                                                                SWMS:28 Operation Of Bin Lifter Electro-Hydraulic (240 Volt)
Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                      Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                    Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                    Site Foreman :               Terry Strahan 0419 762 427
                                        Positioning Bin Lifter to skip, attaching wheelie bins containing rubbish to the Bin        Site Foreman :               Jesse Joyce 0403 745 840
Activity Description:
                                        Lifter and then discharging rubbish from the wheelie bin into the skip
                                                                                                                                    HSO:                         Terry Strahan 0419 762 427

Referenced SWMS:                        SWMS 04, SWMS 06, SWMS 08
                                                Binlifter Electro-Hydraulic
Plant and Equipment Involved:
                                                Wheelie Bins 240Lt or 120Lt
                                                                                                                                                                    energised electrical installations
                                        Work at Heights >2m                    Disturbance of asbestos                   Confined spaces
                                                                                                                                                                    or services
High Risk Activities:                                                          Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                          temporary support                         tunnel                                     atmosphere
                                        A work area with moving                water or other liquid that
                                                                                                                         tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                   involves a risk of drowning
PPE Required:                           Hard Hat                       Safety glasses / goggles          Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                   Face Shield                       Gloves                            Respirator                       High Visibility Vest
                                         Check electrical connections prior to use – Test and tagged every 3 months
Maintenance / Prestart Checks
Required:                                Check battery level ( distilled water)and oil level ( type ISO 68) weekly
                                         Check wheels and working connections
                                        Nil
Certificates of Competency
Required:
                                         Induction into this SWMS.
Training / Competencies Required:
                                         Instruction in Operation of Bin Lifter
                                        Work Health and Safety Act 2011 Parts 3 & 4                                                 QLD Code of Practice – Managing risks of plant in the
Health, Safety or Environmental                                                                 Codes or Standards
                                        Work Health and Safety Regulations 2011,                                                    workplace 2013
Legislation:                                                                                    Applicable to the Works:
                                        Occupational Health & Safety Act 2004 (VIC)                                                 NSW Code Of Practice – Managing the Risks Of Plant In The
                                                                                                                                    Workplace 2014
                                                                                                                                    TAS Code Of Practice – Managing risks of plant in the
                                                                                                                                    workplace 2012
                                                                                                                                    VIC Code of Practice(no.19) – Plant 1995


584 Milton Road TOOWONG QLD 4066                              SWMS Developed by:      Jamie Gilbert                                                                      VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                           Position:               National Health & Safety Co-ordinator                                                                Page 111
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.