                                                                            SWMS: 29 – Working near Over Head Power Lines
Project Details

Project:                                71 SEAVIEW TCE SUNSHINE BEACH QLD 4567                                                           Responsible Person:          Matt Leeke 0414 691 314
                                                                                                                                         Site Manager:                Matt Leeke 0414 691 314
                                                                                                                                         Site Foreman :               Terry Strahan 0419 762 427
                                        Working as a Safety Observer to ensure that mobile plant activities and building Site Foreman :                               Jesse Joyce 0403 745 840
Activity Description:
                                        materials are observed when manoeuvred where any part of the plant or materials
                                                                                                                         HSO:                                         Terry Strahan 0419 762 427
                                        could enter the exclusion zone of live electrical high and low voltage overhead
                                        power lines during construction activities
Referenced SWMS:                        Nil
                                                Building Materials
Plant and Equipment Involved:
                                                Mobile Plant
                                                Stationary Mobile Plant
                                                                                                                                                                         energised electrical installations
                                        Work at Heights >2m                        Disturbance of asbestos                    Confined spaces
                                                                                                                                                                         or services
High Risk Activities:                                                               Structural alterations requiring          Excavation >1.5 metres or near a           a contaminated or flammable
                                        Demolition of a structure
Carried out in or near the following:                                               temporary support                         tunnel                                     atmosphere
                                        A work area with moving                     water or other liquid that
                                                                                                                              tilt-up or precast concrete                Other: ____________________
                                        powered mobile plant                        involves a risk of drowning
PPE Required:                           Hard Hat                           Safety glasses / goggles           Hearing Protection                Fall Arrest Harness              Disposable overalls:
(Tick as relevant)                      Safety Boots                       Face Shield                       Gloves                             Respirator                       High Visibility Vest
                                               Conduct visual inspection of any distance markers or tiger tails are maintained
Maintenance / Prestart Checks
Required:                                      Conduct tool box talk with operators to ensure directions are followed
                                               Operators carry out on plant to be operated
Certificates of Competency                     Plant operator hold high risk licenses for the plant operated
Required:
                                         Completed esitrain course M31 – or equivalent course
Training / Competencies Required:
                                         Induction into this Safe Work Method Statement
                                         General Safety Induction
                                        QLD Electrical Safety Act & Regulation 2002                                                      QLD Electrical Safety Code of Practice 2010 –Risk Management
Health, Safety or Environmental                                                         Codes or Standards
                                        VIC OH&S Regulations 2007, Part 3.5.39                                                           QLD Electrical Safety Code of Practice 2010 – Working near
Legislation:                                                                            Applicable to the Works:
                                                                                                                                         overhead and underground Electric Lines
                                                                                                                                         QLD Electrical Safety Code of Practice 2013 – Managing
                                                                                                                                         Electrical Risks in the Workplace
584 Milton Road TOOWONG QLD 4066                                SWMS Developed by:        Jamie Gilbert                                                                       VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                             Position:                 National Health & Safety Co-ordinator                                                                 Page 116
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.