                                                                             SWMS:26 – Demolition of Structures - N/A
Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                      Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                    Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                    Site Foreman :               Terry Strahan 0419 762 427

Activity Description:                   Demolition of a ………………………………………………………………………….structure by                                   Site Foreman :
                                        manual handling and mechanical activities                                                   HSO:                         Terry Strahan 0419 762 427

Referenced SWMS:                        SWMS 04 – SWMS 06 – SWMS 08 – SWMS 17

Plant and Equipment Involved:
                                                                                                                                                                    energised electrical installations
                                        Work at Heights >2m                     Disturbance of asbestos                  Confined spaces
                                                                                                                                                                    or services
High Risk Activities:                                                          Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                          temporary support                         tunnel                                     atmosphere
                                        A work area with moving                water or other liquid that
                                                                                                                         tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                   involves a risk of drowning
PPE Required:                           Hard Hat                      Safety glasses / goggles           Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                  Face Shield                         Gloves                           Respirator                       High Visibility Vest

Maintenance / Prestart Checks              Conduct visual inspection of any scaffold erected
Required:
                                           Conduct plant pre-start checklist
Certificates of Competency
                                         Holder of a Prescribed Activity Certificate – Demolition of Building or Structure – copy to held on site
Required:

Training / Competencies Required:       Induction into this Safe Work Method Statement
                                        Work Health & Safety Regulation 2011, Part 5.3,                                             AS 2601 - 2001 The Demolition of Structures
Health, Safety or Environmental                                                                Codes or Standards
                                        Chapter 6 & Part 4.6                                                                        Demolition Work Code of Practice 2013 QLD
Legislation:                                                                                   Applicable to the Works:
                                                                                                                                    Demolition Work Code Of Practice 2014 NSW
                                                                                                                                    Demolition Work Code Of Practice 2012 TAS
                                                                                                                                    Demolition (Code of practice No.14) 1991 and amendments
                                                                                                                                    1998




584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:      Jamie Gilbert                                                                     VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:               National Health & Safety Co-ordinator                                                               Page 96
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.