-ordinator                                                        Page 75
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.