Skip to the record
Accept no substitutions.

Council archive · source document

Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 402, section 1. The text section number identifies this passage in the reader.

                                                            SWMS:28 Operation Of Bin Lifter Electro-Hydraulic (240 Volt)
Safe Work Methods
                                                                                                            Controls / Work Methods                        Responsible         Residual
             Job Steps                     Potential Hazards              L   C    R    HOC         1. Eliminate 2. Substitute 3. Isolate 4. Engineer      Person/s for          Risk
                                                                                                                     5. Admin 6. PPE                     Monitor & Review     L C R
Stand down of Bin Lifter              Miss use of Bin Lifter by           B   4    E       5             Remove key from Bin Lifer when not in         Trained worker        E   1       L
                                      untrained persons                           21                      use                                                                             1
                                                                                                         Remove Bin Lifter from side of skip and
                                                                                                          store in an area where it can’t be
                                                                                                          damage


Methods for monitoring and reviewing effectiveness of chosen control measures
Hutchinson Builders & Subcontracted Personnel: Follow procedure and report hazards
Workers:                                       Follow procedure and report hazards
Hutchinson Foreman/HSO:                        Ensure trained persons only use the Bin Lifter
                                       Monitor SWMS controls on site using the Observation form

Developed & approved on site by:

Name:                                                             Position:                                                 Date:

Matt Leeke / Terry Strahan / Jesse Joyce                          Site Manager/ Foreman

                                                                  Workers Representative




584 Milton Road TOOWONG QLD 4066                          SWMS Developed by:      Jamie Gilbert                                                              VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                       Position:               National Health & Safety Co-ordinator                                                        Page 114
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.