                                                                           SWMS:24 – Working with Explosive Power Tools
Project Details

Project:                                                                                                                            Responsible Person:          Matt Leeke 0414 691 314
                                        71 SEAVIEW TCE SUNSHINE BEACH Q 4567
                                                                                                                                    Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                    Site Foreman :               Jesse Joyce 0403 745 840

Activity Description:                   Attaching materials to structure                                                            Site Foreman :               Terry Strahan 0419 762 427
                                                                                                                                    HSO:                         Terry Strahan 0419 762 427

Referenced SWMS:                        Nil

Plant and Equipment Involved:
                                                                                                                                                                    energised electrical installations
                                        Work at Heights >2m                    Disturbance of asbestos                   Confined spaces
                                                                                                                                                                    or services
High Risk Activities:                                                          Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                          temporary support                         tunnel                                     atmosphere
                                        A work area with moving                water or other liquid that
                                                                                                                         tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                   involves a risk of drowning
PPE Required:                           Hard Hat                       Safety glasses / goggles          Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                   Face Shield                       Gloves                            Respirator                       High Visibility Vest
                                             Ensure all PPE is in use
Maintenance / Prestart Checks
Required:                                    Clear area of any rubbish or remove obstacles if possible
                                             Place signage on each side of work face
                                             Check the explosive tool firing function is clear and unobstructed
                                             Maintenance of ladders in accordance with the Manufacturers specifications

Certificates of Competency              Nil
Required:
                                           Induction into this SWMS
Training / Competencies Required:
                                           Experience in the use of explosive tool
                                        Work Health & Safety Act 2011                                                               AS 1873 – Power activated hand held fastening Tools
Health, Safety or Environmental                                                                 Codes or Standards
                                        Work Health & Safety Regulations 2011
Legislation:                                                                                    Applicable to the Works:




584 Milton Road TOOWONG QLD 4066                                SWMS Developed by:      Jamie Gilbert                                                                    VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                             Position:               National Health & Safety Co-ordinator                                                               Page 80
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.