Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
12. RECORD MAINTAINANCE & RETENTION
Throughout the life of the project various documents will be required to be maintained on site. Upon
completion of the project there will be various plans, registers and forms that under law will be required to
be retained for an additional period (see Document Record Matrix HB-HSEQ-F-002).
In the event of a serious or notifiable incident occurring onsite state specific Health & Safety Regulations
require additional retention periods of the following documents:
Incident Report
Safe Work Method Statement associated with the works
Induction Records
Corrective Actions Issued
Toolbox Talks / Pre-start meetings
Photographs
Permits
Regulator reports and
Any additional supporting evidence
All incident reports and supporting evidence are to be reported to HB Corporate Health & Safety Team in
accordance with Section 10 of the WHSMP and Corporate Management Procedure Incident / Accident
Investigation & Reporting (MP:08). All relevant documentation will be retained on file for a period not less
than 7 years following a serious or notifiable event and records will be maintained by the Team HSE Manager
and the Corporate HSE Team.
Page 38 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.