SWMS:28 Operation Of Bin Lifter Electro-Hydraulic (240 Volt)
Safe Work Methods
Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R HOC 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
5. Admin 6. PPE Monitor & Review L C R
Stand down of Bin Lifter Miss use of Bin Lifter by B 4 E 5 Remove key from Bin Lifer when not in Trained worker E 1 L
untrained persons 21 use 1
Remove Bin Lifter from side of skip and
store in an area where it can’t be
damage
Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel: Follow procedure and report hazards
Workers: Follow procedure and report hazards
Hutchinson Foreman/HSO: Ensure trained persons only use the Bin Lifter
Monitor SWMS controls on site using the Observation form
Developed & approved on site by:
Name: Position: Date:
Matt Leeke / Terry Strahan / Jesse Joyce Site Manager/ Foreman
Workers Representative
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 114
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.